Download as pdf
Download as pdf
You are on page 1of 1
NEST, a Lonestar Technical Services «ic, (Engineering, Inspection, Testing & Lab Services) P.O. Box: 8617, Bulding # DY34 Tel: +971 4 324 3888/Fax: +971 4 328 2682 Inside Dubai Ship Docking Yard Email: Testing@Lonestar-.ab.com ‘Al Jadaf, Dubal - United Arab Emirates Website: wiww.Lonestar-Lab.com MAGNETIC PARTICLE INSPECTION REPORT Examination Dato|30-09-2022 | Issue Date| 01-10-2022 Job #| 110925 [Report #] _NRI7544 [Raval 0 at Client] 8 MG METAL FALSE CEILINGS MANUFACTURING LLC Project - Job Location Dic “Job Description) MPI on Structural Jon Procedure No| NOT-SOP-017-10 Standard Method | AWS 01.1 ED.2020, ~ Weld ib] a I ‘Welder 1D | - - Weld Type| FW = face Condition As Cleaned Material CS Thickness | Given Below Heat Treatment |NA Light intensity | 3180 Lux neler Length [Glen Below Light Meter|Lux Meter Test Temperature 34°C ee anaes Technique Viet Continuous Rcomiaa weed reer Current Type /Ampere 220VAC ~ Magnetizing Method | Longitudinal Magnetic Field Indicator 8C Strip | Aeceptance Criteria | AWS D1.1 £0.2020 o-magnetization - Equipment Assot # LTS 1383. = Equipment Type |AC Yoke Sec CleanoriRemover Background — Detecting Media : \te Type wor 712 lye St Batch No. - Batch No. 232320514 Batch No. 232296690 RECORDING AND EVALUATION MPI was was carried out on Structrual Frame Joints, Detailing hooks, 11 Sets of door No relevant indication was observed during testing, Found acceptable as per specification, Technicl Contractor Representative Client / Client Representative sTuivacife Level {i 1 Signaturh®, Signature Signature NOT-FRIM-039-04-Magnetic Particle Testing Report Page 1 of 1 Bisirbution: White: Invoice, Pink: Client, Blue: Job File, Green: Records (Do not tear) THIS DOCUMENT SHALL NOT BE REPRODUCED IN PART OR FULL WITHOUT THE WRITTEN PERMISSION OF

You might also like