NEST,
a Lonestar Technical Services «ic,
(Engineering, Inspection, Testing & Lab Services)
P.O. Box: 8617, Bulding # DY34 Tel: +971 4 324 3888/Fax: +971 4 328 2682
Inside Dubai Ship Docking Yard Email: Testing@Lonestar-.ab.com
‘Al Jadaf, Dubal - United Arab Emirates Website: wiww.Lonestar-Lab.com
MAGNETIC PARTICLE INSPECTION REPORT
Examination Dato|30-09-2022 | Issue Date| 01-10-2022 Job #| 110925 [Report #] _NRI7544 [Raval 0
at Client] 8 MG METAL FALSE CEILINGS MANUFACTURING LLC
Project -
Job Location Dic
“Job Description) MPI on Structural Jon
Procedure No| NOT-SOP-017-10 Standard Method | AWS 01.1 ED.2020,
~ Weld ib] a I ‘Welder 1D | - -
Weld Type| FW = face Condition As Cleaned
Material CS Thickness | Given Below
Heat Treatment |NA
Light intensity | 3180 Lux
neler Length [Glen Below
Light Meter|Lux Meter
Test Temperature 34°C ee anaes
Technique Viet Continuous Rcomiaa weed reer
Current Type /Ampere 220VAC ~ Magnetizing Method | Longitudinal
Magnetic Field Indicator 8C Strip | Aeceptance Criteria | AWS D1.1 £0.2020
o-magnetization -
Equipment Assot # LTS 1383. = Equipment Type |AC Yoke Sec
CleanoriRemover Background — Detecting Media :
\te Type wor 712 lye St
Batch No. - Batch No. 232320514 Batch No. 232296690
RECORDING AND EVALUATION
MPI was was carried out on Structrual Frame Joints,
Detailing hooks,
11 Sets of door
No relevant indication was observed during testing,
Found acceptable as per specification,
Technicl Contractor Representative Client / Client Representative
sTuivacife
Level {i 1
Signaturh®, Signature Signature
NOT-FRIM-039-04-Magnetic Particle Testing Report Page 1 of 1
Bisirbution: White: Invoice, Pink: Client, Blue: Job File, Green: Records (Do not tear)
THIS DOCUMENT SHALL NOT BE REPRODUCED IN PART OR FULL WITHOUT THE WRITTEN PERMISSION OF