Professional Documents
Culture Documents
2402 R1 (A-02-0,A-02-1,S-01-0,S-01-0-A,S-04-0-B)
2402 R1 (A-02-0,A-02-1,S-01-0,S-01-0-A,S-04-0-B)
A
110' - 0" 6"
30' - 0" 40' - 0" 40' - 0" 6"
30' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 6"
5' - 0"
5' - 0"
8
6"
6"
28' - 10 1/2" 39' - 3" 39' - 3"
B B
14' - 0"
24' - 4 1/2"
24' - 4 1/2"
7
13' - 0"
C C
2' - 9"
2' - 9"
6
13' - 0"
D D
ROAD
78' - 0"
78' - 0"
78' - 6"
23' - 3"
78' - 6"
78' - 6"
23' - 3"
78' - 6"
80' - 0"
5
100' - 0"
13' - 0"
6" 28' - 1 1/2" 3"3" 18' - 9" 1' - 3" 18' - 10 1/2" 11
1/2"
1/2" 18' - 10 1/2" 1' - 3" 18' - 10 1/2" 1 1/2"
2' - 9"
2' - 9"
4
E E
13' - 0"
22' - 10 1/2"
22' - 10 1/2"
3
R1 30-03-24 Revision 2
R0 28-03-24 Initial
F No Date Description F
Current Revision / Issue Date :
14' - 0"
R1 /30-03-24
D:\OneDrive\Aakash Patel\Projects 24\2402 (Amitbhai Chalala 9327331190) (Plot No - G-3,G-4,G-5 Diamond Industrial Park Sachin)\Revit\2402 R1.rte
Sheet Name :
Ground Floor Plan
3' - 10 1/2"
3' - 10 1/2" 5' - 0" 15' - 0"
Sheet Number :
2' - 9"
2' - 9"
6"
A-02-0
2
5' - 0" 11" 4' - 0"
UP
Project Number :
3' - 6"
4' - 0"
3' - 6"
2402
10"
Project Name :
4' - 0"
15' - 6"
Amitbhai 9327331190
15' - 0"
15' - 0"
15' - 0"
15' - 0"
15' - 0"
14' - 0"
14' - 3"
G. Lift
15' - 0"
15' - 0"
G Mezzanine Mezzanine Mezzanine Project G
Plot No Address :
:- G-3,G-4,G-5
14' - 0"
5' - 11"
G. Lift Sachin, Surat.
Designed By :
UP
5' - 6"
W/C
3' - 3"
25' - 0" 7' - 0" 30' - 4 1/2" 24' - 3" 11' - 0"
3' - 8"
Entry Entry Entry Entry Entry Entry Drawn By :
3"
3"
1
N Checked By :
ROAD
Scale :
A AX B C D E F 1 : 100
H
1: - Ground Floor Plan
1 : 100
Ready To Execute :- × 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
A
110' - 0" 6"
30' - 0" 40' - 0" 40' - 0" 6"
30' - 0" 20' - 0" 20' - 0" 20' - 0" 20' - 0" 6"
5' - 0"
5' - 0"
8
28' - 10 1/2" 39' - 3" 39' - 3"
B B
14' - 0"
7
13' - 0"
C C
13' - 0"
D D
ROAD
78' - 0"
78' - 0"
78' - 6"
78' - 6"
78' - 6"
78' - 6"
80' - 0"
5
100' - 0"
13' - 0"
4
E E
13' - 0"
3
R1 30-03-24 Revision 2
R0 28-03-24 Initial
F No Date Description F
Current Revision / Issue Date :
14' - 0"
R1 /30-03-24
D:\OneDrive\Aakash Patel\Projects 24\2402 (Amitbhai Chalala 9327331190) (Plot No - G-3,G-4,G-5 Diamond Industrial Park Sachin)\Revit\2402 R1.rte
Sheet Name :
G.F. Mezzanine Plan
28' - 10 1/2" 39' - 3" 39' - 3"
Sheet Number :
A-02-1M
2
25' - 0" 29' - 7 1/2" 19' - 3" 4' - 3" 4' - 0"
UP
Project Number :
3' - 6"
4' - 0"
3' - 6" 11"
Passage
2402
8' - 0"
Project Name :
10"
DN
4' - 0"
Amitbhai 9327331190
14' - 3"
14' - 3"
14' - 3"
14' - 3"
14' - 3"
14' - 3"
14' - 3"
G. Lift
15' - 0"
15' - 0"
G 4' - 3" 5' - 6" G
Office Office Office Project
Plot No Address :
:- G-3,G-4,G-5
Diamond Industrial Park,
G. Lift Sachin, Surat.
5' - 11"
Designed By :
5' - 6"
5' - 6"
UP DN W/C W/C
25' - 0" Passage 29' - 7 1/2" 5' - 0" 19' - 3"
3' - 8"
Ready To Execute :- × 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6 7 8 9 10
5' - 0"
5' - 0"
9' - 0"
8
C5 C4N C2 C4 C2
C4NE [15" x30"] [12" x24"] [15" x30"] C4
[12" x12"] [15" x27"]
[15" x24"] FC5 [12" x24"]
B FC4N FC4 B
FC2 10' - 0" FC2 FC4
14' - 0"
FC4NE
7
C4NE C5 C4N C4 C4
[15" x24"] [12" x12"] [15" x27"] [12" x24"] [12" x24"]
FC5
FC4NE FC4N FC4 FC4
13' - 0"
C C
6
C4NE C5 C4N C1 C4 C1 C4
[15" x24"] [12" x12"] [15" x27"] [15" x33"] [12" x24"] [15" x33"] [12" x24"]
FC5
FC4NE FC4N FC4 FC4
13' - 0"
FC1 FC1
D D
ROAD
80' - 0"
5
C4NE C5 C4N C4 C4
[15" x24"] [12" x12"] [15" x27"] [12" x24"] [12" x24"]
FC5
100' - 0"
FC4NE FC4N FC4 FC4
13' - 0"
9' - 6"
10' - 6"
4
E C4NE C5 C4N C1 C4 C1 C4 E
[15" x24"] [12" x12"] [15" x27"] [15" x33"] [12" x24"] [15" x33"] [12" x24"]
FC5
FC4NE FC4N FC4 FC4
13' - 0"
FC1 FC1
7' - 6"
8' - 6"
3
C4NE C5 C4N C4 C4
[15" x24"] [12" x12"] [15" x27"] [12" x24"] [12" x24"]
FC5 R0 28-03-24 Initial
F No Date Description F
FC4NE FC4N FC4 FC4
Current Revision / Issue Date :
14' - 0"
6' - 3" 8' - 6" 8' - 0" R0 /01-04-24
D:\OneDrive\Aakash Patel\Projects 24\2402 (Amitbhai Chalala 9327331190) (Plot No - G-3,G-4,G-5 Diamond Industrial Park Sachin)\Revit\2402 R1.rte
Sheet Name :
4' - 6" Center Line Plan
Sheet Number :
9' - 0"
9' - 0"
9' - 0"
4' - 6"
15' - 0"
15' - 0"
G 6' - 3" 9' - 0" G
Project
Plot No Address :
:- G-3,G-4,G-5
FC3NE2 FC3E FC3E FC3E FC3E FC3E FC3E
Diamond Industrial Park,
C3 Sachin, Surat.
Designed By :
C3NE
6' - 3"
6' - 3"
Ready To Execute :- × 2 3 4 5 6 7 8 9 10
1 2 3 4 5 6
A ℄ ℄
Excavation Depth
Excavation Depth
As per Schedule
Starter
Bars
{LZ}
B Starter Bars B
{LZ}
[FT] [FT]
[3'']
[3'']
[6''] [6'']
[FD]
[PD] [FD]
[18''] [18'']
[3'']
[PD]
[FL] [FL]
[PL] [PL]
℄ ℄
P.C.C. (M15) [FB] [FB] P.C.C. (M15) [FB] [FB]
C Notes: Notes: C
• [PL] = P.C.C. Length • [FL] = Footing Length • [PL] = P.C.C. Length • [FL] = Footing Length
• [PW] = P.C.C. Width • [FW] = Footing Width • [PW] = P.C.C. Width • [FW] = Footing Width
• [PD] = P.C.C. Depth • [FD] = Footing Depth • [PD] = P.C.C. Depth • [FD] = Footing Depth
• {LZ} = Lapping Zone for Reinforcement • {LZ} = Lapping Zone for Reinforcement
D Foundation Notes: D
• Lay down Plain Cement Concrete (P.C.C.) as per the provided schedule.
Reduce Level
• Proceed with the work of foundation construction only after verifying the Safe Bearing Capacity
(S.B.C.). As per Client
Plinth
• The foundations are designed for a Safe Bearing Capacity (S.B.C.) of 220 kN/sq. m. (Generaly 2'-0'' from Road)
• Place the foundations at a minimum depth of 8'-0'' below the natural soil level. G.F. Mezzanine 11'-0'' from Plinth
• The foundations must be at least 1'-0'' below the yellow soil level. First Slab 22'-0'' from Plinth
• Avoid placing footings on black cotton soil; support all footings on hard strata with a minimum
F.F. Mezzanine 9'-0'' from First Slab
soil bearing capacity specified by the foundation drawing(s).
• In the case of adjacent footings at different levels, maintain a clear horizontal distance between Second Slab 18'-0'' from First Slab
the footings that is at least twice the difference between their bottom levels. If required, use Third Slab 12'-0'' from Second Slab
plumb concrete to raise the level of the lower footing. Mumty 9'-0'' from Third Slab
E E
Pad and Step Footing Schedule (M25:Fe500(M):Fe415(S))
P.C.C. Footing Footing Reinforcement
Footing Column Footing
Step Length Width Depth Length Width Depth Bottom Top
Mark Number Type
[PL] [PW] [PD] [FL] [FW] [FD] [FB] [FT] Clear Cover
Foundation Bottom
FC1 10' - 6" 9' - 6" 6" 10' - 0" 9' - 0" 33" Ø12@5''c/c Footing 50 mm
FC2 10' - 0" 9' - 0" 6" 9' - 6" 8' - 6" 30" Ø12@5''c/c Column 40 mm
FC3 9' - 0" 8' - 0" 6" 8' - 6" 7' - 6" 27" Ø12@5''c/c Beam 25 mm
FC3E 9' - 0" 6' - 3" 6" 8' - 6" 6' - 0" 27" Ø12@5''c/c Ø12@5''c/c Slab 15 mm
FC3N 9' - 0" 8' - 6" 6" 8' - 6" 8' - 0" 27" Ø12@5''c/c Raft 50 mm
F FC3NE 9' - 0" 6' - 3" 6" 8' - 6" 6' - 0" 30" Ø12@5''c/c Ø12@5''c/c Wall 40 mm F
FC3NE
6' - 3" 6' - 3" 6" 6' - 0" 6' - 0" 30" Ø12@5''c/c Ø12@5''c/c
2
D:\OneDrive\Aakash Patel\Projects 24\2402 (Amitbhai Chalala 9327331190) (Plot No - G-3,G-4,G-5 Diamond Industrial Park Sachin)\Revit\2402 R1.rte
FC4 8' - 6" 7' - 6" 6" 8' - 0" 7' - 0" 24" Ø12@5''c/c
FC4N 8' - 9" 8' - 0" 6" 8' - 3" 7' - 6" 27" Ø12@5''c/c
FC4NE 8' - 9" 6' - 3" 6" 8' - 3" 6' - 0" 27" Ø12@5''c/c Ø12@5''c/c
FC5 4' - 6" 4' - 6" 6" 4' - 0" 4' - 0" 12" Ø10@5''c/c
Shear Steel 90° Bend Shear Steel 135° Bend Shear Steel 180° Bend Standard 90° Bend Standard 180° Bend
Minimum [8Ø] Minimum [4Ø]
M
Minimum [4Ø]
in
G G
im
Minimum [8Ø]
[Ø
[Ø
[Ø
um
]
]
[6
[4
[4
Ø
Ø
]
Minimum [4Ø]
]
Notes:
• Sizes and dimensions in feet and inches.
Sheet Name : Sheet Number : Scale :
• Concrete mix ratios without mix design: Footing Schedule S-01-0-A As indicated
M15: 1 cement, 2 sand, 4 aggregate.
H M25: 1 cement, 1 sand, 2 aggregate. Project Number : Designed By :
• Use approved design mix concrete for RCC.
• Concrete temperature limit: 35°C. 2402
• Follow IS: 456 for RCC curing.
• Ensure clean reinforcement for bond strength. R0 28-03-24 Initial Project Name : Drawn By :
• Main steel lap length: 50Ø.
• Max bar to lap: 50% for specific sections. No Date Description Amitbhai 9327331190
• Separate reinforcement layers with spacer bars (25mm or larger) at max Current Revision / Issue Date : Project
Plot No Address :
:- G-3,G-4,G-5 Checked By :
1m apart.
R0 /01-04-24 Diamond Industrial Park,
Ready To Execute :- × 2 3 Sachin, Surat. 4 5 A3.P
1 2 3 4 5 6 7 8
THIRD SLAB M25 SIZE 15'' X 27'' 15'' X 27'' 15'' X 27'' 15'' X 24''
12-Bars
A TO Fe500 (M) STEEL 16-Ø16 16-Ø16 16-Ø16 14-Ø16 (12BT1)
MUMTY Fe415 (S) LINKS Ø8@4'' C/C + Ø8@6'' C/C Ø8@4'' C/C + Ø8@6'' C/C Ø8@4'' C/C + Ø8@6'' C/C Ø8@4'' C/C + Ø8@6'' C/C Typical Column Elevation
SECOND SLAB M25 SIZE 15'' X 27'' 15'' X 27'' 15'' X 27'' 15'' X 24'' ℄
[6'']
TO Fe500 (M) STEEL 16-Ø16 4-Ø20 + 12-Ø16 16-Ø16 14-Ø16
THIRD SLAB Fe415 (S) LINKS Ø8@4'' C/C + Ø8@6'' C/C Ø8@4'' C/C + Ø8@6'' C/C Ø8@4'' C/C + Ø8@6'' C/C Ø8@4'' C/C + Ø8@6'' C/C
[L4/3]
[LS]
FIRST SLAB M25 SIZE 15'' X 27'' 15'' X 27'' 15'' X 27'' 15'' X 24''
TO Fe500 (M) STEEL 6-Ø20 + 10-Ø16 4-Ø20 + 12-Ø16 4-Ø20 + 12-Ø16 4-Ø20 + 10-Ø16
[L4/3]
[LM]
SECOND SLAB Fe415 (S) LINKS Ø8@4'' C/C + Ø8@6'' C/C Ø8@4'' C/C + Ø8@6'' C/C Ø8@4'' C/C + Ø8@6'' C/C Ø8@4'' C/C + Ø8@6'' C/C
[L4]
{LZ}
B B
FOUNDATION M25 SIZE 15'' X 27'' 15'' X 27'' 15'' X 27'' 15'' X 24''
[L4/3]
TO Fe500 (M) STEEL 6-Ø20 + 10-Ø16 4-Ø20 + 12-Ø16 4-Ø20 + 12-Ø16 4-Ø20 + 10-Ø16 4-Bars
[LS]
(4BT1)
FIRST SLAB Fe415 (S) LINKS Ø8@4'' C/C + Ø8@6'' C/C Ø8@4'' C/C + Ø8@6'' C/C Ø8@4'' C/C + Ø8@6'' C/C Ø8@4'' C/C + Ø8@6'' C/C
C3N C4N C3NE C4NE
COLUMN MARKED
[L3/3]
[LS]
16-Bars
(16BT1)
THIRD SLAB M25 SIZE 15'' X 33'' 15'' X 30'' 12'' X 27'' 12'' X 24''
[L3/3]
[LM]
[L3]
{LZ}
C TO Fe500 (M) STEEL 16-Ø16 16-Ø16 14-Ø16 12-Ø16 C
MUMTY Fe415 (S) LINKS Ø8@4'' C/C + Ø8@6'' C/C Ø8@4'' C/C + Ø8@6'' C/C Ø8@4'' C/C + Ø8@6'' C/C Ø8@4'' C/C + Ø8@6'' C/C
[L3/3]
[LS]
SECOND SLAB M25 SIZE 15'' X 33'' 15'' X 30'' 12'' X 27'' 12'' X 24''
TO Fe500 (M) STEEL 16-Ø16 16-Ø16 14-Ø16 12-Ø16
THIRD SLAB Fe415 (S) LINKS Ø8@4'' C/C + Ø8@6'' C/C Ø8@4'' C/C + Ø8@6'' C/C Ø8@4'' C/C + Ø8@6'' C/C Ø8@4'' C/C + Ø8@6'' C/C
[L2/3]
[LS]
FIRST SLAB M25 SIZE 15'' X 33'' 15'' X 30'' 12'' X 27'' 12'' X 24''
TO Fe500 (M) STEEL 8-Ø20 + 8-Ø16 16-Ø16 4-Ø20 + 10-Ø16 4-Ø20 + 8-Ø16
[L2/3]
[LM]
[L2]
{LZ}
SECOND SLAB Fe415 (S) LINKS Ø8@4'' C/C + Ø8@6'' C/C Ø8@4'' C/C + Ø8@6'' C/C Ø8@4'' C/C + Ø8@6'' C/C Ø8@4'' C/C + Ø8@6'' C/C
D:\OneDrive\Aakash Patel\Projects 24\2402 (Amitbhai Chalala 9327331190) (Plot No - G-3,G-4,G-5 Diamond Industrial Park Sachin)\Revit\2402 R1.rte
D D
FOUNDATION M25 SIZE 15'' X 33'' 15'' X 30'' 12'' X 27'' 12'' X 24''
[L2/3]
[LS]
TO Fe500 (M) STEEL 8-Ø20 + 8-Ø16 4-Ø20 + 12-Ø16 4-Ø20 + 10-Ø16 4-Ø20 + 8-Ø16
FIRST SLAB Fe415 (S) LINKS Ø8@4'' C/C + Ø8@6'' C/C Ø8@4'' C/C + Ø8@6'' C/C Ø8@4'' C/C + Ø8@6'' C/C Ø8@4'' C/C + Ø8@6'' C/C 14-Bars
(14BT1) Plinth Beam
C1 C2 C3 C4 Natural
COLUMN MARKED
{LZ}
[L1]
FOUNDATION M25 SIZE 12'' X 12''
NOTES: As per Client
E 1. (M) - STEEL GRADE FOR Plinth TO Fe500 (M) STEEL 4-Ø16 E
(Generaly 2'-0'' from Road)
MAIN REINFORCEMENT PLINTH Fe415 (S) LINKS Ø8@5'' C/C
G.F. Mezzanine 11'-0'' from Plinth
2. (S) - STEEL GRADE FOR SHEAR
REINFORCEMENT/LINKS First Slab 22'-0'' from Plinth C5
COLUMN MARKED
F.F. Mezzanine 9'-0'' from First Slab
Second Slab 18'-0'' from First Slab
Third Slab 12'-0'' from Second Slab ℄
Mumty 9'-0'' from Third Slab
Notes:
• Sizes and dimensions in feet and inches.
Typical Column Lapping Clear Cover Sheet Name : Sheet Number : Scale :
• Concrete mix ratios without mix design: Column Schedule S-01-0-B As indicated
M15: 1 cement, 2 sand, 4 aggregate. Maximum Slope Maximum Slope Footing 50 mm
M25: 1 cement, 1 sand, 2 aggregate.
= 1:6 [50Ø] = 1:6 Project Number : Designed By :
F • Use approved design mix concrete for RCC. Column 40 mm 2402
• Concrete temperature limit: 35°C.
• Follow IS: 456 for RCC curing. Beam 25 mm Project Name : Drawn By :
• Ensure clean reinforcement for bond strength. R0 28-03-24 Initial
• Main steel lap length: 50Ø. Slab 15 mm No Date Description Amitbhai 9327331190
• Max bar to lap: 50% for specific sections. Stirrups Spacing
Minimum of [LS] or 4'' c/c Raft 50 mm Current Revision / Issue Date : Project
Plot No Address : Checked By :
• Separate reinforcement layers with spacer bars
(25mm or larger) at max 1m apart. :- G-3,G-4,G-5
Notes: Wall 40 mm R0 /01-04-24 Diamond Industrial Park,
• [LS] = Links Spacing at Support Sachin, Surat.
Ready To Execute :- × 2 3 4 5 6 7 A3.L