BMG Q.C.

/ Flatness Report for Door-1

Project : Falcon 5/F-15QA Beddown Report Date: 08-August 2022


Employer : M/s United States Army Corps of Engineers (USACE)
Contractor : M/s BAH-ICM JV
Sub-Contractor : M/s AL DANA
Report No: QC-FL-001

GRIDS 0 1 2 3 4 5 6 7

A 0.0 0.0 0.5 0.5 0.5 0.0 0.0 1.0

B 1.0 1.0 1.0 1.0 1.0 1.0 1.5 1.5

C 1.0 1.0 1.0 1.0 1.0 1.0 1.5 2.0

D 0.0 1.5 1.0 1.0 1.0 1.0 1.0 1.0

E 0.0 0.5 1.0 1.0 1.0 0.0 0.0 0.0

Front Panel Flatness

2.0

1.5

1.0
E
0.5
D
0.0
C
0
1
2 B
3
4
5
6 A
7

Mean F Value
0.775mm
Observed

Allowable
6.0mm
Maximum F Value

Maximum F Value
2.0 mm
Observed

Remarks ACCEPTED

QC Inspector:
Name SURYA DEV

Signature