Job Safety Analysis

JOB SAFETY ANALYSIS RECORD SHEET


DEPARTMENT: DATE PREPARED: DATE ISSUED:
PROJECT: MODIFICATION WORKS AT AL KHALEEJ HOUSE 20-Mar-2023
BLDG #9-999 @ABQAIQ.
JSA NO.: 005

DESCRIPTION OF JOB/TASK: Installation of Fire Sprinkler

PREPARED BY: REVIEWED BY: APPROVED BY:

Altaf Hassain
Safety Officer

REFERENCES:
Work Permit System GI-2.100
SA-CSM Hand Tools and Power Tools under Section 11.4 Requirements for Specific Types of Hand Tools
Lockout and Use of Hold tags process G.I 6.012

SAFETY EQUIPMENT REQUIRED: Safety Hat, Safety Shoes, Safety Gloves, Safety Glasses, Ear Plugs; pad lock & hold tag; caution/ warning tape
Note: Adequate and special PPE must also be considered for this task

JOB
STEP
NO. SEQUENCE OF BASIC JOB
POTENTIAL HAZARDS REQUIRED HAZARD CONTROLS/SAFE WORK PROCEDURES
STEPS

Coordinate with authorized Facility user/Proponent Department.


Activity planning and work Improper planning/coordination Strictly comply with Saudi Aramco’s Work Permit System under G.I
1 Failure to obtain Required Work Permit 2.100 and CSM II-14 Demolition.
start-up

Document: - Job Safety Analysis. Page 1 of 7


Obtain a required Work Permit from the Area Supervisor before
starting the job and closing the Work Permit once task is done. See
SA-G.I. 2.100.
Get the permit validated for the specific day.
If required, arrange for the disconnection of all affected service
lines in accordance with Isolation, Lockout and Use of Hold tags
process G.I 6.012.

Installation of Firefighting Slippery Floor. Foreman/ Supervisor/Worker need to inspect the floor before start
Pipes and sprinkler using Damage Ladder. working on ladder.
portable Ladder Fall form height. Safety Officer /Supervisor should inspect the ladder weather
Falling objects. it is in good condition.
Over loading. Incompetent worker should not work on the ladder.
Access & egress Worker should not lift any slippery or Heavy Material which has
potential to fall.
Worker should not keep any material on the steps of the ladder.

Installation of sprinkler Sharp edge item A qualified and experienced plumber is needed to optimally install
Sprinkler glass may damage this network of pipes to fit the sprinklers with high volumes of water
when the need arises.
Ensure sprinkler installation according to NEPA 13 AND 14.
Use necessary ppe while using sharp glass Materials.
Usage of Hand tools & Incompetent Person Before Starting the worker should be aware of power tools and
Power Tools wear mandatory PPE.
Tool Box should be conducted by safety officer before starting the
activity.
Damage Power Tools & Hand Tools Safety Officer / Supervisor /Foreman should inspect tools on regular
basis to avoid any incident. And Damage tools should be removed
from the site.

Document: - Job Safety Analysis. Page 2 of 7


Uninspected Power tools & Hand Tools All hand tools and Power tools should be inspected monthly with
color coded tag. And inspection should be done certified Electrician
in presence of Safety Officer

Closing out of work Trash can shall be provided for garbage, trash and unwanted
materials. Trash shall remove from waste bin on a daily basis.
Discarded unnecessary things.
Poor Housekeeping Keep tidy and clean area daily.
Use dump truck to transport debris material to Saudi Aramco
designated dumpsite...
Activity:
Date:
ATTENDANCE SHEET

I DO HEREBY DECLARE THAT THE JOB SAFETY ANALYSIS WAS EXPLAINED TO ME AND I FULLY UNDERSTAND.

SN. NAME BADGE NO. POSITION SIGNATURE


1

10

11

12

13

14
15

Document: - Job Safety Analysis. Page 6 of 7