Case Study: Cargo Tunnel

Refurbishment
Client: Heathrow Airport Limited (HAL)
• Limited remote system monitoring facility
• Presence of toxic substances including Asbestos
Context
Situated in the heart of Heathrow Airport, the cargo Atkins Solutions and Added Value
tunnel is the primary route that connects the Central Atkins was commissioned by HAL to review the scope
Terminal Area (CTA) and the cargo facility. It was requirements. Working alongside with the client’s
constructed in the 1960s. The tunnel is not open to multidisciplinary team, Atkins undertook Information
the public; it is used only by vehicles with security and Communications Technology (ICT) system design.
clearance for cargo movements, and transfer of
Through collaboration and value engineering, Atkins
passengers to and from Terminal 4 (T4).
was able to provide a design solution that aligns with
the current national tunnel standard requirements,
maximise flexibility for future changes whilst at the
same time enhances remote system monitoring facility.
Notwithstanding this a number of software tools has
been utilised as part of the design to minimise H&S
hazards and journey visits for site inspections and
survey activities.
• Decentralised network design approach – relocating
the access network layer closer to the IT end device
locations
- Replacement of traditional copper cable
connections with high bandwidth
condensed fibre cable connections
- Improved IT device placement by
reducing the maximum channel length
requirements
- Remove the need to use of media
convertors as ways of extending the
network operational distance
• Introduction of industrial rugged access network
layer solution with resilient configuration
The tunnel received a system upgrade in the mid-
- Facilitates remote monitoring facility for
1990s, however, since then it has received limited
IT end devices
attention. In addition to life-expired infrastructure, the
industry's understanding of tunnel safety has - Enablement of high-capacity Power over
dramatically improved. As such, the tunnel now Ethernet (PoE) Type 3 and Type 4
requires major works to improve its condition in order standard to safeguard current and future
reduce the associated risks and safeguard this key IT requirements
operational link. - Maximises resiliency in relationship to
operational environment, power,
component and connectivity
Client Issues
• The use visualisation software tools to assist with
• Poor working state of condition site surveys and investigations
• Restricted building structure support
• The use of specialised Building Information
• Severally limited in turns of future service Modelling (BIM) software tools to assist with design,
expansions planning and scheduling. Provides real time design
• Unreliable and out of date technologies & alternations, clash detections and design
verifications

Case Study: Cargo Tunnel Refurbishment v0.1 1


Software Tools • Full detailed surveys and investigations of the
• Matterport 3D space capture tool to review existing existing infrastructure
layout to assist with site surveys and site
• Basis of design and detailed system design (RIBA
investigations
stage 3 scheme and RIBA stage 4 production
• Can be played back at number of times at the working collaboratively with MACE as
comfort in an office or home location. Minimise Development
journey visits Integrator [DI]) – BIM and AutoCAD compliant GA’s
• Provide safe access to restricted (e.g. Asbestos • Full IT implementation including handover and
contaminated)/space-confined areas asset integration (planned)

Design Involved
• Communications room design
• Electrical Distribution Point (EDP) and Emergency
Panel (EP) design
• Structured cabling design (backbone
fibre/distribution and horizontal copper)
• Containment design
• Access network layer design
• End devices integration

• AutoCAD Revit and Navisworks 3D design and


review software tools to design buildings and
infrastructures, to combine 3D models; navigate
around them in real-time
• Provides real time design & alternations, clash
detections and design verifications

Systems Involved
• Access control
• Automatic Number Plate Recognition (ANPR)
Closed Circuit Television (CCTV) surveillance
• Telephony (analogue and IP-based)
• Radio cellular and Private Mobile Radio (PMR)
• 3rd party system including Automatic Incident
Detection (AID), lighting, Public Address and Voice
Alarm Systems (PAVA) and P-Ducker System

Key Benefits and Success Factors


The client is able to operate a more efficient and cost-
effective tunnel facility that maximises on flexibility and
expandability, reduces Operating Expense (OPEX)
whist meeting current national tunnel standard
requirements.

Services Provided Contract Data


• Scope/requirements gathering from multiple Contract value: £2.5m (design) £10.0m (planned)
stakeholders Duration: 1 year (design) 3 years (planned)
• Completion date: 2023 (estimated)
• Contact (GTC INDIA) :P. Ansari@atkinsglobal.com