JOB SAFETY ANALYSIS MAMMALIAN FACILITY PHASE-2 , LUPIN LTD, PUNE LUPIN Project Name : MAMMALIAN FACILITY PHASE 2 Date: Job Title: Water proofing work (Project Site) JSANo, Prepared by Revision : 00 S| WORKACTVITIES | HAZARDS RISK CONTROL MEASURES Beeiional No. Suggestion if required T_ | Manpower Tack of work knowledge, | Personal Injury © ently the Rarards bore tating the mobilization into work workarea + Only trained workers shouldbe alowed onsite Tool box talk & safe work procedure should be explained to workers + Trained fst alder should be avalabe at ‘Work shouldbe carried under continues supervision 1 Proper PPE's (Helmet, safety shoes, reflective jackets, hand-gloves, tobe provided ‘Safety officer shall ensure only medically ‘it and inducted workers chal be allowed towork JOB SAFETY ANALYSIS MAMMALIAN FACILITY PHASE-2 , LUPIN LTD, PUNE LUPIN Material shifting | Mishandling-falof | Physical injury “Supenizor/engineer shall ensure the /Handlingby person on same level, Fall material shal be shifted safely on ‘manually/wheal | of material while shifting wheel borrow. barrow Supervisor/engineer shall ensure shifted materials are stacked properly ina safe manner. ‘Worker mustbe use nose mask and safety glass safety hand gloves during material shifting work. Cleaningby tar [Hand cut hezardsand | Physical injury Supervisor/engineer shall ensure brush and grinder machine clectrcal hazards. person using grinder must have Inspected and mandatory PPE's Shall bets Access and ogress must be clear/free from obstruction before start the work Worker mustbe use nove maskand safety glass safety hand gloves during ‘leaning work, Wining of water Fosroe X4211C chemical cement land sand and applying. Cat injury, person may fallwhile applying waterproofing chemical incorrectly, electrical Insznrds, Inhalation and Eye irrigate Physical injury material damaged, ‘Supervisor/engineer shall ensure person mising of Fosroc X421IC and ‘cement sand and water is using dust maskand Rubber/PVC hand gloves other than mandatory PPE's Supervisor/engineer shall ensure proper housekeeping before and after ‘completion of ob on each day Electrician shall be ensuring mixing machine shal be inspected. Supervision shall ensuring during JOB SAFETY ANALYSIS | MAMMALIAN FACILITY PHASE-2 , LUPIN LTD, PUNE LUPIN The applying of Fosros NADAC chemical person must have use safety Goggle and nore mask Supervisor and safety officer shall be {ensuring secondary contentment shal ‘be presentduring the mixing work. Tate of emergency ‘Confusion & Fear will be created in workers Personal injury ‘Assembly points should beocatedat site Emergency contact number shall be displayed at site Briofing shall be given at the time of induction & at regular intervals Emergency vehicle shouldbe ready at ‘rained first sidershould be avaiable atsite JOB SAFETY ANALYSIS | MAMMALIAN FACILITY PHASE-2 , LUPIN LTD, PUNE Lorin ShINo_] Spelc Recommended SafeJob Procedures] Name ofResponala | Designation Tanatue Pana 7] Work Pernt | Tool oxtail Tor work 3 [ FPs Ensure and Ares Bascading Prepared by Reviewed and approved by Prepared by Reviewed by Reviewed by Approved by

You might also like