Doc No.

- SL/RE/18

CHECK LIST FOR CONCRETE VIBRATOR


Initial Check / Routine Check (Strike out which is not applicable) Site:

Make & Model: Equipment No.:

10

CHECK ITEMS (to be checked on day of use ) - Complied -√ Not complied - X


Sl. No. DESCRIPTION Date
The ON/OFF switch free of concrete and it is working
1
properly.

2 The fan guard in place (for diesel/petrol).

3 The body earthing connected properly.


4-Core cable should be used for 3-Phase Vibrator &
4
provided with 5- pin IP- 44 plug/top.
The Cable connected to the Terminal Box & no live parts are
5
exposed.

6 The supply power to the Vibrator routed through RCCB.

7 The power cable free from damage & joints

8 All the parts of machine are properly Bolted.

9 No diesel / oil leakage from machine.

10 The couplings are fitted properly.

11 The vibrator needle works properly.

Equipment is fit for use - Yes / No

Checked by Contractor Safety officer / Supervisor

Checked by SIEMENS Safety Officer / Site In Charge


Note: If any of the above points are not complied, check all the points again after rectification
Remarks

Restriction Page 1 of 1