GROUND PLINTH BEAM DETAIL

GB1 GB1 GB1


45cm 8mm0@10cmc/c
Floor beams

Ell of full beams depth

45cm Continuous Rings.

GB1 GB1 8mm0@15cmc/c


GB1 GB1
8mm0@10cmc/c
45cm
G. beams
Ell of full beams depth
GENERAL NOTES:-

GB1 GB2 PB1 PCB 45cm * Please contact us for any difficulty, before execution.
* Lap length [Ld] for H.Y.S. Deformed bar [ Fe- 415], & conc.M20.
a) 50 times diametre of bar in Compretion.
EQ EQ EQ b) 60 times diametre of bar in Tension.
* All R.C.C. work shall be executed strictly under competent

PB1 PB 7.5cm ell Engineer seperately provided by the owner.

PB1 45cm d2 d3
* Grade of Concrete for R.C.C. shall be AS SPACIFIED by us
with minimum/maximum Cement contents and W/C Ratio
PCB P.C.C=1:3:6
d1
15cm
as per IS 456 : 2000.

* CEMENT shall confirm to (a) OPC -IS : 8112/ IS : 12269,


FOOTING SECTION
GB2 (b) PPC -IS : 1489.
* FlLY ASH shall confirm to IS : 3812.
* CHEMICAL ADMIXTURES shall confirm to IS : 9103.

PB * 0 Indicates MILD STEEL bars conforming to IS: 2062.


* 0 Indicates HIGHYIELD STRENGTH DEFORMED STEEL bars
conforming to IS: 1786 - Fe 415.
* Contractor & Engineer shall well known with all requirements of -
PB1 PB1 (a) IS : 456 : 2000 for all R.C.C. and P.C.C. works,

PB1 (b) IS : 800 for all STRUCTURAL STEEL works.


* Construction Joint - (a) In the SLAB shall be located at L/4 ,

PB (b) In the BEAM with our prior permission,


(c) In the CANTILEVER and LARGE SPAN SLAB/BEAM,
No construction joint is permission.
* Contractor shall be responsible for Design and Satisfactory Performance
of the FORMWORK.
* For Beam Depth more than 75cm, Provide Side Face Reinforcement.

PB1 PB1 * All beam bars to carry ELL of full beam depth as per Typical Details.

CLEAR COVER TO REINFORCEMENT:-


GROUND PLINTH BEAM PLAN BOTTOM TOP SIDE

DETAILS OF BEAMS
1) FOOTINGS./RAFT. 50mm 50mm 75mm
2) COLUMNS. - - 40mm
3) GROUND BEAM. 40mm 25mm 25mm
4) FLOOR BEAMS. 25mm 25mm 25mm
5) FLOOR SLAB. 20mm 20mm 25mm
6) R.C.C.WALL. - - 25mm

BOTTOM BARS. TOP BARS. STIRRUPS. 7) O/H TANK.


8) U/G TANK.
Pardi = 25mm
Pardi = 40mm
Slab = 25mm
Raft = 40mm

BEAM L/2 IN LENGTH UP TO L/4 ON UP TO L/4 ON UP TO L/4 IN CENTRAL


SIZE IN CENTRAL FROM
REMARKS
NO FULL FULL PORTION
PORTION CONT-SUPPORT END SUPPORT SUPPORT
GB1 9"x18" 3-12 0 2-12 0 1-16 0 1-12 0 8mm 0 @15cmc/c 8mm 0 @15cmc/c

GB2 GROUND BEAM red brick work


9"X18" 4-12 0 2-12 0 1-16 0 1-12 0 8mm 0 @15cmc/c 8mm 0 @15cmc/c PROJECT: G+1 BUNGLOW

SUBJECT: GROUND PLINTH BEAM


PCB 9"X18" 2-12 0 3-16 0 8mm 0 @15cmc/c 8mm 0 @15cmc/c ARCH; M/S HARDIK BEDMUTHA SCALE- 1:100
DATE;

PB 6"X12" 2-12 0 2-10 0 1-16 0 1-16 0 8mm 0 @15cmc/c 8mm 0 @15cmc/c PLINTH BEAM
7/02/2020
HORIZON
DRN BY;
JAGDISH Consultants CONSULTING CIVIL ENGINEERS

PB1 6"X18" 4-12 0 2-12 0 1-16 0 1-16 0 8mm 0 @15cmc/c 8mm 0 @15cmc/c CHD BY; SHOP NO 1A VIRAL PARK TAKLI ROAD DWARKA
PH;7875040659
E--mail: er.amitdholu@gmail.com