10 Meter Inside Diameter: 4.026 Inches (102.26 Millimeters) [4" Schedule 40 Pipe]
11 Process Conditions Meter Flow Range (per Datasheet)
Flow Parameters
1 of 2 03 November 2013
39 Total Meter Run Length: 125.250 Inches (3,181.35 Millimeters) [includes flanges, pipe, meter and gaskets]
40 Section A 21.000 Inches 533.40 Millimeters
41 Section U 33.000 Inches 838.20 Millimeters
Meter Run Data
2 of 2 03 November 2013
1 Project Title/Reference Paradip BOOT EPC Project
2 Tag 205-FT-B030 to B035
10 Meter Inside Diameter: 4.026 Inches (102.26 Millimeters) [4" Schedule 40 Pipe]
11 Process Conditions Meter Flow Range (per Datasheet)
Flow Parameters
1 of 2 03 November 2013
39 Total Meter Run Length: 125.250 Inches (3,181.35 Millimeters) [includes flanges, pipe, meter and gaskets]
40 Section A 21.000 Inches 533.40 Millimeters
41 Section U 33.000 Inches 838.20 Millimeters
Meter Run Data
2 of 2 03 November 2013
FH 001 K
Project: PARADIP LPG SKIDS - Quote n° 104422 to RONSOR/ EPM
VENDOR: FAURE HERMAN
205-FT-B001 / 205-FT-B002
Operating conditions:
Meter selection:
205-FT-B001
Operating conditions:
Meter selection: