Hybrid Solar Installation

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 5

SOLAR SYSTEM DESIGN FOR HOTEL

MIADJOE- ANEHO BEACH

AC/DC COUPLED INSTALLATION

40kVA INVERTER CAPACITY, 28.16kWp


SOLAR PANELS WITH 40kWh BYD LITHIUM
BATTERY STORAGE

ANEHO, TOGO
440W SOLAR FABRIK PANEL

PROJECT CONTRACTOR DRAWING TITLE APPROVED BY DATE


M. Holger &Lorenzo 06/12/2023
28.16kWp HYBRID SOLAR SYSTEM FOR HOTEL MIADJOE ANEHO BEACH,
TOGO Solar panel layout for 28.16 kWp hybrid CHECKED BY. DRG NO:
solar system using 64 pieces of 440W S. MARIUS 23-COOL-LIO-01
LOCATION CLIENT
solar Fabrik panel
DESIGNED BY SCALE:
HOTEL MIADJOE ANEHO- TOGO Mr Lionel Djondoh 00 06/12/2023 M. ACAKPO SUBMITTED FOR APPROVAL

REV DATE BY M. ACAKPO NTS


DESCRIPTION
PROJECT CONTRACTOR DRAWING TITLE APPROVED BY DATE
M. Holger &Lorenzo 06/12/2023
28.16kWp HYBRID SOLAR SYSTEM FOR HOTEL MIADJOE BEACH- ANEHO
TOGO Solar panel layout 28.16 kWp Hybrid CHECKED BY. DRG NO:
solar system using 64 pieces of 440W S. MARIUS 23-COOL-LIO-01
LOCATION CLIENT
solar Fabrik panel
DESIGNED BY SCALE:
HOTEL MIADJOE ANEHO- TOGO Mr Lionel Djondoh 00 06/12/2023 M. ACAKPO SUBMITTED FOR APPROVAL

REV DATE BY M. ACAKPO NTS


DESCRIPTION
PHOTOVOLTAIC PANELS (PV)

PHOTOVOLTAIC PANELS (PV)

PHOTOVOLTAIC PANELS (PV)


12 No. 440W,

12 No. 440W,

12 No. 440W,
VICTRON CONTROL
REMOTE
MONITORING DEVICE
Cat 6 ETHERNET CABLE
CREBO
2x0.5mm2 PVC Cable GX
Rj45 CABLE Rj45 CABLE INTERNET
VICTRON ROUTER
DC LYNX
SOLAR DC
VICTRON MPPT
CHARGE DISTRIBUTOR
2No. 1x6mm2
COMBINER BHS
CONTROLLER
3/1

DC Cables 2No. 1x10mm2


250/85
2No. 1x25mm2 DC Cables 12x16mm2 PVC Cable

DC 12x16mm2 PVC Cable


VICTRON MPPT
SOLAR DC
CHARGE
2 COMBINER BHS

2No. 1x6mm 3/1


CONTROLLER

DC Cables 2No. 1x10mm2 2No. 1x25mm2 DC Cables 1x50mm2 (+ve) + -


+ 1x50mm2 (-ve)
250/85

DC PVC Cable
2
SOLAR DC
VICTRON MPPT
CHARGE
1x50mm (+ve)
2 + 1x50mm2 (-ve)
COMBINER BHS

2No. 1x6mm 3/1


CONTROLLER

2No. 1x25mm2 DC Cables PVC Cable


DC Cables 2No. 1x10mm2
250/85 1x50mm2 (+ve)
DC
+ 1x50mm2 (-ve)
PVC Cable 8 pieces of 5kWh,
48V LITHIUM BATTERY

10kVA, 3-ɸ FRONIUS 10kVA, 48Vdc/230Vac VICTRON 10kVA, 48Vdc/230Vac VICTRON 10kVA, 48Vdc/230Vac VICTRON
SYMO INVERTER MULTIPLUS INVERTER MULTIPLUS INVERTER MULTIPLUS INVERTER

Rj45 CABLE Rj45 CABLE Rj45 CABLE

OUT2

OUT2

OUT2
OUT1

OUT1

OUT1
14 No. 440W, STRING 1 2No. 1x6mm2

IN1

IN1

IN1
IN2

IN2

IN2
N

N
PHOTOVOLTAIC PANELS (PV)

14 No. 440W, STRING 2 2No. 1x6mm2


PHOTOVOLTAIC PANELS (PV)
DC

SURGE
PROTECTION
DEVICE (SPD)
DISTRIBUTION
100A, 4P PANEL 100A, 4P
ISOLATION SWITCH ISOLATION SWITCH

L1

L2

L1

L3
L3

L2
N

N
CEET MANUAL TRANSFER 100A MANUAL TRANSFER
METER SWITCH SWITCH
630A

GRID

630A

AC SURGE
PROTECTION
DEVICE
AC

G
GENERATOR

PROJECT CONTRACTOR DRAWING TITLE APPROVED BY DATE


M. Holger &Lorenzo 06/12/2023
28.16kWp HYBRID SOLAR SYSTEM FOR HOTEL MIADJOE ANEHO BEACH,
TOGO CHECKED BY. DRG NO:
SCHEMATIC DIAGRAM FOR 28.16kWp
LOCATION CLIENT S. MARIUS 23-COOL-LIO-01
GRID-TIED SOLAR SYSTEM
DESIGNED BY SCALE:
HOTEL MIADJOE ANEHO- TOGO Mr Lionel Djondoh 00 06/12/2023 M. ACAKPO SUBMITTED FOR APPROVAL

REV DATE BY M. ACAKPO NTS


DESCRIPTION
PROJECT SCHEDULE

S/N Activity (Work)


Day1 Day2 Day3 Day4 Day5 Day6 Day7 Day8 Day9 Day10 Day11
1. Arrival of Solar PV components and
equipment
2. Site induction for all team members

3. Careful assessment and study of the


roofs. Marking out of Solar Panels

4. Marking out of Inverters and other


accessories
5. Panel Mounting Structure
Installations
6. Running of cables
7. Mounting of Solar Modules on the
roof
8. Installation of Inverters, MPPT and
AC combiners
9. Installation of Battery
10. Connection of cables between
Inverters and AC Combiners
11. Connection to Tie-in points
12. Testing of strings, Inverters, AC
combiners, and other accessories
13. Configuration and training