Professional Documents
Culture Documents
yumuuym
yumuuym
350_DDD DDD
399_-----------------------------------------------
400_ECL ECL
420_ECAD -
430_ID ID
440_MCAD -
490_Accessories -
499_----------------------------------------------F
500_SW_Sources -
510_SW_Release -
599_-----------------------------------------------
600_DAD DAD
610_SVR SVR
620_QTR QTR
650_ATP ATP
680_Approvals -
690_DoC DoC
699_-----------------------------------------------
700_PDS PDS
770_Service_Manual -
780_TSG TSG
799_-----------------------------------------------
800_DMRI DMRI
810_DRC DRC
820_TBOM TBOM
830_BOM BOM
840_MCBOM MCBOM
849_-----------------------------------------------
850_ATI ATI
860_ASI ASI
870_PAI -
880_MPD MPD
.../APR
…/MPP
…/PCP
…/PPF
…/PCPA
…/Tooling-Fixture
…/Training-Record
…/Line-Setup-Checklist
…/Line-Setup-Instruction
…/Study-Report
…/Production-Sample
…/3rd-party-report
890_MPV MPV
899_-----------------------------------------------
900_DHR DHR
910_IIP-R IIP-R
920_Rework_I-R -
930_CR_CN_Links CR
CN
940_SR_Links SR
950_ATR ATR
960_LL LL
unused_folders
001_Quotations_Sales -
002_Calculation_Sales -
003_Orders_and_Confirmations -
004_Delivery_Notes -
005_Invoices -
009_-----------------------------------------------
010_CSD CSD
015_Presentations -
020_Contracts -
030_Customer_Data -
040_Supplier_Data -
090_ESR ESR
099_-----------------------------------------------
100_PMP-R PMP / PMR
110_PS PS
120_QAP QAP
130_Weekly_Status -
140_MOM MOM
150_Project_Correspondence -
170_MSR
180_DRR DRR
190_PSR PSR
199_-----------------------------------------------
210_Quotes -
220_Requisition_Note -
230_Purchase_Order -
240_Prod_Calc -
249_-----------------------------------------------
English
Source Control Drawing
Catalogue Part Specification
First Article Inspection Plan / Report
Industrial Design
Declarations of Conformity
Change Requests
Change Notification
Special Releases
Acceptance Test Reports
Lessons Learned
There are many folders defined for differrent purposes. Not always every folder
need to be used. Those not used folderes are always put into "unused folders"
and in case we need it later on we cut and paste it a level higher and use it.
Customer Specification
Minutes of Meeting
-
-
-
-
-
"Sonderfreigaben"
Kundenspezifikation
Musterbau
-
Projekt-Zeitplan
-
Besprechungsnotizen
Meilestein-Review-Report
Meilestein-Review-Report
Projekt-Status-Report
Quotes for parts and assemblies from suppliers
Project Product Folder Template
009_----------------------------------------------------- = 009_----------------------------------------------
010_CSD_Customer_Specification reduziert 010_CSD
015_Presentations = 015_Presentations
020_Agreements_and_Contracts reduziert 020_Contracts
030_Customer_Data = 030_Customer_Data
040_Supplier_Data = 040_Supplier_Data
N/A new 090_ESR
099_----------------------------------------------------- = 099_----------------------------------------------
100_PMP_Programm_Management_Plan reduziert 100_PMP-R
110_PMS_Project_Schedule reduziert 110_PS
120_QAP_Quality_Assurance_Plan reduziert 120_QAP
130_WS_Weekly_Status reduziert 130_Weekly_Status
140_MM_Meeting_Minutes reduziert 140_MOM
150_Project_Correspondence = 150_Project_Correspondence
N/A new 170_MSR
180_Design_Review_Reports reduziert 180_DRR
220_Requisition_Note = 220_Requisition_Note
230_Purchase_Order = 230_Purchase_Order
240_Product_Calculation = 240_Prod_Calc
249_----------------------------------------------------- = 249_----------------------------------------------
250_SCD_Source_Control_Documents reduziert 250_SCD_CPS
830_BOM = 830_BOM
840_MCBOM = 840_MCBOM
849_----------------------------------------------------- = 849_----------------------------------------------
850_Acceptance-Test_Instructions reduziert 850_ATI
860_Assembly_Instructions reduziert 860_ASI
-
CSD Customer Specification Kundenspezifikation
-
-
-
-
ESR Engineering Sample Request Musterbau
-
PMP / PMR Project Management Plan / Project Management Report -
PS Project Schedule Projekt-Zeitplan
QAP Quality Assurance Plan -
-
MOM Minutes if Meeting Besprechungsnotizen
-
Milestone Review Reports Meilestein-Review-Report
DRR Design Review Reports Meilestein-Review-Report
-
-
- Product Calculation
-
SCD Source Control Drawing -
CPS Catalogue Part Specification
-
FAIP / FAIR First Article Inspection Plan / Report -
-
-
URS User Requirement Specification -
SRD Systen Requirements Document -
QTP Qualification Test Procedure -
FMEA Failure Mode Effect Analysis -
… FMEA of the product
… FMEA of the production processes
… further risk analysis
-
MPD Manufacturing Process Description
… Assessment Production Ramp-up
… Manufacturing Process Parameter
… Process Control Plan
… Production Process Flow
CR Change Requests
CN Change Notification
Quotes for parts and 19.10.2023: machen wir nur 210_Quotes draus Sollte man versuchen zu kürzen
assemblies from weil man oft weitere Unterordner
suppliers zu besseren Sortierung anlegt
19.10.2023: bleibt, muss nicht hochgeholt Wird der noch gebraucht, wer nutzt
werden. Könnte aber sein, dass man mal eine den? Was soll hier abgelegt
spezielle PO ablegen möchte werden?
19.10.2023: gekürzt zu Prod_Calc Sollte man versuchen zu kürzen
weil man oft weitere Unterordner
zu besseren Sortierung anlegt
brauchen wir den Ordner noch im liegen aktuell nur Links auf die CPS-
Projektverzeichnis? TBOM u. BOM sollen in Ordner drin. kann also gelöscht
120_SCD_CPS liegen werden
19.10.2023: ok, lassen wir, muss man ja nicht
aus "unused folders" hochholen
220_BANF ?
240_Prod_Calc ?
hier liegen neben den ATPs auch die TDS' ab, Vorschlag 650_TDS_AT
Liegt zwar nur die Links von
TBOMs u. BOMs drin aber
ist wichtig um schnell auf
die Stückliste zu kommen
(wenn P/Ns gerade nicht im
Kopf)