Professional Documents
Culture Documents
LPF-P021.15-AB-ARC-ES-003A
LPF-P021.15-AB-ARC-ES-003A
5% SLOPE
REQUIRED : 2M RADIUS
DRINKING
FOUNTAIN
PL02
UP
200*100*5MM THICK.
SL01
EDB-UPS
RECYCLABLE WASTE
MANAGEMENT FACILITY
PL03/
SL02/
FL01
20
60
CSK SCREW: HEAD MATCHING TO
SIDE RETURN FINISH
100 100 MALE FEMALE CONNECTOR: MS 50*50*5MM
THICK. SHS
200
MS L ANGLE: 60*60*5MM THICK FIXED WITH M8
NUT & BOLT FIXING
M8 NUT & BOLT FIXING
EXISTING METAL
MS 60*60*4MM THICK. SHS FINISH
200
125
COLUMN
PAINT FINISH
4 NO. M12*100MM FISCHER NUT BOLT
38
DETAILS - A
AS-BUILT
SCALE - 1:4
505
372
30
00 20/01/2023 AS BUILT DRAWING SLMN
Rev. Date Description By
20
PROJECT:
TRANSFORMER
AL HEBIAH THIRD, DUBAI, U.A.E.
145
CLIENT:
CONNECTOR: MS 50*50*5MM THICK. SHS
660
200
TEL: +971 4 337 2888,
FAX: +971 4 337 0352,
P. O. BOX 3670, DUBAI, UAE
MAIN CONTRACTOR:
AS BUILT DRAWING
60
DRAWING TITLE:
GRC CLADDING: EXISTING 30 200
56 ELEVATION - 02 (REAR)
480