Project: ETAP Page: 1

Location: 21.0.2C Date: 11-07-2024

Contract: SN: GHD-SA-CHL

Engineer: Revision: Base


Study Case: LF
Filename: 12639760 Config.: Normal

Electrical Transient Analyzer Program

Load Flow Analysis

Loading Category (1): FD.Max

Generation Category (1): Design

Load Diversity Factor: None

Swing V-Control Load Total


Number of Buses: 1 0 38 39

Line/Cable/
XFMR2 XFMR3 Reactor Busway Impedance Tie PD Total
Number of Branches: 7 0 0 30 0 1 38

Method of Solution: Adaptive Newton-Raphson Method

Maximum No. of Iteration: 99

Precision of Solution: 0.0001000

System Frequency: 50.00 Hz

Unit System: Metric

Project Filename: 12639760

Output Filename: C:\ETAP 2102\12639760\FDP.lfr


Project: ETAP Page: 2

Location: 21.0.2C Date: 11-07-2024

Contract: SN: GHD-SA-CHL

Engineer: Revision: Base


Study Case: LF
Filename: 12639760 Config.: Normal

Adjustments

Apply Individual
Tolerance Adjustments /Global Percent

Transformer Impedance: Yes Individual

Reactor Impedance: Yes Individual

Overload Heater Resistance: No

Transmission Line Length: No

Cable / Busway Length: No

Apply Individual
Temperature Correction Adjustments /Global Degree C

Transmission Line Resistance: Yes Individual

Cable / Busway Resistance: Yes Individual


Project: ETAP Page: 3

Location: 21.0.2C Date: 11-07-2024

Contract: SN: GHD-SA-CHL

Engineer: Revision: Base


Study Case: LF
Filename: 12639760 Config.: Normal

Bus Input Data

Load

Bus Initial Voltage Constant kVA Constant Z Constant I Generic

ID kV Sub-sys % Mag. Ang. MW Mvar MW Mvar MW Mvar MW Mvar

BARRA 0.400 1 100.0 0.0

Barra 0.400 1 100.0 0.0

Bus2 23.000 1 100.0 0.0

Bus5 23.000 1 100.0 0.0

Bus8 0.400 1 100.0 0.0 0.070 0.030

Bus10 0.400 1 100.0 0.0 0.005 0.003

Bus13 0.400 1 100.0 0.0 0.005 0.003

Bus14 0.400 1 100.0 0.0 0.005 0.003

Bus19 0.400 1 100.0 0.0 0.005 0.003

Bus20 0.400 1 100.0 0.0 0.003 0.002

Bus21 0.400 1 100.0 0.0 0.003 0.002

Bus22 0.400 1 100.0 0.0 0.014 0.000

Bus31 0.400 1 100.0 0.0 0.009 0.000

Bus32 0.400 1 100.0 0.0 0.009 0.000

Bus33 0.400 1 100.0 0.0 0.009 0.000

Bus34 0.400 1 100.0 0.0 0.003 0.000

Bus35 0.400 1 100.0 0.0 0.003 0.000

Bus36 0.400 1 100.0 0.0 0.003 0.000

Bus37 0.400 1 100.0 0.0 0.003 0.000

Bus38 0.400 1 100.0 0.0 0.003 0.000

Bus55 0.400 1 100.0 0.0 0.019 0.000

Bus56 0.400 1 100.0 0.0 0.019 0.000

Bus58 0.400 1 100.0 0.0 0.007 0.000

Bus59 0.400 1 100.0 0.0 0.007 0.000

Bus60 0.400 1 100.0 0.0 0.007 0.000

Bus61 0.400 1 100.0 0.0 0.149 0.065

Bus62 0.400 1 100.0 0.0 0.007 0.000

Bus63 0.400 1 100.0 0.0 0.037 0.000

Bus64 0.400 1 100.0 0.0 0.054 0.000

Bus65 0.400 1 100.0 0.0 0.135 0.000

Bus66 0.400 1 100.0 0.0 0.039 0.000

Bus75 0.400 1 100.0 0.0

Bus76 0.400 1 100.0 0.0


Project: ETAP Page: 4

Location: 21.0.2C Date: 11-07-2024

Contract: SN: GHD-SA-CHL

Engineer: Revision: Base


Study Case: LF
Filename: 12639760 Config.: Normal

Load

Bus Initial Voltage Constant kVA Constant Z Constant I Generic

ID kV Sub-sys % Mag. Ang. MW Mvar MW Mvar MW Mvar MW Mvar

Bus77 0.400 1 100.0 0.0

Bus78 0.400 1 100.0 0.0

Bus80 0.400 1 100.0 0.0

Bus81 0.400 1 100.0 0.0 0.324 0.000

Bus84 0.400 1 100.0 0.0

Bus85 0.400 1 100.0 0.0 0.004 0.000

Total Number of Buses: 39 0.245 0.110 0.717 0.000 0.000 0.000 0.000 0.000

Generation Bus Voltage Generation Mvar Limits

ID kV Type Sub-sys % Mag. Angle MW Mvar % PF Max Min

Bus2 23.000 Swing 1 100.0 0.0

0.000 0.000
Project: ETAP Page: 5

Location: 21.0.2C Date: 11-07-2024

Contract: SN: GHD-SA-CHL

Engineer: Revision: Base


Study Case: LF
Filename: 12639760 Config.: Normal

Line/Cable/Busway Input Data

ohms or siemens/1000 m per Conductor (Cable) or per Phase (Line/Busway)

Line/Cable/Busway Length

ID Library Size Adj. (m) % Tol. #/Phase T (°C) R X Y

Cable68 0.6MCUN1 350 1.0 0.0 1 75 0.124016 0.134252

Cable70 0.6MCUN3 6 1.0 0.0 1 75 1.673228 0.143537

Cable72 0.6MCUN3 6 1.0 0.0 1 75 1.673228 0.143537

Cable74 0.6MCUN3 6 1.0 0.0 1 75 1.673228 0.143537

Cable76 0.6MCUN3 6 1.0 0.0 1 75 1.673228 0.143537

Cable78 0.6MCUN3 8 1.0 0.0 1 75 2.660761 0.157743

Cable80 0.6MCUN1 10 1.0 0.0 1 75 3.937008 0.173885

Cable82 0.6MCUN3 6 1.0 0.0 1 75 1.673228 0.143537

Cable84 0.6MCUN3 6 1.0 0.0 1 75 1.673228 0.143537

Cable86 0.6MCUN3 6 1.0 0.0 1 75 1.673228 0.143537

Cable88 0.6MCUN3 6 1.0 0.0 1 75 1.673228 0.143537

Cable90 0.6MCUN1 10 1.0 0.0 1 75 3.937008 0.173885

Cable92 0.6MCUN1 10 1.0 0.0 1 75 3.937008 0.173885

Cable94 0.6MCUN1 10 1.0 0.0 1 75 3.937008 0.173885

Cable96 0.6MCUN1 10 1.0 0.0 1 75 3.937008 0.173885

Cable98 0.6MCUN1 500 1.0 0.0 5 75 0.096457 0.127395

Cable100 0.6MCUN1 500 1.0 0.0 5 75 0.096457 0.127395

Cable102 0.6MCUN1 500 1.0 0.0 5 75 0.096457 0.127395

Cable106 0.6MCUN1 500 1.0 0.0 5 75 0.096457 0.127395

Cable108 0.6MCUN1 500 1.0 0.0 5 75 0.096457 0.127395

Cable110 0.6MCUN1 500 1.0 0.0 5 75 0.096457 0.127395

Cable112 0.6MCUN1 250 1.0 0.0 1 75 0.181102 0.135335

Cable114 0.6MCUN1 6 1.0 0.0 1 75 1.673228 0.185925

Cable116 0.6MCUN1 4 1.0 0.0 1 75 1.053150 0.172802

Cable118 0.6MCUN1 2/0 1.0 0.0 1 75 0.334646 0.145735

Cable120 0.6MCUN1 4/0 1.0 0.0 1 75 0.209974 0.135860

Cable122 0.6MCUN1 350 1.0 0.0 1 75 0.124016 0.134252

Cable124 0.6MCUN1 500 10.0 0.0 5 75 0.096457 0.127395

Cable126 0.6MCUN1 250 1.0 0.0 2 75 0.181102 0.135335

Cable128 0.6MCUN1 8 1.0 0.0 1 75 2.660761 0.206135

Line / Cable / Busway resistances are listed at the specified temperatures.


Project: ETAP Page: 6

Location: 21.0.2C Date: 11-07-2024

Contract: SN: GHD-SA-CHL

Engineer: Revision: Base


Study Case: LF
Filename: 12639760 Config.: Normal

2-Winding Transformer Input Data

Transformer Rating Z Variation % Tap Setting Adjusted Phase Shift

ID Phase MVA Prim. kV Sec. kV % Z1 X1/R1 + 5% - 5% % Tol. Prim. Sec. %Z Type Angle

5000XF001C04-P 3-Phase 0.350 0.400 0.400 4.80 4.70 0 0 0 0 0 4.8000 Dyn 0.000
5000XF002C04-P 3-Phase 0.080 0.400 0.400 4.00 1.69 0 0 0 0 0 4.0000 Dyn 0.000

5000XL001C04-P 3-Phase 0.050 0.400 0.400 4.00 1.69 0 0 0 0 0 4.0000 Dyn 0.000

5200XJ001C04-P 3-Phase 0.010 0.400 0.400 4.00 1.13 0 0 0 0 0 4.0000 Dyn 0.000

5400XF001C04-P 3-Phase 0.150 0.400 0.400 4.00 3.45 0 0 0 0 0 4.0000 Dyn 0.000

5400XL001C04-P 3-Phase 0.070 0.400 0.400 4.00 1.69 0 0 0 0 0 4.0000 Dyn 0.000
TRANSFORMADOR T1 3-Phase 1.250 23.000 0.400 5.75 7.10 0 0 0 0 0 5.7500 Dyn 0.000
Project: ETAP Page: 7

Location: 21.0.2C Date: 11-07-2024

Contract: SN: GHD-SA-CHL

Engineer: Revision: Base


Study Case: LF
Filename: 12639760 Config.: Normal

Branch Connections

CKT/Branch Connected Bus ID % Impedance, Pos. Seq., 100 MVA Base


ID Type From Bus To Bus R X Z Y

5000XF001C04-P 2W XFMR Barra Bus80 285.40 1341.40 1371.43

5000XF002C04-P 2W XFMR Barra Bus76 2546.22 4303.11 5000.00

5000XL001C04-P 2W XFMR Barra Bus75 4073.95 6884.98 8000.00

5200XJ001C04-P 2W XFMR Barra Bus84 26508.68 29954.80 40000.00

5400XF001C04-P 2W XFMR Barra Bus78 742.39 2561.24 2666.67

5400XL001C04-P 2W XFMR Barra Bus77 2909.97 4917.84 5714.29

TRANSFORMADOR T1 2W XFMR Bus5 BARRA 64.17 455.50 460.00

Cable68 Cable Barra Bus8 7.75 8.39 11.42

Cable70 Cable Barra Bus10 104.58 8.97 104.96

Cable72 Cable Barra Bus13 104.58 8.97 104.96

Cable74 Cable Barra Bus14 104.58 8.97 104.96

Cable76 Cable Barra Bus19 104.58 8.97 104.96

Cable78 Cable Barra Bus20 166.30 9.86 166.59

Cable80 Cable Barra Bus21 246.06 10.87 246.30

Cable82 Cable Barra Bus22 104.58 8.97 104.96

Cable84 Cable Barra Bus31 104.58 8.97 104.96

Cable86 Cable Barra Bus32 104.58 8.97 104.96

Cable88 Cable Barra Bus33 104.58 8.97 104.96

Cable90 Cable Barra Bus34 246.06 10.87 246.30

Cable92 Cable Barra Bus35 246.06 10.87 246.30

Cable94 Cable Barra Bus36 246.06 10.87 246.30

Cable96 Cable Barra Bus37 246.06 10.87 246.30

Cable98 Cable Barra Bus38 1.21 1.59 2.00

Cable100 Cable Barra Bus55 1.21 1.59 2.00

Cable102 Cable Barra Bus56 1.21 1.59 2.00

Cable106 Cable Barra Bus58 1.21 1.59 2.00

Cable108 Cable Barra Bus59 1.21 1.59 2.00

Cable110 Cable Barra Bus60 1.21 1.59 2.00

Cable112 Cable Barra Bus61 11.32 8.46 14.13

Cable114 Cable Barra Bus62 104.58 11.62 105.22

Cable116 Cable Bus75 Bus63 65.82 10.80 66.70

Cable118 Cable Bus76 Bus64 20.92 9.11 22.81

Cable120 Cable Bus77 Bus66 13.12 8.49 15.63

Cable122 Cable Bus78 Bus65 7.75 8.39 11.42

Cable124 Cable BARRA Barra 12.06 15.92 19.97

Cable126 Cable Bus80 Bus81 5.66 4.23 7.07


Project: ETAP Page: 8

Location: 21.0.2C Date: 11-07-2024

Contract: SN: GHD-SA-CHL

Engineer: Revision: Base


Study Case: LF
Filename: 12639760 Config.: Normal

CKT/Branch Connected Bus ID % Impedance, Pos. Seq., 100 MVA Base


ID Type From Bus To Bus R X Z Y

Cable128 Cable Bus84 Bus85 166.30 12.88 166.80

SW1 Tie Switch Bus2 Bus5


Project: ETAP Page: 9

Location: 21.0.2C Date: 11-07-2024

Contract: SN: GHD-SA-CHL

Engineer: Revision: Base


Study Case: LF
Filename: 12639760 Config.: Normal

LOAD FLOW REPORT

Bus Voltage Generation Load Load Flow XFMR


ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp %PF %Tap

BARRA 0.400 98.691 -2.4 0.000 0.000 0.000 0.000 Barra 0.936 0.132 1382.0 99.0

Bus5 -0.936 -0.132 1382.0 99.0

Barra 0.400 98.556 -2.5 0.000 0.000 0.000 0.000 Bus8 0.070 0.030 112.2 92.0

Bus10 0.005 0.003 8.2 86.6

Bus13 0.005 0.003 8.2 86.6

Bus14 0.005 0.003 8.2 86.6

Bus19 0.005 0.003 8.2 86.6

Bus20 0.003 0.002 5.6 85.8

Bus21 0.003 0.002 5.6 85.8

Bus22 0.014 0.000 20.3 100.0

Bus31 0.009 0.000 13.5 100.0

Bus32 0.009 0.000 13.5 100.0

Bus33 0.009 0.000 13.5 100.0

Bus34 0.003 0.000 4.1 100.0

Bus35 0.003 0.000 4.1 100.0

Bus36 0.003 0.000 4.1 100.0

Bus37 0.003 0.000 4.1 100.0

Bus38 0.003 0.000 4.1 100.0

Bus55 0.018 0.000 27.0 100.0

Bus56 0.018 0.000 27.0 100.0

Bus58 0.007 0.000 10.5 100.0

Bus59 0.007 0.000 10.5 100.0

Bus60 0.007 0.000 10.5 100.0

Bus61 0.149 0.065 237.9 91.7

Bus62 0.007 0.000 10.5 100.0

BARRA -0.935 -0.131 1382.0 99.0

Bus80 0.311 0.014 456.5 99.9

Bus76 0.051 0.001 75.1 100.0

Bus75 0.035 0.001 51.8 100.0

Bus84 0.003 0.000 5.1 100.0

Bus78 0.130 0.004 190.0 99.9


Project: ETAP Page: 10

Location: 21.0.2C Date: 11-07-2024

Contract: SN: GHD-SA-CHL

Engineer: Revision: Base


Study Case: LF
Filename: 12639760 Config.: Normal

Bus Voltage Generation Load Load Flow XFMR


ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp %PF %Tap

Bus77 0.037 0.001 54.5 100.0

* Bus2 23.000 100.000 0.0 0.942 0.174 0.000 0.000 Bus5 0.942 0.174 24.0 98.3

Bus5 23.000 100.000 0.0 0.000 0.000 0.000 0.000 BARRA 0.942 0.174 24.0 98.3

Bus2 -0.942 -0.174 24.0 98.3

Bus8 0.400 98.548 -2.5 0.000 0.000 0.070 0.030 Barra -0.070 -0.030 112.2 92.0

Bus10 0.400 98.550 -2.5 0.000 0.000 0.005 0.003 Barra -0.005 -0.003 8.2 86.6

Bus13 0.400 98.550 -2.5 0.000 0.000 0.005 0.003 Barra -0.005 -0.003 8.2 86.6

Bus14 0.400 98.550 -2.5 0.000 0.000 0.005 0.003 Barra -0.005 -0.003 8.2 86.6

Bus19 0.400 98.550 -2.5 0.000 0.000 0.005 0.003 Barra -0.005 -0.003 8.2 86.6

Bus20 0.400 98.550 -2.5 0.000 0.000 0.003 0.002 Barra -0.003 -0.002 5.6 85.8

Bus21 0.400 98.547 -2.5 0.000 0.000 0.003 0.002 Barra -0.003 -0.002 5.6 85.8

Bus22 0.400 98.541 -2.5 0.000 0.000 0.014 0.000 Barra -0.014 0.000 20.3 100.0

Bus31 0.400 98.546 -2.5 0.000 0.000 0.009 0.000 Barra -0.009 0.000 13.5 100.0

Bus32 0.400 98.546 -2.5 0.000 0.000 0.009 0.000 Barra -0.009 0.000 13.5 100.0

Bus33 0.400 98.546 -2.5 0.000 0.000 0.009 0.000 Barra -0.009 0.000 13.5 100.0

Bus34 0.400 98.549 -2.5 0.000 0.000 0.003 0.000 Barra -0.003 0.000 4.1 100.0

Bus35 0.400 98.549 -2.5 0.000 0.000 0.003 0.000 Barra -0.003 0.000 4.1 100.0

Bus36 0.400 98.549 -2.5 0.000 0.000 0.003 0.000 Barra -0.003 0.000 4.1 100.0

Bus37 0.400 98.549 -2.5 0.000 0.000 0.003 0.000 Barra -0.003 0.000 4.1 100.0

Bus38 0.400 98.556 -2.5 0.000 0.000 0.003 0.000 Barra -0.003 0.000 4.1 100.0

Bus55 0.400 98.556 -2.5 0.000 0.000 0.018 0.000 Barra -0.018 0.000 27.0 100.0

Bus56 0.400 98.556 -2.5 0.000 0.000 0.018 0.000 Barra -0.018 0.000 27.0 100.0

Bus58 0.400 98.556 -2.5 0.000 0.000 0.007 0.000 Barra -0.007 0.000 10.5 100.0

Bus59 0.400 98.556 -2.5 0.000 0.000 0.007 0.000 Barra -0.007 0.000 10.5 100.0

Bus60 0.400 98.556 -2.5 0.000 0.000 0.007 0.000 Barra -0.007 0.000 10.5 100.0

Bus61 0.400 98.533 -2.5 0.000 0.000 0.149 0.065 Barra -0.149 -0.065 237.9 91.7

Bus62 0.400 98.548 -2.5 0.000 0.000 0.007 0.000 Barra -0.007 0.000 10.5 100.0

Bus63 0.400 97.038 -3.9 0.000 0.000 0.035 0.000 Bus75 -0.035 0.000 51.8 100.0

Bus64 0.400 97.195 -3.8 0.000 0.000 0.051 0.000 Bus76 -0.051 0.000 75.1 100.0

Bus65 0.400 97.510 -4.5 0.000 0.000 0.128 0.000 Bus78 -0.128 0.000 190.0 100.0

Bus66 0.400 97.433 -3.6 0.000 0.000 0.037 0.000 Bus77 -0.037 0.000 54.5 100.0

Bus75 0.400 97.062 -3.9 0.000 0.000 0.000 0.000 Bus63 0.035 0.000 51.8 100.0

Barra -0.035 0.000 51.8 100.0


Project: ETAP Page: 11

Location: 21.0.2C Date: 11-07-2024

Contract: SN: GHD-SA-CHL

Engineer: Revision: Base


Study Case: LF
Filename: 12639760 Config.: Normal

Bus Voltage Generation Load Load Flow XFMR


ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp %PF %Tap

Bus76 0.400 97.206 -3.8 0.000 0.000 0.000 0.000 Bus64 0.051 0.000 75.1 100.0

Barra -0.051 0.000 75.1 100.0

Bus77 0.400 97.438 -3.6 0.000 0.000 0.000 0.000 Bus66 0.037 0.000 54.5 100.0

Barra -0.037 0.000 54.5 100.0

Bus78 0.400 97.520 -4.5 0.000 0.000 0.000 0.000 Bus65 0.128 0.000 190.0 100.0

Barra -0.128 0.000 190.0 100.0

Bus80 0.400 97.560 -5.0 0.000 0.000 0.000 0.000 Bus81 0.309 0.000 456.5 100.0

Barra -0.309 0.000 456.5 100.0

Bus81 0.400 97.542 -5.0 0.000 0.000 0.309 0.000 Bus80 -0.309 0.000 456.5 100.0

Bus84 0.400 97.618 -3.1 0.000 0.000 0.000 0.000 Bus85 0.003 0.000 5.1 100.0

Barra -0.003 0.000 5.1 100.0

Bus85 0.400 97.612 -3.1 0.000 0.000 0.003 0.000 Bus84 -0.003 0.000 5.1 100.0
* Indicates a voltage regulated bus ( voltage controlled or swing type machine connected to it)
# Indicates a bus with a load mismatch of more than 0.1 MVA
Project: ETAP Page: 12

Location: 21.0.2C Date: 11-07-2024

Contract: SN: GHD-SA-CHL

Engineer: Revision: Base


Study Case: LF
Filename: 12639760 Config.: Normal

Bus Loading Summary Report

Directly Connected Load Total Bus Load

Bus Constant kVA Constant Z Constant I Generic


Percent
ID kV Rated Amp MW Mvar MW Mvar MW Mvar MW Mvar MVA % PF Amp Loading

BARRA 0.400 0.945 99.0 1382.0


Bus2 23.000 0.957 98.3 24.0
Bus5 23.000 0.957 98.3 24.0
Bus8 0.400 0.070 0.030 0.077 92.0 112.2
Bus10 0.400 0.005 0.003 0.006 86.6 8.2
Bus13 0.400 0.005 0.003 0.006 86.6 8.2
Bus14 0.400 0.005 0.003 0.006 86.6 8.2
Bus19 0.400 0.005 0.003 0.006 86.6 8.2
Bus20 0.400 0.003 0.002 0.004 85.8 5.6
Bus21 0.400 0.003 0.002 0.004 85.8 5.6
Bus22 0.400 0.014 0.014 100.0 20.3
Bus31 0.400 0.009 0.009 100.0 13.5
Bus32 0.400 0.009 0.009 100.0 13.5
Bus33 0.400 0.009 0.009 100.0 13.5
Bus34 0.400 0.003 0.003 100.0 4.1
Bus35 0.400 0.003 0.003 100.0 4.1
Bus36 0.400 0.003 0.003 100.0 4.1
Bus37 0.400 0.003 0.003 100.0 4.1
Bus38 0.400 0.003 0.003 100.0 4.1
Bus55 0.400 0.018 0.018 100.0 27.0
Bus56 0.400 0.018 0.018 100.0 27.0
Bus58 0.400 0.007 0.007 100.0 10.5
Bus59 0.400 0.007 0.007 100.0 10.5
Bus60 0.400 0.007 0.007 100.0 10.5
Bus61 0.400 0.149 0.065 0.162 91.7 237.9
Bus62 0.400 0.007 0.007 100.0 10.5
Bus63 0.400 0.035 - 0.035 100.0 51.8
Bus64 0.400 0.051 0.051 100.0 75.1
Bus65 0.400 0.128 0.128 100.0 190.0
Bus66 0.400 0.037 - 0.037 100.0 54.5
Bus75 0.400 0.035 100.0 51.8
Bus76 0.400 0.051 100.0 75.1
Bus77 0.400 0.037 100.0 54.5
Bus78 0.400 0.128 100.0 190.0
Bus80 0.400 0.309 100.0 456.5
Bus81 0.400 0.309 - 0.309 100.0 456.5
Bus84 0.400 0.003 100.0 5.1
Project: ETAP Page: 13

Location: 21.0.2C Date: 11-07-2024

Contract: SN: GHD-SA-CHL

Engineer: Revision: Base


Study Case: LF
Filename: 12639760 Config.: Normal

Directly Connected Load Total Bus Load

Bus Constant kVA Constant Z Constant I Generic


Percent
ID kV Rated Amp MW Mvar MW Mvar MW Mvar MW Mvar MVA % PF Amp Loading

Bus85 0.400 0.003 0.003 100.0 5.1

* Indicates operating load of a bus exceeds the bus critical limit ( 100.0% of the Continuous Ampere rating).
# Indicates operating load of a bus exceeds the bus marginal limit (95.0% of the Continuous Ampere rating).
Project: ETAP Page: 14

Location: 21.0.2C Date: 11-07-2024

Contract: SN: GHD-SA-CHL

Engineer: Revision: Base


Study Case: LF
Filename: 12639760 Config.: Normal

Branch Loading Summary Report

Transformer
CKT / Branch Busway / Cable & Reactor
Loading (input) Loading (output)
Ampacity Loading Capability
ID Type (Amp) Amp % (MVA) MVA % MVA %

Cable68 Cable 356.16 112.15 31.49

Cable70 Cable 66.12 8.22 12.43

Cable72 Cable 66.12 8.22 12.43

Cable74 Cable 66.12 8.22 12.43

Cable76 Cable 66.12 8.22 12.43

Cable78 Cable 48.42 5.58 11.52

Cable80 Cable 38.40 5.58 14.53

Cable82 Cable 66.12 20.27 30.66

Cable84 Cable 66.12 13.51 20.44

Cable86 Cable 66.12 13.51 20.44

Cable88 Cable 66.12 13.51 20.44

Cable90 Cable 38.40 4.05 10.56

Cable92 Cable 38.40 4.05 10.56

Cable94 Cable 38.40 4.05 10.56

Cable96 Cable 38.40 4.05 10.56

Cable98 Cable 2400.00 4.05 0.17

Cable100 Cable 2400.00 27.03 1.13

Cable102 Cable 2400.00 27.03 1.13

Cable106 Cable 2400.00 10.46 0.44

Cable108 Cable 2400.00 10.46 0.44

Cable110 Cable 2400.00 10.46 0.44

Cable112 Cable 309.12 237.88 76.95

Cable114 Cable 68.16 10.45 15.34

Cable116 Cable 92.16 51.78 56.19

Cable118 Cable 171.84 75.06 43.68

Cable120 Cable 266.88 54.53 20.43

Cable122 Cable 356.16 190.00 53.35

Cable124 Cable 2400.00 1382.01 57.58

Cable126 Cable 618.24 456.54 73.84

Cable128 Cable 49.92 5.07 10.16

5000XF001C04-P Transformer 0.350 0.312 89.1 0.309 88.2

5000XF002C04-P Transformer 0.080 0.051 64.1 0.051 63.2

5000XL001C04-P Transformer 0.050 0.035 70.7 0.035 69.6


Project: ETAP Page: 15

Location: 21.0.2C Date: 11-07-2024

Contract: SN: GHD-SA-CHL

Engineer: Revision: Base


Study Case: LF
Filename: 12639760 Config.: Normal

Transformer
CKT / Branch Busway / Cable & Reactor
Loading (input) Loading (output)
Ampacity Loading Capability
ID Type (Amp) Amp % (MVA) MVA % MVA %

5200XJ001C04-P Transformer 0.010 0.003 34.6 0.003 34.3

5400XF001C04-P Transformer 0.150 0.130 86.5 0.128 85.6

5400XL001C04-P Transformer 0.070 0.037 53.2 0.037 52.6

TRANSFORMADOR T1 Transformer 1.250 0.957 76.6 0.945 75.6

* Indicates a branch with operating load exceeding the branch capability.


Project: ETAP Page: 16

Location: 21.0.2C Date: 11-07-2024

Contract: SN: GHD-SA-CHL

Engineer: Revision: Base


Study Case: LF
Filename: 12639760 Config.: Normal

Branch Losses Summary Report

Vd
From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop

Branch ID MW Mvar MW Mvar kW kvar From To in Vmag

5000XF001C04-P 0.311 0.014 -0.309 0.000 2.9 13.4 98.6 97.6 1.00

5000XF002C04-P 0.051 0.001 -0.051 0.000 0.7 1.2 98.6 97.2 1.35

5000XL001C04-P 0.035 0.001 -0.035 0.000 0.5 0.9 98.6 97.1 1.49

5200XJ001C04-P 0.003 0.000 -0.003 0.000 0.0 0.0 98.6 97.6 0.94

5400XF001C04-P 0.130 0.004 -0.128 0.000 1.3 4.4 98.6 97.5 1.04

5400XL001C04-P 0.037 0.001 -0.037 0.000 0.4 0.7 98.6 97.4 1.12

Cable100 0.018 0.000 -0.018 0.000 0.0 0.0 98.6 98.6 0.00

Cable102 0.018 0.000 -0.018 0.000 0.0 0.0 98.6 98.6 0.00

Cable106 0.007 0.000 -0.007 0.000 0.0 0.0 98.6 98.6 0.00

Cable108 0.007 0.000 -0.007 0.000 0.0 0.0 98.6 98.6 0.00

Cable110 0.007 0.000 -0.007 0.000 0.0 0.0 98.6 98.6 0.00

Cable112 0.149 0.065 -0.149 -0.065 0.0 0.0 98.6 98.5 0.02

Cable114 0.007 0.000 -0.007 0.000 0.0 0.0 98.6 98.5 0.01

Cable116 -0.035 0.000 0.035 0.000 0.0 0.0 97.0 97.1 0.02

Cable118 -0.051 0.000 0.051 0.000 0.0 0.0 97.2 97.2 0.01

Cable120 -0.037 0.000 0.037 0.000 0.0 0.0 97.4 97.4 0.00

Cable122 -0.128 0.000 0.128 0.000 0.0 0.0 97.5 97.5 0.01

Cable124 0.936 0.132 -0.935 -0.131 1.1 1.5 98.7 98.6 0.14

Cable126 0.309 0.000 -0.309 0.000 0.1 0.0 97.6 97.5 0.02

Cable128 0.003 0.000 -0.003 0.000 0.0 0.0 97.6 97.6 0.01

Cable68 0.070 0.030 -0.070 -0.030 0.0 0.0 98.6 98.5 0.01

Cable70 0.005 0.003 -0.005 -0.003 0.0 0.0 98.6 98.6 0.01

Cable72 0.005 0.003 -0.005 -0.003 0.0 0.0 98.6 98.6 0.01

Cable74 0.005 0.003 -0.005 -0.003 0.0 0.0 98.6 98.6 0.01

Cable76 0.005 0.003 -0.005 -0.003 0.0 0.0 98.6 98.6 0.01

Cable78 0.003 0.002 -0.003 -0.002 0.0 0.0 98.6 98.6 0.01

Cable80 0.003 0.002 -0.003 -0.002 0.0 0.0 98.6 98.5 0.01

Cable82 0.014 0.000 -0.014 0.000 0.0 0.0 98.6 98.5 0.01

Cable84 0.009 0.000 -0.009 0.000 0.0 0.0 98.6 98.5 0.01

Cable86 0.009 0.000 -0.009 0.000 0.0 0.0 98.6 98.5 0.01

Cable88 0.009 0.000 -0.009 0.000 0.0 0.0 98.6 98.5 0.01

Cable90 0.003 0.000 -0.003 0.000 0.0 0.0 98.6 98.5 0.01

Cable92 0.003 0.000 -0.003 0.000 0.0 0.0 98.6 98.5 0.01

Cable94 0.003 0.000 -0.003 0.000 0.0 0.0 98.6 98.5 0.01
Project: ETAP Page: 17

Location: 21.0.2C Date: 11-07-2024

Contract: SN: GHD-SA-CHL

Engineer: Revision: Base


Study Case: LF
Filename: 12639760 Config.: Normal

Vd
From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop

Branch ID MW Mvar MW Mvar kW kvar From To in Vmag

Cable96 0.003 0.000 -0.003 0.000 0.0 0.0 98.6 98.5 0.01

Cable98 0.003 0.000 -0.003 0.000 0.0 0.0 98.6 98.6 0.00

TRANSFORMADOR T1 -0.936 -0.132 0.942 0.174 5.9 41.8 98.7 100.0 1.31

12.9 64.0

* This Transmission Line includes Series Capacitor.


Project: ETAP Page: 18

Location: 21.0.2C Date: 11-07-2024

Contract: SN: GHD-SA-CHL

Engineer: Revision: Base


Study Case: LF
Filename: 12639760 Config.: Normal

Alert Summary Report

% Alert Settings
Critical Marginal
Loading
Bus 100.0 95.0

Cable / Busway 100.0 95.0

Reactor 100.0 95.0

Line 100.0 95.0

Transformer 100.0 95.0

Panel 100.0 95.0

Protective Device 100.0 95.0

Generator 100.0 95.0

Inverter/Charger 100.0 95.0

Bus Voltage
OverVoltage 105.0 102.0

UnderVoltage 95.0 98.0

Generator Excitation
OverExcited (Q Max.) 100.0 95.0

UnderExcited (Q Min.) 100.0

Marginal Report

Device ID Type Condition Rating/Limit Unit Operating % Operating Phase Type

Bus63 Bus Under Voltage 0.400 kV 0.388 97.0 3-Phase

Bus64 Bus Under Voltage 0.400 kV 0.389 97.2 3-Phase

Bus65 Bus Under Voltage 0.400 kV 0.390 97.5 3-Phase

Bus66 Bus Under Voltage 0.400 kV 0.390 97.4 3-Phase

Bus75 Bus Under Voltage 0.400 kV 0.388 97.1 3-Phase

Bus76 Bus Under Voltage 0.400 kV 0.389 97.2 3-Phase

Bus77 Bus Under Voltage 0.400 kV 0.390 97.4 3-Phase

Bus78 Bus Under Voltage 0.400 kV 0.390 97.5 3-Phase

Bus80 Bus Under Voltage 0.400 kV 0.390 97.6 3-Phase

Bus81 Bus Under Voltage 0.400 kV 0.390 97.5 3-Phase

Bus84 Bus Under Voltage 0.400 kV 0.390 97.6 3-Phase

Bus85 Bus Under Voltage 0.400 kV 0.390 97.6 3-Phase


Project: ETAP Page: 19

Location: 21.0.2C Date: 11-07-2024

Contract: SN: GHD-SA-CHL

Engineer: Revision: Base


Study Case: LF
Filename: 12639760 Config.: Normal

SUMMARY OF TOTAL GENERATION , LOADING & DEMAND

MW Mvar MVA % PF

Source (Swing Buses): 0.942 0.174 0.957 98.33 Lagging

Source (Non-Swing Buses): 0.000 0.000 0.000

Total Demand: 0.942 0.174 0.957 98.33 Lagging

Total Motor Load: 0.245 0.110 0.269 91.25 Lagging

Total Static Load: 0.683 0.000 0.683 100.00 Lagging

Total Constant I Load: 0.000 0.000 0.000

Total Generic Load: 0.000 0.000 0.000

Apparent Losses: 0.013 0.064

System Mismatch: 0.000 0.000

Number of Iterations: 3