CONDITIONS OF CONTRACT
1 GENERAL
1.3 Project Site
1.3.5(i) Soil investigation and report LS
1.4 Contractor's Site Facilities
1.4.3(i) Mobilization and demobilization of Contractor's site facilities LS
1.4.3(ii) Maintenance of Contractor's site facilities month
1.5 Engineer's Facilities
1.5.13(i) Provision of Engineer's office (type) (nr of units) month
1.5.13(ii) Maintenance of Engineer's office (type) (nr of units) month
1.5.13(iii) Provision of surveying equipment for the Engineer month
1.5.13(iv) Maintenance of surveying equipment for the Engineer month
1.5.13(v) Provision of Engineer's accommodation (type) (nr of units) month
1 GENERAL (continued)
1.7 Control of Traffic and Access
1.7.6(i) Maintenance and protection of traffic month
BILL SUMMARY
Amount
Item No Description
R.O.
SUMMARY
2.2.5 (xii) Removal of sign boards including post and foundations (size) nr.
2.2.5 (xiii) Removal of Floodway marker posts and foundations (size) nr.
Removal of re-usable steel safety barrier including post
2.2.5 (xiv) lin.m.
foundations (dimensions and type)
Removal of reusable concrete safety barrier including foundations
2.2.5 (xv) lin.m.
(dimensions and type)
Removal of re-usable sign board , including posts and foundations
2.2.5 (xvi) nr.
(size)
Removal of reusable Floodway marker posts including foundations
2.2.5 (xvii) nr.
(size)
2.2.5 (xviii) Removal of drainage protection works (type) cu.m.
2.2.5 (xix) Removal of existing fences and gates (description and type ) lin.m.
PROJECT TITLE
Subsection (If necessary)
BILL OF QUANTITIES
BILL (II) EARTHWORKS
2.2.5 (xx) Removal of existing block and masonry walls (Size and Type) cu.m.
2.2.5 (xxi) Removal of ditches (type and size) lin.m.
2.2.5 (xxii) Removal of bridges (dimentions, type and description) nr.
Removal of rocks and boulders larger than 0.2 cu.m. or 500 kg
2.2.5 (xxiii) cu.m.
(description)
2.2.5 (xxiv) Removal of wells and shafts (description and location) nr.
2.2.5 (xxv) Removal of sand dunes (location and description) cu.m.
2.2.5 (xxvi) Removal of light poles including cabling and foundation (size) nr.
2.2.5 (xxvii) Removal of flag poles including foundation nr.
2.2.5 (xxviii) Removal of Debris Deflectors including foundation nr.
2.2.5 (xxix) Removal of Reuse of Debris Deflectors nr.
PROJECT TITLE
Subsection (If necessary)
BILL OF QUANTITIES
BILL (II) EARTHWORKS
2 EARTHWORKS (continued)
2.3 Roadway Excavation
2.3.6 (i) Unclassified excavation cu.m.
2.3.6 (ii) Excavation of unstable material outside Right-of-Way cu.m.
2.3.6 (iii) Unclassified excavation under water cu.m.
2.3.6 (iv) Excavate and stockpile suitable topsoil and recompact as directed cu.m.
BILL SUMMARY
Amount
Item No Description
R.O.
SUMMARY
BILL SUMMARY
Amount
Item No Description
R.O.
SUMMARY
Amount
Item No Description
R.O.
SUMMARY
BILL SUMMARY
Amount
Item No Description
R.O.
SUMMARY
9.4.6 (iii) Sprayed Concrete (Shotcrete) with mesh reinforcement (thickness) sq.m.
9.4.6 (iv) Sprayed Mortar (Gunite) with mesh reinforcement (thickness) sq.m.
Fiber reinforced Sprayed Concrete (Shotcrete)with fiber
9.4.6 (v) sq.m.
reinforcement (thickness)
9.4.6 (vi) Reinforcing mesh sq.m.
9.4.6 (vii) Painting sq.m.
9.5 Rock Grouting
9.5.6 (i) Drillholes for grouting rock (diameter)(length) lin m
9.5.6 (ii) Rock grout cu.m.
9.6 Reinforced Concrete Slope Protection
9.6.6 (i) Reinforced concrete slope protection cu.m.
Page VI-I CARRIED TO SUMMARY
PROJECT TITLE
Subsection (If necessary)
BILL OF QUANTITIES
BILL (VI) INCIDENTAL CONSTRUCTION
Estimated Unit Rate Amount
Item No Description Unit
Quantity R.O. - (In Figures) R.O. - (In Words) R.O.
9.7 Sacked Concrete Revetment
9.7.6 (i) Sacked concrete revetement cu.m.
9.8 Paving Tile Slope Protection
9.8.6 (i) Paving tile slope protection sq.m.
9.9 Ditch Lining
9.9.6 (i) Paving slab protection and ditch lining (type) (thickness) sq.m.
9.9.6 (ii) Grouted stone ditch lining (type) (thickness) sq.m.
9.9.6 (iii) Grouted stone wash checks (type) (thickness) sq.m.
9.10 Filter Layers and Membranes
9.10.6 (i) Granular filter layer (thickness) sq.m.
9.10.6 (ii) Fabric membrane sq.m.
9.10.6(iii) Geotextile membrane sq.m.
9.10.6(iv) Geogrid. sq.m.
9.11 Barriers for Sand Dunes
9.11.6 (i) Fences for dune stabilization (type) (height) lin.m.
9.11.6 (ii) Bituminous stabilization of dunes sq.m.
9.11.6 (iii) Vegetative stabilization of dunes sq.m.
9.11.6 (iv) Dune stabilization with blankets sq.m.
9.12 Mechanically Stabilized Earth Retaining Walls
Mechanically Stabilized Earth Retaining Walls (MSERWs)Specify
9.12.7 (i) sq.m.
height
9.12.7 (ii) Standard Coping on MSERW lin.m.
9.12.7 (iii) Concrete Barrier Parapet on MSERW lin.m.
9.13 Coastal Protection
9.13.6 (i) Underlayer cu.m.
9.13.6 (ii) Quarry run cu.m.
9.13.6 (iii) Rock armour cu.m.
9.13.6 (iv) Dredging cu.m.
9.13.6 (v) Fabrics and Membranes (type) sq.m.
Page VI-III CARRIED TO SUMMARY
PROJECT TITLE
Subsection (If necessary)
BILL OF QUANTITIES
BILL (VI) INCIDENTAL CONSTRUCTION
Estimated Unit Rate Amount
Item No Description Unit
Quantity R.O. - (In Figures) R.O. - (In Words) R.O.
12 SIDEWALKS, PAVED AREAS AND CURBS
12.1 Sidewalks, paved areas and curbs
12.1.7 (i) Precast concrete tile paving (type) sq.m.
12.1.7 (ii) Precast concrete block paving (type) sq.m.
12.1.7 (iii) Natural stone paving (type) sq.m.
12.1.7 (iv) Cast in situ concrete paving (type) (thickness) sq.m.
12.1.7 (v) Precast concrete curb/edging,/channel (type and size) lin.m.
12.1.7 (vi) Cast in situ concrete curb (type) lin.m.
13 SAFETY BARRIERS AND FENCES
13.1 Roadside Barriers
13.1.7 (i) W-Beam G/rail, standard section (type) lin.m.
13.1.7 (ii) W-Beam G/rail, transition section (type) lin.m.
13.1.7 (iii) W-Beam G/rail, terminal (end type) nr.
13.1.7 (iv) W-Beam G/rail posts nr.
13.1.7 (v) Thrie Beam G/rail, standard section (type) lin.m.
13.1.7 (vi) Thrie Beam G/rail, transition section (type) lin.m.
13.1.7 (vii) Thrie Beam G/rail, terminal (end type) nr.
13.1.7 (viii) Thrie Beam G/rail posts nr.
13.1.7 (ix) Concrete Barrier, single face (type) lin.m.
13.1.7 (x) Concrete Barrier, double face (type) lin.m.
13.1.7 (xi) Concrete Barrier, transition section (type) lin.m.
13.1.7 (xii) Impact Attenuator (type) nr.
13.1.7 (xiii) Guardrail Re-installation (type) lin.m.
13.1.7 (xiv) Barrier reflector nr.
13.2 Fences
13.2.7 (i) Chain link fence (type) (height) lin.m.
13.2.7 (ii) Pedestrian/Animal fencing (type) (height) lin.m.
13.2.7 (iii) Wire fence (type) (height) lin.m.
13.2.7 (iv) Sand dune fence (type) lin.m.
13.2.7 (v) Gate (type) sq.m
PROJECT TITLE
Subsection (If necessary)
BILL OF QUANTITIES
BILL (VI) INCIDENTAL CONSTRUCTION
Estimated Unit Rate Amount
Item No Description Unit
Quantity R.O. - (In Figures) R.O. - (In Words) R.O.
Page VI-III CARRIED TO SUMMARY
PROJECT TITLE
Subsection (If necessary)
BILL OF QUANTITIES
BILL (VI) INCIDENTAL CONSTRUCTION
Estimated Unit Rate Amount
Item No Description Unit
Quantity R.O. - (In Figures) R.O. - (In Words) R.O.
14 TRAFFIC SIGNS AND ROAD MARKINGS
14.1 Traffic Signs
14.1.7 (i) Highway sign, triangular, (side - mm) nr.
14.1.7 (ii) Highway sign, circular, (diameter - mm) nr.
14.1.7 (iii) Highway sign, rectangular - size (finished sign area) sq.m.
14.1.7 (iv) Highway sign, octgagonal, (height - mm) nr.
14.1.7 (v) Sign post support assembly including foundation (type) nr.
14.1.7 (vi) Breakaway sign post support assembly including foundation (type) nr.
14.1.7 (xiii) Solar powered illuminated traffic signs (type) (reference drawing) nr.
Amount
Item No Description
R.O.
SUMMARY
Page VI-IV
15.8.15(vi) Pre-shipment testing of Lighting high mast (type, reference batch) (L.S.)
15.8.15 (vii) Pre-shipment testing of Lighting column (type, reference batch) (L.S.)
15.18.6 (xiii) Cable route/ Cable joints marker (reference Drawing and detail) nr.
BILL SUMMARY
Amount
Item No Description
R.O.
SUMMARY
BILL SUMMARY
Amount
Item No Description
R.O.
SUMMARY
17.4.9 (iii) High Pressure Booster Pumping Set Employing Membrane Tank nr.
BILL SUMMARY
Amount
Item No Description
R.O.
SUMMARY
DAYWORK SCHEDULE
1 GENERAL
Daywork will be administered strictly in accordance with the
Conditions of Contract.
The Contractor will be paid for daywork carried out on the
instruction of the Engineer during the course of the Contract,
while other operations are in progress, at the rates inserted in
this Daywork Schedule.
The rates inserted by the Contractor against each item in the
Labour and Contractor's Equipment Sections of this Daywork
Schedule shall be deemed to cover and include for all overhead
and profit allowances.
The percentage addition inserted by the Contractor in the Materials
Section of this Daywork Schedule shall be deemed to cover and
include for all associated ancillary costs, and other required
allowances on Materials used in daywork.
The rates inserted in the Daywork Schedules shall be based on
the same costs computations, which the Contractor has used in
determining the unit rates and prices inserted in the Bill of
Quantities. Only time actually engaged in daywork operations, as
verified by the Engineer, will be allowed for payment purposes. In
the event of labour or Contractor's Equipment having to be
brought to the site especially for the item of daywork, then a
reasonable allowance may be made for travelling time, but the
allowance for travelling time shall be agreed in advance of
commencement of the daywork item.
BILL SUMMARY
Amount
Item No Description
R.O.
SUMMARY
GRAND SUMMARY
Amount
Item No Description
R.O.