Review of BBS of RCC Box

You might also like

Download as pdf
Download as pdf
You are on page 1of 2
se hac ee ae ees ae ieee ENGINEERING CO., LID. Email: assamastip@dohwa.co.kr, Mobile: #91-700276754 TUASRIP/CONTIRI- 5/2022/70 Date 21.07.2022 To Authorized Signatory, ‘SGCCL-ANPL (JV) 4" Floor, Amaze Tower, A.T Road, Beat No-14, Paltan Bazar, Guwahati-781001 Project: Construction Supervision Consultancy Services for Improvement and Up gradation of Roads under ASRIP (Moran Naharkatia road (Moran to Deesang Kinar Bangali) under ASRIP/A/RI- 5) ‘Sub: Review of BBS of RCC Box Culvert Ref.: your letter No. ANPLIAM/MNRD/2022-23/26 dated 06-07-2022 Dear Sir, Reference is made to your letter regarding review of BBS (Bar bending Schedule) for RCC Box culvert and Retaining wall from km 0+000 to 14#000 for the above said project. In this regard, the comments of Resident Engineer, Moran is attached herewith for your compliance With Regards ~— See V.R. Ramanathan !*°2 ‘Team Leader cum Senior Highway Engineer Dohwa MaRS (JV) CSC, ASRIP Guwahati, Assam Copy to: - 4. The Chief Engin information please. 2. The Resident Engineer, Moran — for necessary action r, (EAP) PWRD Assam, Fatasil Ambari, Guwahati- 25 — for kind Ge Corporate office Dohwa ingia Branch Office ‘4.101, i-Thum Tower, Sector 62,Noid, Uttar Pradesh — 201301 Email :abhilash@dohwa co ke INTER OFFICE CORRESPONDENCE [inter/RE/Moran/2022/01 | Date: 08.07.2022 TO From "Team Leader, Guwahati | Resident Engineer, Moran ‘Sub: Submission of Bar Bending Schedule of RCC Box Culverts & RCC Retaining Wall Ref. Contractor Letter No: SGCCL-ANPL/AMIMNRD/2022-23/26 Dated 06.07.2022 Dear Sir, Copy of Bar Bending Schedule of RCC Box Culverts & RCC Retaining Wall submitted by the Contractor Vide above referred letter to this office has been reviewed and observed the follows:- a) Drawing shall be submitted on A-3 size paper with colour print, BBS of A-4 size paper. b) Without Prior approval of P&P i.e. Goods for Construction Drawing BBS Detail may not be finalized exactly. Because FRL of structure to be finalized accordingly. c) General arrangement of Drawing is not submitted as per DPR Drawing. d) Details of dimension (i.e. length, width and height is not shown in plan. e) Section of Box culvert, Return wall, curtain wall and crash barrier is not shown in Drawing. f) Details of level i.e. founding level, Invert level, U/s and Dis for not been shown in GAD. In addition to Tabular Column, FRL, Founding level, Invert level to be also shown in GAD. g) Details of curtain wall and Shear key plan of bottom slab is not shown in drawing, h) Chainage of particular drawing shall be mentioned at the bottom in column at each drawing, As mentioned in attached DPR drawing. In view of above, Contractor is requested for resubmission this drawing with the above mentioned details and as per DPR Drawing enclosed her with. With Regards ye ‘Sunil Kumar Singh oe Resident Engineer ee For Dohwa MaRS (JV) got Y or Moran SP ie ca 1 Sa - ot ‘| ot 2 es e ee ae

You might also like