Professional Documents
Culture Documents
swd
swd
152
E=504805.0680
mØ 45° Bend:1No. N=2775664.0700
LY-G/230
160mmØ C1 4D 01
R0,6
ngth:10.00m E=504814.0956 05
R15
04
RC-F-033
Pipe Length:14.58m
6488591
160mmØ 45° Bend:1No.
TOK TOK
'Y'-160x160mm:1 No.
PROPOSED SIDE ENTRY GULLY WILL
33.000 32.920
250Ø L=29.4m
CONNECT TO EXISTING GULLY LINE
GULLY-G/235&236 E504774.032
CL=32.966 N2775620.872
TOK
E=504779.0364
PROPOSED 80mm DRIVE WAY PAVING
32.932
TOK
32.852
N=2775622.2600 SA1/23/A9/2
PROPOSED UPSTAND KERB
160mmØ C1 CL: 32.064 250Ø L=49.88m
Pipe Length:4.75m K
B B
'Y'-160x160mm:1 No. 07 08
TOK TOK
32.826 32.746
SA1/23/A9/1
CL: 32.854 TOK
32.780
TOK
32.700
IL: 31.562
EX.CL: 32.788
NEW.CL:31.562 TOK TOK
AR31_03 PROPOSED SIDE ENTRY GULLY WILL 32.726 32.646
5
CONNECTGULLY-G/238&239
TO EXISTING GULLY LINE
6488594
.
E504727.157
3
CL=32.607
N2775586.133
2
EXISTING GULLY
E=504724.4674
=
TOK TOK
L
OK 3
160mmØ C1 K
09 10 T 2.59
3
TO .673
Pipe Length:5.00m 32