Reporte Escenario 1
Line/Cable/
XFMR2 XFMR3 Reactor Busway Impedance Tie PD Total
Number of Branches: 7 0 0 30 0 1 38
Adjustments
Apply Individual
Tolerance Adjustments /Global Percent
Apply Individual
Temperature Correction Adjustments /Global Degree C
Load
Load
Total Number of Buses: 39 0.245 0.110 0.717 0.000 0.000 0.000 0.000 0.000
0.000 0.000
Project: ETAP Page: 5
Line/Cable/Busway Length
ID Phase MVA Prim. kV Sec. kV % Z1 X1/R1 + 5% - 5% % Tol. Prim. Sec. %Z Type Angle
5000XF001C04-P 3-Phase 0.350 0.400 0.400 4.80 4.70 0 0 0 0 0 4.8000 Dyn 0.000
5000XF002C04-P 3-Phase 0.080 0.400 0.400 4.00 1.69 0 0 0 0 0 4.0000 Dyn 0.000
5000XL001C04-P 3-Phase 0.050 0.400 0.400 4.00 1.69 0 0 0 0 0 4.0000 Dyn 0.000
5200XJ001C04-P 3-Phase 0.010 0.400 0.400 4.00 1.13 0 0 0 0 0 4.0000 Dyn 0.000
5400XF001C04-P 3-Phase 0.150 0.400 0.400 4.00 3.45 0 0 0 0 0 4.0000 Dyn 0.000
5400XL001C04-P 3-Phase 0.070 0.400 0.400 4.00 1.69 0 0 0 0 0 4.0000 Dyn 0.000
TRANSFORMADOR T1 3-Phase 1.250 23.000 0.400 5.75 7.10 0 0 0 0 0 5.7500 Dyn 0.000
Project: ETAP Page: 7
Branch Connections
BARRA 0.400 98.691 -2.4 0.000 0.000 0.000 0.000 Barra 0.936 0.132 1382.0 99.0
Barra 0.400 98.556 -2.5 0.000 0.000 0.000 0.000 Bus8 0.070 0.030 112.2 92.0
* Bus2 23.000 100.000 0.0 0.942 0.174 0.000 0.000 Bus5 0.942 0.174 24.0 98.3
Bus5 23.000 100.000 0.0 0.000 0.000 0.000 0.000 BARRA 0.942 0.174 24.0 98.3
Bus8 0.400 98.548 -2.5 0.000 0.000 0.070 0.030 Barra -0.070 -0.030 112.2 92.0
Bus10 0.400 98.550 -2.5 0.000 0.000 0.005 0.003 Barra -0.005 -0.003 8.2 86.6
Bus13 0.400 98.550 -2.5 0.000 0.000 0.005 0.003 Barra -0.005 -0.003 8.2 86.6
Bus14 0.400 98.550 -2.5 0.000 0.000 0.005 0.003 Barra -0.005 -0.003 8.2 86.6
Bus19 0.400 98.550 -2.5 0.000 0.000 0.005 0.003 Barra -0.005 -0.003 8.2 86.6
Bus20 0.400 98.550 -2.5 0.000 0.000 0.003 0.002 Barra -0.003 -0.002 5.6 85.8
Bus21 0.400 98.547 -2.5 0.000 0.000 0.003 0.002 Barra -0.003 -0.002 5.6 85.8
Bus22 0.400 98.541 -2.5 0.000 0.000 0.014 0.000 Barra -0.014 0.000 20.3 100.0
Bus31 0.400 98.546 -2.5 0.000 0.000 0.009 0.000 Barra -0.009 0.000 13.5 100.0
Bus32 0.400 98.546 -2.5 0.000 0.000 0.009 0.000 Barra -0.009 0.000 13.5 100.0
Bus33 0.400 98.546 -2.5 0.000 0.000 0.009 0.000 Barra -0.009 0.000 13.5 100.0
Bus34 0.400 98.549 -2.5 0.000 0.000 0.003 0.000 Barra -0.003 0.000 4.1 100.0
Bus35 0.400 98.549 -2.5 0.000 0.000 0.003 0.000 Barra -0.003 0.000 4.1 100.0
Bus36 0.400 98.549 -2.5 0.000 0.000 0.003 0.000 Barra -0.003 0.000 4.1 100.0
Bus37 0.400 98.549 -2.5 0.000 0.000 0.003 0.000 Barra -0.003 0.000 4.1 100.0
Bus38 0.400 98.556 -2.5 0.000 0.000 0.003 0.000 Barra -0.003 0.000 4.1 100.0
Bus55 0.400 98.556 -2.5 0.000 0.000 0.018 0.000 Barra -0.018 0.000 27.0 100.0
Bus56 0.400 98.556 -2.5 0.000 0.000 0.018 0.000 Barra -0.018 0.000 27.0 100.0
Bus58 0.400 98.556 -2.5 0.000 0.000 0.007 0.000 Barra -0.007 0.000 10.5 100.0
Bus59 0.400 98.556 -2.5 0.000 0.000 0.007 0.000 Barra -0.007 0.000 10.5 100.0
Bus60 0.400 98.556 -2.5 0.000 0.000 0.007 0.000 Barra -0.007 0.000 10.5 100.0
Bus61 0.400 98.533 -2.5 0.000 0.000 0.149 0.065 Barra -0.149 -0.065 237.9 91.7
Bus62 0.400 98.548 -2.5 0.000 0.000 0.007 0.000 Barra -0.007 0.000 10.5 100.0
Bus63 0.400 97.038 -3.9 0.000 0.000 0.035 0.000 Bus75 -0.035 0.000 51.8 100.0
Bus64 0.400 97.195 -3.8 0.000 0.000 0.051 0.000 Bus76 -0.051 0.000 75.1 100.0
Bus65 0.400 97.510 -4.5 0.000 0.000 0.128 0.000 Bus78 -0.128 0.000 190.0 100.0
Bus66 0.400 97.433 -3.6 0.000 0.000 0.037 0.000 Bus77 -0.037 0.000 54.5 100.0
Bus75 0.400 97.062 -3.9 0.000 0.000 0.000 0.000 Bus63 0.035 0.000 51.8 100.0
Bus76 0.400 97.206 -3.8 0.000 0.000 0.000 0.000 Bus64 0.051 0.000 75.1 100.0
Bus77 0.400 97.438 -3.6 0.000 0.000 0.000 0.000 Bus66 0.037 0.000 54.5 100.0
Bus78 0.400 97.520 -4.5 0.000 0.000 0.000 0.000 Bus65 0.128 0.000 190.0 100.0
Bus80 0.400 97.560 -5.0 0.000 0.000 0.000 0.000 Bus81 0.309 0.000 456.5 100.0
Bus81 0.400 97.542 -5.0 0.000 0.000 0.309 0.000 Bus80 -0.309 0.000 456.5 100.0
Bus84 0.400 97.618 -3.1 0.000 0.000 0.000 0.000 Bus85 0.003 0.000 5.1 100.0
Bus85 0.400 97.612 -3.1 0.000 0.000 0.003 0.000 Bus84 -0.003 0.000 5.1 100.0
* Indicates a voltage regulated bus ( voltage controlled or swing type machine connected to it)
# Indicates a bus with a load mismatch of more than 0.1 MVA
Project: ETAP Page: 12
* Indicates operating load of a bus exceeds the bus critical limit ( 100.0% of the Continuous Ampere rating).
# Indicates operating load of a bus exceeds the bus marginal limit (95.0% of the Continuous Ampere rating).
Project: ETAP Page: 14
Transformer
CKT / Branch Busway / Cable & Reactor
Loading (input) Loading (output)
Ampacity Loading Capability
ID Type (Amp) Amp % (MVA) MVA % MVA %
Transformer
CKT / Branch Busway / Cable & Reactor
Loading (input) Loading (output)
Ampacity Loading Capability
ID Type (Amp) Amp % (MVA) MVA % MVA %
Vd
From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop
5000XF001C04-P 0.311 0.014 -0.309 0.000 2.9 13.4 98.6 97.6 1.00
5000XF002C04-P 0.051 0.001 -0.051 0.000 0.7 1.2 98.6 97.2 1.35
5000XL001C04-P 0.035 0.001 -0.035 0.000 0.5 0.9 98.6 97.1 1.49
5200XJ001C04-P 0.003 0.000 -0.003 0.000 0.0 0.0 98.6 97.6 0.94
5400XF001C04-P 0.130 0.004 -0.128 0.000 1.3 4.4 98.6 97.5 1.04
5400XL001C04-P 0.037 0.001 -0.037 0.000 0.4 0.7 98.6 97.4 1.12
Cable100 0.018 0.000 -0.018 0.000 0.0 0.0 98.6 98.6 0.00
Cable102 0.018 0.000 -0.018 0.000 0.0 0.0 98.6 98.6 0.00
Cable106 0.007 0.000 -0.007 0.000 0.0 0.0 98.6 98.6 0.00
Cable108 0.007 0.000 -0.007 0.000 0.0 0.0 98.6 98.6 0.00
Cable110 0.007 0.000 -0.007 0.000 0.0 0.0 98.6 98.6 0.00
Cable112 0.149 0.065 -0.149 -0.065 0.0 0.0 98.6 98.5 0.02
Cable114 0.007 0.000 -0.007 0.000 0.0 0.0 98.6 98.5 0.01
Cable116 -0.035 0.000 0.035 0.000 0.0 0.0 97.0 97.1 0.02
Cable118 -0.051 0.000 0.051 0.000 0.0 0.0 97.2 97.2 0.01
Cable120 -0.037 0.000 0.037 0.000 0.0 0.0 97.4 97.4 0.00
Cable122 -0.128 0.000 0.128 0.000 0.0 0.0 97.5 97.5 0.01
Cable124 0.936 0.132 -0.935 -0.131 1.1 1.5 98.7 98.6 0.14
Cable126 0.309 0.000 -0.309 0.000 0.1 0.0 97.6 97.5 0.02
Cable128 0.003 0.000 -0.003 0.000 0.0 0.0 97.6 97.6 0.01
Cable68 0.070 0.030 -0.070 -0.030 0.0 0.0 98.6 98.5 0.01
Cable70 0.005 0.003 -0.005 -0.003 0.0 0.0 98.6 98.6 0.01
Cable72 0.005 0.003 -0.005 -0.003 0.0 0.0 98.6 98.6 0.01
Cable74 0.005 0.003 -0.005 -0.003 0.0 0.0 98.6 98.6 0.01
Cable76 0.005 0.003 -0.005 -0.003 0.0 0.0 98.6 98.6 0.01
Cable78 0.003 0.002 -0.003 -0.002 0.0 0.0 98.6 98.6 0.01
Cable80 0.003 0.002 -0.003 -0.002 0.0 0.0 98.6 98.5 0.01
Cable82 0.014 0.000 -0.014 0.000 0.0 0.0 98.6 98.5 0.01
Cable84 0.009 0.000 -0.009 0.000 0.0 0.0 98.6 98.5 0.01
Cable86 0.009 0.000 -0.009 0.000 0.0 0.0 98.6 98.5 0.01
Cable88 0.009 0.000 -0.009 0.000 0.0 0.0 98.6 98.5 0.01
Cable90 0.003 0.000 -0.003 0.000 0.0 0.0 98.6 98.5 0.01
Cable92 0.003 0.000 -0.003 0.000 0.0 0.0 98.6 98.5 0.01
Cable94 0.003 0.000 -0.003 0.000 0.0 0.0 98.6 98.5 0.01
Project: ETAP Page: 17
Vd
From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop
Cable96 0.003 0.000 -0.003 0.000 0.0 0.0 98.6 98.5 0.01
Cable98 0.003 0.000 -0.003 0.000 0.0 0.0 98.6 98.6 0.00
TRANSFORMADOR T1 -0.936 -0.132 0.942 0.174 5.9 41.8 98.7 100.0 1.31
12.9 64.0
% Alert Settings
Critical Marginal
Loading
Bus 100.0 95.0
Bus Voltage
OverVoltage 105.0 102.0
Generator Excitation
OverExcited (Q Max.) 100.0 95.0
Marginal Report
MW Mvar MVA % PF
Number of Iterations: 3