MI 15_Bus Bay

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

45 15.

00 45
C
Passenger shelter
Bus stop sign Detail-B Foot path
30.00
Y D
BUS STOP

1.50
Y Ghost island

1.50
Ghost island
BUS STOP

C 30.00

3.50
LAYOUT OF BUS STOP ON MAIN CARRIAGEWAY Foot path
Bus stop sign
Passenger shelter
D
45 15.00 45

Main Carriageway
Proposed Center Line

1.50
D:\F\DETAIL DESIGN\03_DD\2023_PARBHANI\SUBMISSION\MISCELLANEO\MI 15_BUS BAY.DWG

Ghost island Passenger Shelter 3.50 1.50 CW


Bus bay Ghost island
(PAVED SHOULDER)
BUS STOP
3.50

Foot path 1
2

Passenger shelter PQC 280 mm

D
DLC 150 mm
GSB 150 mm

15.00
Subgrade
Notes:
1. All the dimensions are in meters unless otherwise specified.
2. Refer Shelter Drawings for details of Bus Shelter.

CLIENT : PROJECT : EPC : PROOF CONST: SAFETY CONSULTANT: TITLE:


SARASWATI CONSTRUCTION CO. SID Consultants SPHERE INFRATECH DRG. NO.PARBHANI/RD/MISC/ BUS BAY
GOVERNMENT OF INDIA 508, synergy tower, nr. vodafone house, CONSULTANCY PVT.LTD. TYPICAL LAYOUT OF
CONSTRUCTION OF NEW FOUR LANE BYPASS TO PARBHANI CITY (PARWA TO Plot No. 36, Ward 3-A, Tagore Road, b/h ymca club,corporate road, 35 - Sukhshine Complex
MINISTRY OF ROAD TRANSPORT structurally BUS BAY DATE : REVISION:
ASOLA) KM 463/265 TO KM 481/180 (DESIGN CH. 19+220 TO CH. 34+434) SECTION OF Adipur, Kutchh. integrated
design
prahladnagar, Ahmedabad-380015 8 - Sunrise Park
16/7/24 FOR SUBMISSION www.sidconsultants.in Ahmedabad, Gujarat
R0 B.K.P I.C G.M.S
& HIGHWAYS PUBLIC WORKS NH-61 ON EPC MODE IN THE STATE OF MAHARASHTRA DESIGNED DRAWN CHECKED APPROVED
REV
DESIGNED DEPARTMENT MAHARASHTRA
AUTHORITY ENGINEER : DESIGN CONSULTANT : GMS DESIGN AND ENGINEERING SERVICES LLP. SCALE : NTS
NO.
DATE DESCRIPTION &
CHECKED
DRAWN APPROVED
G-Eng Advisory Services Pvt Ltd A/10, Madhuram Appartment, krishna baug, B.K.P I.C B.K.P G.M.S
Emerald Estate Sector 65 Gurgaon B/h. Maninagar Fire Station, Maninagar, Ahmedabad-380008
Bridge Towards Solutions
D:\F\DETAIL DESIGN\03_DD\2023_PARBHANI\SUBMISSION\MISCELLANEO\MI 15_BUS BAY.DWG

Notes:
1. All the dimensions are in meters unless otherwise specified.
2. Refer Shelter Drawings for details of Bus Shelter.

CLIENT : PROJECT : EPC : PROOF CONST: SAFETY CONSULTANT: TITLE:


SARASWATI CONSTRUCTION CO. SID Consultants SPHERE INFRATECH DRG. NO.PARBHANI/RD/MISC/ BUS SHELTER
GOVERNMENT OF INDIA 508, synergy tower, nr. vodafone house, CONSULTANCY PVT.LTD. TYPICAL LAYOUT OF
CONSTRUCTION OF NEW FOUR LANE BYPASS TO PARBHANI CITY (PARWA TO Plot No. 36, Ward 3-A, Tagore Road, b/h ymca club,corporate road, 35 - Sukhshine Complex
MINISTRY OF ROAD TRANSPORT structurally BUS BAY DATE : REVISION:
ASOLA) KM 463/265 TO KM 481/180 (DESIGN CH. 19+220 TO CH. 34+434) SECTION OF Adipur, Kutchh. integrated
design
prahladnagar, Ahmedabad-380015 8 - Sunrise Park
16/7/24 FOR SUBMISSION www.sidconsultants.in Ahmedabad, Gujarat
R0 B.K.P I.C G.M.S
& HIGHWAYS PUBLIC WORKS NH-61 ON EPC MODE IN THE STATE OF MAHARASHTRA DESIGNED DRAWN CHECKED APPROVED
REV DESIGNED DEPARTMENT MAHARASHTRA
AUTHORITY ENGINEER : DESIGN CONSULTANT : GMS DESIGN AND ENGINEERING SERVICES LLP. SCALE : NTS
NO.
DATE DESCRIPTION &
CHECKED
DRAWN APPROVED
G-Eng Advisory Services Pvt Ltd A/10, Madhuram Appartment, krishna baug, B.K.P I.C B.K.P G.M.S
Emerald Estate Sector 65 Gurgaon B/h. Maninagar Fire Station, Maninagar, Ahmedabad-380008
Bridge Towards Solutions

You might also like