Progress of WUA
Yearwise Achivement upto March 2021 Progress of WUA upt
Sr. Name of Project WUA under Cumulative
No. Project WUA PMKSY, CADWM Upto March 2017-18 2018-19 2019-20 2020-21 upto march Gazzette
2017 Gazzette Notification Notification 3
2021
1&2 Published Published
No. CCA No. CCA No. CCA No. CCA No. CCA No. CCA No. CCA No. CCA (No.) CCA (No.)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
1 Upper 7 2800 7 2800 0 0 0 0 0 0 0 0 0 0 0 0 7 2800 7
Kundlika
Medium
Project
Tq.Wadwani
Dist. Beed
Annex 1
Progress of WUA upto March -2021 Progress of WUA in year 2021-22 upto December -21
WUA Handing WUA Handing
over/Taken over/Taken
Gazzette OverComplete OverComplete
Notification 3 Registered with Gazzette Notification Gazzette Notification 3 Registered with Remarks if
Published Department 1&2 Published Published Department any
CCA (No.) CCA (No.) CCA (No.) CCA (No.) CCA (No.) CCA (No.) CCA
22 23 24 25 26 27 28 29 30 31 32 33 34 35
2800 0 0 0 0 0 0 0 0 0 0 0 0
Executive Engineer
Beed Irrigation Division Beed
Annex 2
Details of CADWM works in PMKSY
Sr. No Name of CCA of Cost of project Details of Tenders for CADWM works
project project for (CAD - No. of CCA (Ha) cost (Rs cr) date of issue of date of date of issue of Completion period / Remark / present status
included in WM) package Tender Notice Acceptance of work order date of completion
PMKSY (Tender wise) tender
(CAD-WM)
1 2 3 4 5 6 7 8 9 10 11 12
Executive Engineer
Beed Irrigation Division Beed
Annex 5
1 2 3 4 5 6 7 8 9 10 11
I Structural Interventions
A Survey, Planing, Design 0.34 0.34 0 0 0 0 0 0
B OFD works
i) Construction of unlined Field
0.000 0.000 0.000 0.000 0.000 0.00 0.00 0.000
Channels
ii) Construction of lined Field Excess Expediture
Channels, laying of underground by 0.2464 Cr.
pipelines etc. for gravity flow 7.700 7.878 0.000 0.000 0.300 0.07 0.07 0.3000
Executive Engineer
Beed Irrigation Division Beed
file:///conversion/tmp/activity_task_scratch/773032401.xlsx Mon f
Annex 7
Proforma 3 Monthly finacial progress Report Central & State Shares for month ending Decemebr-2021
Name of project :- Upper Kundlika Medium Project Tq.Wadwani Dist. Beed Cost in Cr.
Sr.no Item Total Cost of the Project Expenditure till last year Expenditure during the CFY_2021-22 Total Expenditure during current Total Remarks if any
(CADWM) up to March 2021 till the end of previous month Expenditure During Dec- 2021 Financial year (till the end of Expenditure
Nov 2021 month Dec- 2021 ) Upto end of
month Dec-
2021
(8+17)
Central state Total Central State total Central state total Central state total Central state total
share Share share Share share Share share Share share Share (11+14)
(9+12) (10+13)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
I Structural Interventions
A Survey, Planing, Design 0.17 0.17 0.34 0 0.336 0.336 0 0 0 0 0 0 0 0 0 0.34
B OFD works 0
i) Construction of unlined Field
Channels 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
ii) Construction of lined Field Expenditure excess by
Channels, laying of underground 0.246a cr
pipelines etc. for gravity flow 3.85 3.85 7.700 0.522 7.36 7.882 0 0.000 0.000 0 0.07 0.07 0.00 0.07 0.07 7.95
Executive Engineer
Beed Irrigation Division Beed
file:///conversion/tmp/activity_task_scratch/773032401.xlsx
Annex 6
Proforma 2 for Monthly Physical progress report for the Month ending Dec -2021
Name of Project-Upper Kundlika Medium Project
Tal.- Wadwani, Dist.Beed-
Name of State-Maharashtra (Area in Ha)
Sr.no Item Unit Total Achievement Target for current Achievement Target for the - Achievement Cummulative Target for Remarks if any
quantity of upto end of financial during current DEC-2021 during Month- achievement next Month-
work previous year__2021-22 financial year Dec-2021 of current year January 2022
involved financial upto end of upto end of
year_2020-21 previous Month Month Dec
NOV- 2021 2021
1 2 3 4 5 6 7 8 9 10 11
I Structural Interventions
A Survey, Planing, Design Ha 2800 2800 0 0 0 0 0 0
B OFD works Ha
i) Construction of unlined Field Channels Ha 0 0 0 0 0 0 0 0
ii) Construction of lined Field Channels, laying Ha
of underground pipelines etc. for gravity flow 2200 2200 0 0 0 0 0 0
Executive Engineer
Beed Irrigation Division Beed