Tugas 8 Gambar Teknik

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 4

160,00

R7,00 24,00

,0 0

45,00
n 8

10,00
10,00
24,00
54,00
58,00
45,00
TAMPAK ATAS
10,00

55,00 10,00
n1
4,0
0

35,00
0
2 0,0 R 2,00 n10,00
R

0
n5
6,0
10,00 2,00
34,00 53,00

TAMPAK DEPAN TAMPAK KANAN

Revision Index Drawn By : Asbichurrohman Scale : 1:2


Nim : E12.2020.01440 Unit : mm
Date : 06 Juni 2024 Material :
Checked By : Jazuli ST MEng Sign :

A4 ASSEMBLY TUGAS 8
Dwg No.
INDUSTRIAL ENGINEERING
UDINUS OPERATION
08
Origin : Rev : Rev by : SN NS
160,00
n8,00

45,00
10,00
10,00 34,00
54,00

TAMPAK ATAS

45,00

10,00
n2
8 ,0
0

35,00
00
0, n14,00

55,00
R2

, 00
10,00 2,00
R 20
34,00 53,00 22,50

TAMPAK DEPAN TAMPAK KANAN

Revision Index Drawn By : Asbichurrohman Scale : 1:2


Nim : E12.2020.01440 Unit : mm
Date : 27 Mei 2024 Material :
Checked By : Jazuli ST MEng Sign :

A4 TUGAS 8
Dwg No.
INDUSTRIAL ENGINEERING
UDINUS OPERATION
08
Origin : Rev : Rev by : SN NS
58,00
2,00 54,00

n14
,0 0 0
n10,0

Revision Index Drawn By : Asbichurrohman Scale : 1:2


Nim : E12.2020.01440 Unit : mm
Date : 27 Mei 2024 Material :
Checked By : Jazuli ST MEng Sign :

A4 TUGAS 8
Dwg No.
INDUSTRIAL ENGINEERING
UDINUS OPERATION
08
Origin : Rev : Rev by : SN NS
56,00

2,00
R7,00

28,00
TAMPAK ATAS
5,00

2 ,00
n4 ,0 0
R2

n56,00

26,00

14,00
TAMPAK DEPAN TAMPAK KANAN

Revision Index Drawn By : Asbichurrohman Scale : 1:1


Nim : E12.2020.01440 Unit : mm
Date : 27 Mei 2024 Material :
Checked By : Jazuli ST MEng Sign :

A4 TUGAS 8
Dwg No.
INDUSTRIAL ENGINEERING
UDINUS OPERATION
08
Origin : Rev : Rev by : SN NS

You might also like