Jsa Erection of Steel Structure (1)

You might also like

Download as pdf
Download as pdf
You are on page 1of 9
x Ln KIMANIS POWER PROJECT JOB SAFETY ANALYSIS 4 “hak Jb Oeseton Traci et Sl Sr ary anes) ‘specie he Texan ter Ce oT ae Ep at — rome Ses poe rer re ae a Fe a evens re ‘iar rnp ; i re comp Laid Soraure | Won. aie | | Company are ‘Sratwe | 1GNo. ate Ta an Tr eT am RE ve | noes So arene 8) em — tee serene Ea wos aoa rope mys 3 at tee =o ae ONO Se ihe * S Seer mtomer ches Age's nee rene pon a senor Ett orn "aca —a Secttcwnes Sica vw Sct aowaanorwenineesem | FER Pe Sarwan Senna aia! He naz suo a ee otra ed fara reseampsaee oes Page 1 of 9 o x \ KIMANIS POWER PROJECT $ Spite om JOB SAFETY ANALYSIS — “ani Jb sseroton Ecton eS Sut ary anaes) ance ie: 750 aps wa ‘specie he BASIC JOR STEP POTENTIAL HAZARDS Whoorwhat mont | Rk conrnaus “eon enaimed | stn Party {ersontegu Er) “a Tarapraon of TINsTorTeed/cotdon ripe | Pesovequpment | L| 1.17 sue vals venioe ang cence Sopenisor rmneraltoste 1.12 Observe rope ate cool ara speectnt 1.13 Equpmentoemateal toute propery 114 Waning sons sat be reid 8 means of ‘ating where spa 12 Insecueinsrumertonvenicle | PesorEcuimment | © 424 prope secure te ccupmentandinatena | SUPE 122 erawe ge patton ete equpmentane mates poet sean he vec 123 Nepersonatewed io stpreerten te backer tueciony Page? of 9 az\ KIMANIS POWER PROJECT JOB SAFETY ANALYSIS “aki Jb eteroton Eaton oil Sit (Gay vO) Fanceral ee ZV Shy ‘specie ee L Basic Joe sre POTENTIAL HAZARDS Who or what mig | Rick ‘conrnots Aston ‘eohaimed 9 | Rating Pay (Personal Ere, Tecaargwa carga | ETHSRTTTARATORST- "Fes w) | (77 Toba Bg ma steal 213. Case spent 0y Wi Superiae 2.14 Maia goo rustkeophg 215 Worcasted PPE oe wor 22F ating oad ae yy [221 Tooboxtretng crop ect anauing | supertcr eoeieanese 222 se ogine suing ing ts ‘aing ape) 223 powseserairan 22s Prowtesgrages 225. Ony compat operate ae alonedta pea ‘commencing ne won 227 alling ea wilte space belo use 228 scale me worangaeate ensures sas Pont ar ge ee i oe 294 Teoboxtreng- Pehl 232 Usa Proper PE (rane give org steer ck) 283 Propernancingmotce 30 Pepatng te tundaton | 3.1 Preh Pont sar ees Persen 2314 Teaboxtitng nen pot ‘rd mate atespecve ™ | 312 Lang reper PPE mand govelong sleeve | Seer Page 3 of o x \ KIMANIS POWER PROJECT Spee om JOB SAFETY ANALYSIS — “aki Jb eteroton Eaton oil Sit (Gay vO) Fanceral ee ZV Shy ‘specie ee L Basic Joe sre POTENTIAL HAZARDS Who or what mig | Rick ‘conrnots Aston (Persoegups ere) |"? ea Trsalaion pare oo 92Meval Honaing oreo | 532 neue proper nanang ontolsbtore Supers fering re ob 2322 Tae he were covet ay 19 IM mater 2328 nave a womar flew ie cate pocsdte S28 Post signapes sa way io ncreaseanareness 461 Pien Plot sharp eee Peron ” supers 4:4 Toobox tegen pat Pepe an 112 Lng Peper PPE an vel ing seen eet) 42 Snap one Pavon » Sepenisoe 4.24 vital ape potetor 422 Proper PPE Wie wom 425 Putwamnhgshnages 1124 Bariage i prouson sas Page 40f9 ag KIMANIS POWER PROJECT ter JOB SAFETY ANALYSIS — Teak! Jb Deseoton Eon oS Shae (Goa SENET) Fanceral ee ZV Shy ‘specie ee L Basic Joe sre POTENTIAL HAZARDS Who or what mig | Rick ‘conrnots Aston ‘eohaimed 9 | Rating Pay (Parsontqul Ere Sinton fsx! 51 Foing oa Peron iy [S21 Teoboxtteng arp otet antiing eee Shete 522, usetogireauing ing = 523, poude sgsinan| S24 Prone agragee 525 _Ony compet opeatorare alowed o erate ‘te cne 520 Grae ncona est be gore bette commence on 4527 lifting ear te repaces bless 528 isc reworking seats ensrepubls sate 52. Phen Poe sap edge Peron Sepaniece wy [523 Posing arg Senge 522, Tooboxtetng - Poh pi 523. Ung Pope PPE (Rand oven seve siete S9Manual Hanaing Peron wy [884 Teobox ofing Soper 532 _Propermanl nanairg mts 33 ave soon oy Werk Supercr, 534 aii good housskeepg Page $0f9 ag KIMANIS POWER PROJECT ter JOB SAFETY ANALYSIS: — “oto Benen Een lS Gay es aE Fate aes SRV Kanp8 eh? ‘sete wee | Basic 108 STEP POTENTIAL HAZAROS Who or what mig | Rick covrmots, Aston ‘corarme | Rating Pay (Parsontqul Ere | ESE Wa ERTPPE Baw 54 Waring atheist eae 543 wear bay namess 542 Core supentcon by super 583. Provide stabe wating patorm {60 Bot greong soe 67 wong at net a weather 624 _Tooboxtretng -voseng atneghe ‘rer wae Peron 22 iapetsaeyhanane oot ure Sepenieoe M [623 Enmre wore ee using cone os 624 Tofesipersson ron pest 628 Usseryitioognenine bot 626 Provse sate ertng sate 827 Soptewen 28 Ounggerttyertend 626. Traning ofprsona, 62 Pn Pot sha ees ie Supenisce 625 Posing Wamig Signage 622 Toot neg Per pot 125 Lang Peper PPE ana gvel ing sect seat) 69 Menval Honalng esen 6.1.4 Teobox oieg Page 60f9 az\ KIMANIS POWER PROJECT JOB SAFETY ANALYSIS “aki Jb eteroton Eaton oil Sit (Gay vO) Basic Joe sre POTENTIAL HAZARDS Fanceral ee ZV Shy ‘specie ee Who or what mig | Rick ‘eohaimed 9 | Rating {Personfeql Em) conrmous Aston Pay ‘IE Faper marl manag mcs 1613 Gare sopersion 9 Wk Superdcr 114 ain good nusskeeng 618 Worcases PPE oe wor ‘Sopeniece ro Heuseteepng 74 Manual nang 72 eno shay edge 14 Toobox beng 12. Proper mal naneirg ethos 13. Cave sopenton oy Wek Superscr. 114 Maina goo rousekeeoha TA) Worcrasted PPE tobe wor 125 Posing Wag Signage 1722 Taobox tng Pn poet 7723 Us Peper PPE Mand ove ong seeve pe) superisce Sopanisce Page 7 of 9 ax \ KIMANIS POWER PROJECT JOB SAFETY ANALYSIS “aki Jb eteroton Eaton oil Sit (Gay vO) Functor ae Zvi ene ‘specie ee L Basic Joe sre POTENTIAL HAZARDS Who or what mig | Rick ‘conrnots Aston ‘eohaimed 9 | Rating Pay (Parsontqul Ere 73 Sippey sutces Peron 6.14 Toobox beng spencer 1612 Weeraperaprate PPE ne GENERAL NOTES Page 8 of 9 Basic PPE (Safety Helmet @ Hard Hat, Safety Shoes, Safety Glass and Long Sleeve Jacket) shall be worn at all te time ‘Sot up barrcadoe around work area ana dsplay warning sign. {All equipment / machinery to be inspected by CTCT before any work commences. {ll PTW and supporting permits must be vaié before any works begin. (On hearing of emergency siren, stop all works, machinery & source of ignition and walk on foot tothe nearest muster point. Vehicle to ext immediataly to designated parking area after diver of material No ating and resting on site, Uso designated cating and resting ares. All pressure gauges ueed must be caliorated and tagged with vali calbration sticker Al scaffolding must have a gracn "safe to uso" tag beforo put into sorvce o Xx \ KIMANIS POWER PROJECT Spee ™ JOB SAFETY ANALYSIS “ax Jb sseoton Ecton eS Ste Gary anaes) ance ie: 750 aps wa ‘specie he ‘+ Msintain good housekeeping dally at all the work places + Tool box talk specie on work instruction and brafing on hazards and control measures tobe concicted before start of work. Page 9 of 9

You might also like