Professional Documents
Culture Documents
Detail Support Busduct Final
Detail Support Busduct Final
CLIENT
101
DOCK LEVELER
DOCK LEVELER
DOCK LEVELER
DOCK LEVELER
DOCK LEVELER
DOCK LEVELER
1
BM
BM
BM
BM
BM
BM
BM
BM
BM
BM
BM
MB
MB
BM
BM
BM
MB
BM
STORAGE TANK
STORAGE TANK
BM
BM
BM
BM
BM
BM
BM
MB
BM
MB
BM
BM
BM
MB
BM
BM
BM
BM
DOCK LEVELER
CONSULTANT
DOCK LEVELER
DOCK LEVELER
전극 사무실
45석
(4000x4000)
=80EA
13X8
10X8
=104EA
단 단
=80EA
13X8
=104EA
단 10X8
1000x2200(H)
1000x2200(H)
사무직 통합 사무실
1000x2200(H)
218석
1000x2200(H)
=104EA
13X8
단
1000x2200(H)
=176EA 22X8
단
10X8
단
=80EA
108 pergola
PIPE RACK
pergola
pergola
111
MAIN STORAGE
SRP/NMP-1
∅2200
LN2 STORAGE TANK
FIRE ENGINE ACCESS
KEEP CLEAN
PT. WIRATMAN
10Ton
∅2200
10Ton
LN2 STORAGE TANK
sC2a: H-200x200x8x12
sC2a: H-200x200x8x12
300Nm3/hr
300Nm3/hr
STAND BY
VAPORIZER
VAPORIZER
sC2a: H-200x200x8x12
sC2a: H-200x200x8x12
GSU
300Nm3/hr
DROP OFF
(FUTURE) 단단단
DROP OFF
(FUTURE)
107 DN
PAD
AC TOWER
110
NORTH NOTE:
PHASE 2 112
1,500
AREA
VARY 686 VARY
50 100
150
DETAIL-1
TOP VIEW
DESIGN HYUNDAI WIRATMAN
DESIGNED Y. S. KIM -
984
887
1.134
1.037
101
DOCK LEVELER
DOCK LEVELER
DOCK LEVELER
DOCK LEVELER
DOCK LEVELER
DOCK LEVELER
BM
BM
BM
BMBM
BM
BMBMBM
BMBMBMBM
BM
BMBM
BM
BMBMBM
BMBMBMBM
STORAGE TANK
STORAGE TANK
BM
BM
BMBMBMBMBMBMBM
BM
BMBM
BM
BM
BMBMBMBMBMBMBM
BM
BMBM
BMBM
BMBM
DOCK LEVELER
DOCK LEVELER
DOCK LEVELER
전극 사무실
45석
(4000x4000)
=80EA
13X8
단
=104EA 10X8
단
13X8
10X8
단
=104EA
단
=80EA
1000x2200(H)
1000x2200(H)
사무직 통합 사무실
1000x2200(H)
1000x2200(H)
218석
=104EA
13X8
단
1000x2200(H)
=176EA
22X8
단
10X8
단 =80EA
108 pergola
PIPE RACK
pergola
pergola
111
"1" "1"
FIRE ENGINE ACCESS
KEEP CLEAN
SRP/NMP-1
∅2200
MAIN STORAGE
LN2 STORAGE TANK
10Ton
∅2200
LN2 STORAGE TANK
sC2a: H-200x200x8x12
sC2a: H-200x200x8x12
10Ton
300Nm3/hr
STAND BY
VAPORIZER
300Nm3/hr
VAPORIZER
sC2a: H-200x200x8x12
sC2a: H-200x200x8x12
GSU
300Nm3/hr
IBC TANK
DROP OFF
(FUTURE) 단단단
(FUTURE) 104
(FUTURE)
DROP OFF
(FUTURE)
107 DN
150
150
PAD
AC TOWER
110
NORTH
PHASE 2 112
KEY PLAN
936 936
PROJECT TITLE
DATE 2021.12.17