Download as pdf
Download as pdf
You are on page 1of 2
= Construction Supervision Consultancy fr improvement and up gradotion of roads under ASRIP DOH WA [XE Teva) torr teoer ote samirathar, Near GolaghatatyaVdlaye, Ot. Golghat, Assam 785621 ENGINEERING CO.,LTD, Email: assamasrip@dohwa.co.kr, Mobile: +91-700276754 TUASRIP/CONTIRI 7/2022/48 jal To The Authorised Representative ‘S&P-SHIVA (JV) Parmeshwari Buildindg 1* Floor Chatribari, Guwahati-781001 Project: Construction Supervision consultancy Services for Improvement and Up-gradation of Roads under ASRIP Sivasagar to Chumoni, (Package No. ASRIP/A/RI-7) ‘Sub: Review of Works Methodology. Ref: PM/S&P SHIVA/JV/ASRIPIRI-07/2022/018 dated 05.07.2022 Dear Sir, ‘The Work methodology (method statement) submitted by the Contractor was reviewed by us and our comments are as follows: 1. The formats and method statements for the items from survey work, sub base to hot weather concrete are found in order and the same may be adopted during construction. 2. The execution of each item of work shall be carried out as per the details and sequencing narrated in the Methods statement and as per the provisions of the QAP and the Contract Agreement. 3: The line and level of finishes in each and every items shall be checked as per the provision of the CI.902.3 and tolerances shall be within the limits specified in Cl. 900.1 of the MoRTH Specification -revision. You are also requested to submit the work method statements for the remaining items such as Traffic signs and km stones of the work for our observations and comments. Please also note that our observations and comments does not relieve you of any of your obligations as per the Concession Agreement and the sole responsibility for soundness and correctness of the design, drawings and finished items is that to be maintained by you all the times during our inspection. Thanking you, For Dohwa MaRS (JV) Soe V.R. Ramanathan ‘8 1°? 2027- Team Leader cum Senior Highway Engineer. CSC, ASRIP Ee Corporate office Dotiwa India Branch Office ‘A101, 1-Thum Tower, Sector 62,Noida, Uttar Pradesh — 201301, Email abhilash@dohwa.co kr { Construction Supervision Consultancy for improvement and up gradation of roads under ASRIP / DOHWA [METRE Sec otincearantne certo co ENGINEERING CO., LT. Email: assamasrip@dohwa.co.kr, Mobile: #91-700276754 Copy to: 4, The chief Engineer (EAP) Fatasil Ambari Guwahati - 25 for information please. 2. Resident Engineer Nazira, for necessary action. eae clin tone 1@\o?)2 022 CYR. Bamana TREND Leen ee UU UEEUEEEEE EEE Corporate Office: DDohwa India Branch Office ‘A101, Thum Tower, Sector 62,Nolda, Uttar Pradesh 201301 Email bhilashi@dohwa,co.ke

You might also like