After completing the erection of scaffolding, what is the next step before allowing workers to access it?

Performing a load test


Installing guardrails and toe boards
Applying a coat of paint
Inspecting for defects

Which of the following is NOT a common method for applying plaster on CHB walls?
Hand troweling
Spray application
Roller application
Parging

What is the primary function of cross braces in scaffolding?


To provide additional support to the scaffold structure
To connect horizontal ledgers
To support platform planks
To enhance the stability of the scaffold structure

During CHB laying, what is the function of mortar joints?


Enhancing structural stability
Providing insulation
Improving aesthetics
Bonding CHBs together

What safety measure should be taken when fabricating formwork on scaffoldings?


Overloading the scaffoldings
Ignoring the condition of the scaffoldings
Ensuring the scaffoldings are properly erected and stable
Using damaged scaffold components

What is the correct sequence of steps in plastering CHB walls?


Scratch coat, float coat, finish coat
Finish coat, scratch coat, float coat
Float coat, finish coat, scratch coat
Float coat, scratch coat, finish coat

In the process of scaffolding installation, what is the correct sequence of steps involving H-frames, X-
braces, base jacks, and U-heads?
Install H-frames, adjust with base jacks, add X-braces for stability, attach U-heads for supporting beams
Add X-braces for stability, install H-frames, adjust with base jacks, attach U-heads for supporting beams
Install H-frames, add X-braces for stability, attach U-heads for supporting beams, adjust with base jacks
Adjust with base jacks, install H-frames, add X-braces for stability, attach U-heads for supporting beams

Which is the proper sequence in column formwork erection?


1. Line, Level and Vertically Checking
2. Layout marking and layout Checking.
3. Panel positioning
1,2,3
2,1,3
2,3,1
None of these

What is the purpose of scaffolding for beams?


Supporting workers during beam construction
Enhancing the aesthetic appearance of beams
Providing access for painting beams
Protecting beams from environmental damage

Forms or formworks should be strong enough to withstand a specific type of load only.

True

False

What is the purpose of toe boards in scaffolding?


To provide stability
To prevent tools from falling
To support workers
To enhance aesthetics

What is the primary purpose of formwork for slabs?


To support workers during slab construction
To shape and contain concrete until it sets
To provide insulation to the slabs
To add decorative elements to the slabs

What is the purpose of propping in formwork installation?


To provide vertical support to the formwork
To prevent lateral movement of the formwork
To connect horizontal ledgers
To hold scaffold tubes for supporting beams or slabs

During CHB laying, what is the purpose of the level line?


To ensure uniform height of CHBs
To mark the position of windows and doors
To guide the alignment of CHBs
To indicate the thickness of mortar joints

Which is the proper sequence in beam formwork installation?


1. Construct, install beam soffit.
2. Erect side walls
3. Fix walers/ runners/ stringers and braces.
1,2,3
2,1,3
2,3,1
None of these

What is the purpose of raking out joints during CHB installation?


To remove excess mortar
To create a decorative pattern
To increase the bond between CHBs
To enhance thermal insulation

In formwork construction for columns, what is the function of column clamps?


To provide additional support to columns
To connect formwork panels together
To enhance the curing process
To improve surface finish

During CHB laying, what is the purpose of the line and pins?
To ensure uniform height of CHBs
To mark the position of windows and doors
To guide the alignment of CHBs
To indicate the thickness of mortar joints

Formworks are temporary structures that supports its own weight, plus the freshly placed concrete, plus
construction live loads. TRUE

Formwork material should not warp or get distorted. TRUE

What is the purpose of form ties in formwork for beams?


To provide stability to the beams
To hold formwork panels together
To enhance the aesthetic appeal of beams
To prevent concrete leakage

What is the purpose of diagonal braces in scaffolding?


To provide additional support to the scaffold structure
To connect horizontal ledgers
To support platform planks
To enhance the stability of the scaffold structure

Which of the following is a common method for securing scaffold planks to scaffold frames?
Welding
Nailing
Tying with ropes
Using scaffold couplers or clamps
What is the primary advantage of using U-heads in scaffolding for supporting beams or slabs?
To provide additional stability to the scaffold structure
To prevent lateral movement of the scaffold
To easily adjust the height of beams or slabs
To connect horizontal ledgers

What safety precaution should be taken when erecting scaffolding on uneven ground?
Using damaged scaffold components
Overloading the scaffolding
Ensuring a level base
Ignoring weather conditions

Which is the proper sequence for slab formwork installation.


1. Fixing the sheeting
2. Erecting bearers and joists
3. Determine the bearer spacing.
1,2,3
2,1,3
3,2,1
None of these

What is the purpose of soaking CHBs in water before installation?


To increase their strength
To prevent efflorescence
To improve their adhesion to mortar
To reduce their absorption of moisture from the mortar

What is the standard procedure before laying CHBs?


Wetting the CHBs
Applying a coat of paint
Cleaning the construction area
Applying a layer of mortar on the foundation

What is the purpose of scaffolding ties?


To connect scaffolding components together
To provide additional support to scaffolding
To improve the stability of scaffolding
To enhance the aesthetic appearance of scaffolding

Which of the following is a safety measure when erecting scaffolding for beams?
Overloading the scaffolding beyond its capacity
Using damaged scaffold components
Providing guardrails and toe boards
Ignoring weather conditions
During CHB installation, what is the purpose of applying mortar to the top surface of the previous
course?
To fill voids between CHBs
To provide additional strength to the wall
To create a level surface for the next course
To improve the bonding between courses

What is the primary function of a scaffolding base plate?


To support vertical standards
To provide stability to the scaffolding
To connect horizontal ledgers
To provide access for workers

Which of the following is a common material for constructing formwork for slabs?
Steel
Aluminum
Timber
PVC