Date :
Inspection team members :
Well Site visited :
A site inspection is to be conducted as per published inspection schedule. The inspection team should have a minimum of three people, one team member is
to be at Supervisory level or from the HSE support group. The team should inspect the entire operations area, inspecting housekeeping standards and
identifying safety discrepancies at the operations site with a view to rectify them in such a way that HSE standards are complied with. Non conformances are to
be recorded and must be closed out with the relevant closure form. Responsible action parties are to be clearly identified within the action point summary.
Pump discharge lines, secured by approved restraint system (not whip checks) Yes
No threaded connection on pump discharge line, includes wellhead interface. No N/A
Yes
NRV and POV fitted to high pressure discharge line. Yes
All items within high presure discharge line, banded with test date and WP. Yes
Appropriate safety signage in place. Yes
Pump unit correctly earthed. Yes
Pumping unit air receiver in test with POV fitted. Yes
Lifting equipment in test, correctly marked and in acceptable condition. No N/A
773016544.xls 1
FLUID TANK ~ 1 COMMENTS
Comments:-
Comments:-
Are all vehicles correctly reversed parked, 5m from flow line, 15m from wellhead ? Yes
Check vehicles have Drive Rights fitted. Yes
Confirm First Aid kit is available and maintained. Yes
Fire extinguisher available, correctly secured and in test. Yes
Is vehicle cab is free from unsecured items. Yes
Check tyres for wear and cuts ~ is tyre condition acceptable. Yes
List ID numbers of Vehicles inspected. EJ-706-AA
Comments:-
EMS COMMENTS
The team can enumerate the Think Process Safety elements involved in their job
1)
2)
3)
4)
773016544.xls 2
5)
6)
7)
8)
9)
10)
773016544.xls 3