Name JBES
E.Code - Loss : Quality KAIZEN SHEET
DEPT. Production
KK JH QM PM HSE OTPM DM E&T Bench Mark -
Change the design of R/G gauge as per Target -
Kaizen Theme : To improve the quality of Frame-R Kaizen Idea:
fitment of part in HMSI. Start date 12/5/2015
component
Finish date 15/5/15
Q
Nov-14 Dec-14 Jan-15 Feb-15 Mar-15 Apr-15 May-15
HORIZONTAL VERTICAL 1
POSITION POSITION
2. Why - Floor gap observed at customer end 1 Till now no issued observed S.N. Area Resp Target Date Status
Q
Nov-14 Dec-14 Jan-15 Feb-15 Mar-15 Apr-15 May-15
Sustenance Plan :
S.N. Activity Resp Frequency Remarks
Both block are Movable
movable
Fix Block Block 1
1. Why - One side clamping position of bottom fixed and other side movable Result : Horizontal Deployment :
2. Why -bottom bridge position has been shifted and welding position out
1 Improved the quality of bottom bridge S.N. Area Resp Target Date Status
and welding done on pipe.
3. Why - Welding torch position fixed but bottom bridge pipe position
2 1
movable.
4. Why - Bottom bridge pipe clamped by phenumatic cylinder 3
Problem Reported at :
Earthing P
sensor
Q
Nov-14 Dec-14 Jan-15 Feb-15 Mar-15 Apr-15 May-15
Sustenance Plan :
S.N. Activity Resp Frequency Remarks
2. Why - 1 Now flaring height problems not observed in pipe. S.N. Area Resp Target Date Status
3. Why - 2 1
4. Why - 3
5. Why - 4
Kaizen Month/ Status
S.No Resistered Name Problems Kaizen(Countermeasure) Benefit
Month
15-May
Front fork Dim 192.8 +/- 1.5 mm not maintain after final welding due to Make a block to hold the legs of pipe and block has been made the close
1 Mar-15 Udham singh Quality improved OK
welding distortion. tolerence of the pipe and specification of fork dimensions.
To observed the complaint from customer Hmsi , holder Dim. Spec. 31 +0.5 Make a new block in which added a outside block where with controlled the
2 Mar-15 Udham singh Quality improved OK
maximum limit (31.5) size not maintain . dim 31 +0.5mm.
At stem insertion operation after six month die wear out and make again new
Now make a saperate bush as which after 6 month wear out the die then
3 Mar-15 sadhu ram die for insertion . New die cost was Rs approx. Die cost saved OK
only we can change only bush so that we save the cost of die.
Both blocks are movable and welding torch position has been fix and blocks
One block has been fixed and second are movable as which parts welding
5 May-15 Himanshu sharma controlled by phenumatic cylinder as which bottom bridge position has been Quality improved OK
position has not been shifted.
shifted and welding position out and welding done on pipe.
Floor gap issues observed from customer end HMSI.Now no checking method Now we have change the design of R/G and parts check in vertical position
6 May-15 Vishnu pathak available in R/G gauge of Floor gap. Now part check in R/G gauge in as which Frame-R radius and mandrel gap has been reduce , and added a pin Quality improved OK
horizontaliy lay down position. to check the position of pipe , that is right or wrong.
Earthling sensor provided in fixture if pin not guide in hole machine can't run
8 Feb-15 Kamlesh hingwe Hole miss part Outflow , No provision to ensure Hole miss Pokayoke OK
Thread damage possibility in final welding fixture. F.F Assy . Final welding
fixture clamping position on stem thread position . Thread damage not possible in this operation.
10 Feb-15 Umesh singh Quality improved OK
11 Feb-15 Hole miss part Outflow IN K-38 Earthling sensor provided in fixture if pin not guide in hole machine can't run Quality improved Pokayoke not effective
Birju / Sonu / Kamlesh
Hingwe
12 Nov-14 Laxmi Stem rod piece reject due to stem rod pin hole out(not To provide the sensor with automation. To ensure the stem NG piece not send to OK
qualify) and NG piece send to assembly line rod hole is ok assembly line.
Company .Name JBES Loss :
E.Code KAIZEN SHEET
DEPT.
KK JH QM PM HSE OTPM DM E&T Bench Mark
Kaizen Idea:
Target
Kaizen Theme : Countermeasure:- Start date
Finish date
Problem/Present Status :
Team Members :
Problem Reported at :
Problem related to :
Before After Benefits in P Q C D S M
Q
Jul-14 Aug-14 Sep-14 Oct-14 Nov-14 Dec-14 Jan-15
Sustenance Plan :
S.N. Activity Resp Frequency Remarks
3. Why - 2
4. Why - 3
5. Why - 4