02/12/2022
9742398164 / 8050222098
Project 01
Location:- WHPM 96P, 16th Cross Rd, Jaya Nagar 1st Block,
Jayanagar 3rd Block, Jayanagar, Bengaluru, Karnataka
560041, India
Mob: 9060666691
PROJECT OVERVIEW
This is an Apartment Project: G+4, Construction Stage 4th Slab work, Construction
Build up area 6000 sft, Completion Expected: 2 months.
Picher projet
https://btssoftware.techyzer.com/wp-content/uploads/gravity_forms/1-
88622f767d7504068c954512e31f3a0e/2022/10/IMG20221018121054.jpg
SPECIFIC REQUIERMENTS
Scaffolding, Sand, Concrete Block, Concrete Equipment, Ready mix concrete,
Reinforced Cement, Concrete Slab, Generator, Water proofing, S.S Pipes, CR Pipes,
HDPE Pipes, Pumps & fittings, Sheets, TMT Bars, Bright Bars, Flooring Vitrified
tiles, Marble & Granites, Skid Ceramic Tiles, PVC Pipes, Lifts, UPVC Windows, Fire
Fighting, Security System, Weight Trollies, Elevator, transformer, Air Conditioner,
Fire Fighting Eqpments, Security, Landscape Gardening, well equipped
Gymnasium, Solar systems, Wooden Flooring, Modular Kitchen, Cp & sanitary
fittings, Sewage Treatment Plant, Water softening plant, water Harvesting System,
Lighting,ETC.
Project plus services 15/11/2022
Project 02
Location:- 817, 17th Cross Rd, Jaya Nagar 1st Block, Jayanagar
3rd Block, Jayanagar, Bengaluru, Karnataka 560041,
India
Mob: 8660373768
PROJECT OVERVIEW
This is a Commercial Project: G+4, Construction Stage excavation work,
Construction Build up area 3200 sft. Completion Expected: 11 months
Picher projet
https://btssoftware.techyzer.com/wp-content/uploads/gravity_forms/1-
88622f767d7504068c954512e31f3a0e/2022/10/16660760391421564287810346321774.jpg
SPECIFIC REQUIERMENTS
Scaffolding, Sand(M.Sand), Jally 20mm, Ready mix concrete(M-20), Cement, Solid
Blocks, Concrete Block(6 inches), TMT, Water proofing, S.S Pipes, Pvc Pipes,
HDPE Pipes, Pumps & fittings, Sheets, Flooring Vitrified tiles, Skid Ceramic Tiles,
PVC Pipes, Security System, Weighing Lift, concrete mixer, Generator, Air
Conditioner, Solar systems, wooden Flooring, Cp& sanitary fittings, Lighting,
Electrical Equipments, Cable Wire, Modular Switches, Water tank, UPS Fire Alarm,
Fire Doors, Fire Fighting Equipments, False Ceiling, ,UPVC & Aluminum Windows &
Glazing Work, Glass Work, Security System, CctvCamera, Led Lights, Painting,
ETC.
Project plus services 15/11/2022
Project 03
Mob: 9994709781,
Email: murasolimaran777@gmail.com,
PROJECT OVERVIEW
This is a Residential Project: G+3, Construction Stage 3rd Slab work, Construction
Build up area 2800 sft. Completion Expected: 3 months
Picher projet
https://btssoftware.techyzer.com/wp-content/uploads/gravity_forms/1-
88622f767d7504068c954512e31f3a0e/2022/10/IMG20221018124310.jpg
SPECIFIC REQUIERMENTS
Water proofing, S.S Pipes, Pvc Pipes, HDPE Pipes, Pumps & fittings, Sheets,
Flooring Vitrified tiles, Skid Ceramic Tiles, PVC Pipes, Wooden/UPVC Windows,
Security System, Lift, concrete mixer, Generator, Air Conditioner, Solar systems,
wooden Flooring, Cp& sanitary fittings, Lighting, Electrical Equipments, Cable Wire,
Modular Switches, Water tank, UPS, Modular Kitchen, Curtains, Plywood Boards &
Laminates, Glass Work, S.S. Railing, Blinds, wallpapers, Mattress, Carpet,
Upholstery, Pillow/ Blinds, UPS, Home Automation, CctvCamera, Led Lights,
Painting, ETC.
Project plus services 15/11/2022
Project 04
Builder / contractor SSVC & Infrastructure Pvt. Ltd. Deepak Nursing Home,
445, 2nd Main Rd, Yediyur, Banashankari, Bengaluru,
Karnataka 560070
Mr.Hari
080 26721381
Email: info@ssvcinfra.com
PROJECT OVERVIEW
This is a Residential Project: G+4, Construction Stage ground floor Pillar work,
Construction Build up area 15000 sft, Completion Expected: 1 Year
Picher projet
https://btssoftware.techyzer.com/wp-content/uploads/gravity_forms/1-
88622f767d7504068c954512e31f3a0e/2022/10/16660788093932452471581135752563.jpg
SPECIFIC REQUIERMENTS
Project 05
PROJECT OVERVIEW
This is a Residential Project: G+5, Construction Stage Pillar work, Construction
Build up area 18000 sft. Completion Expected: 1 Year.
Picher projet
https://btssoftware.techyzer.com/wp-content/uploads/gravity_forms/1-
88622f767d7504068c954512e31f3a0e/2022/10/IMG20221018132950.jpg
SPECIFIC REQUIERMENTS
Project 06
Location:- 48, 6th Main Rd, 6th Block, 5th Block, Jayanagar,
Bengaluru, Karnataka 560041, India
Email: balu.kunapalli@gmail.com
PROJECT OVERVIEW
This is a Residential Project: G+5, Construction Stage Pillar work, Construction
Build up area 18000 sft. Completion Expected: 1 Year.
Picher projet
https://btssoftware.techyzer.com/wp-content/uploads/gravity_forms/1-
88622f767d7504068c954512e31f3a0e/2022/10/IMG20221018132950.jpg
SPECIFIC REQUIERMENTS
Project 07
Mob: 9071448886
PROJECT OVERVIEW
This is an Apartment Project: G+5, Construction Stage Pillar work, Construction
Build up area 10000 sft, Completion Expected: 1 Year
Picher projet
https://btssoftware.techyzer.com/wp-content/uploads/gravity_forms/1-
88622f767d7504068c954512e31f3a0e/2022/10/IMG20221018144137.jpg
SPECIFIC REQUIERMENTS
Scaffolding, Sand, Concrete Block, Concrete Equipment, Ready mix concrete,
Reinforced Cement, Concrete Slab, Generator, Water proofing, S.S Pipes, CR Pipes,
HDPE Pipes, Pumps & fittings, Sheets, TMT Bars, Bright Bars, Flooring Vitrified
tiles, Marble & Granites, Skid Ceramic Tiles, PVC Pipes, Lifts, UPVC Windows, Fire
Fighting, Security System, Weight Trollies, Elevator, transformer, Air Conditioner,
Fire Fighting Eqpments, Security, Landscape Gardening, well equipped
Gymnasium, Solar systems, Wooden Flooring, Modular Kitchen, Cp & sanitary
fittings, Sewage Treatment Plant, Water softening plant, water Harvesting System,
Lighting,ETC.
.
Project plus services 15/11/2022
Project 09
Mob: 9900669706
Email: ganga3913@gmail.com
PROJECT OVERVIEW
This is a Residential Project: G+3, Construction Stage Pillar work, Construction
Build up area 3500 sft, Completion Expected: 10 months.
Picher projet
https://btssoftware.techyzer.com/wp-content/uploads/gravity_forms/1-
88622f767d7504068c954512e31f3a0e/2022/10/16662466486481135635652443268813.jpg
SPECIFIC REQUIERMENTS
Project 10
Location:- 16, 1st Main 3rd Cross Rd, Maruthi Layout, Dasarahalli,
Bengaluru, Karnataka 560001,
Email: archsurendra@gmail.com,
PROJECT OVERVIEW
This is a Duplex House Project:G+3, Construction Stage 1st Slab work,
Construction Build up area 5000 sft. Completion Expected: 8 months.
Picher projet
https://btssoftware.techyzer.com/wp-content/uploads/gravity_forms/1-
88622f767d7504068c954512e31f3a0e/2022/10/16662476013734945566157309689341.jpg
SPECIFIC REQUIERMENTS
Scaffolding, Sand(M.Sand), Jally 20mm, Ready mix concrete(M-20), Cement, Solid
Blocks, Concrete Block(6 inches), TMT, Water proofing, S.S Pipes, Pvc Pipes,
HDPE Pipes, Pumps & fittings, Sheets, Flooring Vitrified tiles, Skid Ceramic Tiles,
PVC Pipes, Wooden/UPVC Windows, Security System, Weighing Lift, Generator, Air
Conditioner, Solar systems, wooden Flooring, Cp& sanitary fittings, Lighting,
Electrical Equipments, Cable Wire, Modular Switches, Water tank, Modular Kitchen,
Curtains, Plywood Boards & Laminates, Glass Work, S.S. Railing, Blinds,
wallpapers, Mattress, Carpet, Upholstery, Pillow/ Blinds, UPS, Home Automation,
CctvCamera, Led Lights, Painting, ETC.
Project plus services 15/11/2022
Project 11
PROJECT OVERVIEW
This is a Residential Project: G+2, Construction Stage 1st Slab work, Construction
Build up area 2400 sft. Completion Expected: 5 months.
Picher projet
https://btssoftware.techyzer.com/wp-content/uploads/gravity_forms/1-
88622f767d7504068c954512e31f3a0e/2022/10/IMG20221020121309.jpg
SPECIFIC REQUIERMENTS
Project 12
Mob: 9113616434,
mob: 9353413391
Email: ravishanmugam646@gmail.com
PROJECT OVERVIEW
This is an Aprtment Project: G+4, Construction Stage 4th Slab & Plastering work,
Construction Build up area 16000 sft. Completion Expected: 2 months.
Picher projet
https://btssoftware.techyzer.com/wp-content/uploads/gravity_forms/1-
88622f767d7504068c954512e31f3a0e/2022/10/16662501278405022634808154216540.jpg
SPECIFIC REQUIERMENTS
Water proofing, S.S Pipes, Pvc Pipes, HDPE Pipes, Pumps & fittings, Sheets,
Flooring Vitrified tiles, Skid Ceramic Tiles, PVC Pipes, UPVC Windows & Doors,
Security System, Weighing Lift, Generator, Air Conditioner, Solar systems, wooden
Flooring, Cp& sanitary fittings, Lighting, Electrical Equipments, Cable Wire, Modular
Switches, Water tank, Modular Kitchen, Curtains, Plywood Boards & Laminates,
Glass Work, S.S. Railing, Blinds, wallpapers, Mattress, Carpet, Upholstery, Pillow/
Blinds, UPS, Home Automation, CctvCamera, Led Lights, Painting, ETC.
Project plus services 15/11/2022
Project 13
PROJECT OVERVIEW
This is a Residential Project: G+2, Construction Stage 2nd Slab work Construction
Build up area 4500 sft. Completion Expected: 3 months.
Picher projet
https://btssoftware.techyzer.com/wp-content/uploads/gravity_forms/1-
88622f767d7504068c954512e31f3a0e/2022/10/16662509152903556065201370455202.jpg
SPECIFIC REQUIERMENTS
Scaffolding, Sand(M.Sand), Jally 20mm, Cement, Solid Blocks, Concrete Block(6
inches), TMT, Water proofing, S.S Pipes, Pvc Pipes, HDPE Pipes, Pumps & fittings,
Sheets, Flooring Vitrified tiles, Skid Ceramic Tiles, PVC Pipes, Wooden/UPVC
Windows, Security System, Weighing Lift, Generator, Air Conditioner, Solar
systems, wooden Flooring, Cp& sanitary fittings, Lighting, Electrical Equipments,
Cable Wire, Modular Switches, Water tank, Modular Kitchen, Curtains, Plywood
Boards & Laminates, Glass Work, S.S. Railing, Blinds, wallpapers, Mattress,
Carpet, Upholstery, Pillow/ Blinds, UPS, Home Automation, CctvCamera, Led Lights,
Painting, ETC.
Project plus services 15/11/2022
Project 14
Email: victorbabu2005@gmail.com,
PROJECT OVERVIEW
This is a Residential Project: G+2, Construction Stage excavation work,
Construction Build up area 2200 sft. Completion Expected: 12 months.
Picher projet
https://btssoftware.techyzer.com/wp-content/uploads/gravity_forms/1-
88622f767d7504068c954512e31f3a0e/2022/10/IMG20221020125955.jpg
SPECIFIC REQUIERMENTS
Project 15
PROJECT OVERVIEW
This is a Duplex House / Villa Project: G+3, Construction Stage 1st Slab work,
Construction Build up area 6000 sft. Completion Expected: 10 months.
Picher projet
https://btssoftware.techyzer.com/wp-content/uploads/gravity_forms/1-
88622f767d7504068c954512e31f3a0e/2022/10/IMG20221020131148.jpg
SPECIFIC REQUIERMENTS
Project 16
PROJECT OVERVIEW
This is a Residential Project: G+4, Construction Stage 2nd Slab work Construction
Build up area 3600 sft. Completion Expected: 6 months.
Picher projet
https://btssoftware.techyzer.com/wp-content/uploads/gravity_forms/1-
88622f767d7504068c954512e31f3a0e/2022/10/16662530509915851433421362397082.jpg
SPECIFIC REQUIERMENTS
Project 17
Email: muthu.yashas@gmail.com
PROJECT OVERVIEW
This is a Residential Project: G+4, Construction Stage 4th Slab work Construction
Build up area 3200 sft, Completion Expected: 3 months.
Picher projet
https://btssoftware.techyzer.com/wp-content/uploads/gravity_forms/1-
88622f767d7504068c954512e31f3a0e/2022/10/IMG20221020135606.jpg
SPECIFIC REQUIERMENTS
Water proofing, S.S Pipes, Pvc Pipes, HDPE Pipes, Pumps & fittings, Sheets,
Flooring Vitrified tiles, Skid Ceramic Tiles, PVC Pipes, Wooden/UPVC Windows,
Security System, Weighing Lift, concrete mixer, Generator, Air Conditioner, Solar
systems, wooden Flooring, Cp& sanitary fittings, Lighting, Electrical Equipments,
Cable Wire, Modular Switches, Water tank, Modular Kitchen, Upvc Windows, Doors,
Curtains, Plywood Boards & Laminates, Glass Work, S.S. Railing, Blinds,
wallpapers, Mattress, Carpet, Upholstery, Pillow/ Blinds, UPS, Home Automation,
CctvCamera, Led Lights, Painting, ETC.
Project plus services 15/11/2022
Project 18
Owner: Mr.Sekhar
Mob:99431 16511
PROJECT OVERVIEW
This is a Residential Project: G+3, Construction Stage 2nd Slab work, Construction
Build up area 3500 Sft. Completion Expected: 4 months.
Picher projet
https://btssoftware.techyzer.com/wp-content/uploads/gravity_forms/1-
88622f767d7504068c954512e31f3a0e/2022/10/IMG20221020141343.jpg
SPECIFIC REQUIERMENTS
Scaffolding, Sand(M.Sand), Jally 20mm, Ready mix concrete(M-20), Cement, Solid
Blocks, Concrete Block(6 inches), TMT, Water proofing, S.S Pipes, Pvc Pipes,
HDPE Pipes, Pumps & fittings, Sheets, Flooring Vitrified tiles, Skid Ceramic Tiles,
PVC Pipes, Wooden/UPVC Windows, Security System, Weighing Lift, Generator, Air
Conditioner, Solar systems, wooden Flooring, Cp& sanitary fittings, Lighting,
Electrical Equipments, Cable Wire, Modular Switches, Water tank, Modular Kitchen,
Curtains, Plywood Boards & Laminates, Glass Work, S.S. Railing, Blinds,
wallpapers, Mattress, Carpet, Upholstery, Pillow/ Blinds, UPS, Home Automation,
CctvCamera, Led Lights, Painting, ETC.
Project plus services 15/11/2022
Project 19
Email: sales@mvprojects.co.in
Ravi Kumar,
mob: 9844006157
PROJECT OVERVIEW
This is an Aprtment Project: G+4, Construction Stage Plastering work, Construction
Build up area 6000 sft. Completion Expected: 1 month.
Picher projet
https://btssoftware.techyzer.com/wp-content/uploads/gravity_forms/1-
88622f767d7504068c954512e31f3a0e/2022/10/IMG20221020142150.jpg
SPECIFIC REQUIERMENTS
Generator, Water proofing, S.S Pipes, CR Pipes, HDPE Pipes, Pumps & fittings,
Sheets, TMT Bars, Bright Bars, Flooring Vitrified tiles, Marble & Granites, Skid
Ceramic Tiles, PVC Pipes, Lifts, UPVC Windows, Fire Fighting, Security System,
Weight Trollies, Elevator, transformer, Air Conditioner, Fire Fighting Eqpments,
Security, Landscape Gardening, well equipped Gymnasium, Solar systems,
Wooden Flooring, Modular Kitchen, Cp & sanitary fittings, Sewage Treatment Plant,
Water softening plant, water Harvesting System, Lighting,ETC.
Project plus services 15/11/2022
Project 20
Mob: 9342864545
PROJECT OVERVIEW
This is a Residential Project: G+5, Construction Stage 2nd Slab work, Construction
Build up area 5000 Sft. Completion Expected: 8 months.
Picher projet
https://btssoftware.techyzer.com/wp-content/uploads/gravity_forms/1-
88622f767d7504068c954512e31f3a0e/2022/10/IMG20221020141313.jpg
SPECIFIC REQUIERMENTS
Scaffolding, Sand(M.Sand), Jally 20mm, Ready mix concrete(M-20), Cement, Solid
Blocks, Concrete Block(6 inches), TMT, Water proofing, S.S Pipes, Pvc Pipes,
HDPE Pipes, Pumps & fittings, Sheets, Flooring Vitrified tiles, Skid Ceramic Tiles,
PVC Pipes, Wooden/UPVC Windows, Security System, Weighing Lift, Generator, Air
Conditioner, Solar systems, wooden Flooring, Cp& sanitary fittings, Lighting,
Electrical Equipments, Cable Wire, Modular Switches, Water tank, Modular Kitchen,
Curtains, Plywood Boards & Laminates, Glass Work, S.S. Railing, Blinds,
wallpapers, Mattress, Carpet, Upholstery, Pillow/ Blinds, UPS, Home Automation,
CctvCamera, Led Lights, Painting, ETC.
Project plus services 15/11/2022
Project 21
Email: swaroopdayal29@gmail.com
PROJECT OVERVIEW
This is a Residential Project: G+3, Construction Stage 3rd Slab & Plastering work,
Construction Build up area 4000 sft. Completion Expected: 2 months.
Picher project
https://btssoftware.techyzer.com/wp-content/uploads/gravity_forms/1-
88622f767d7504068c954512e31f3a0e/2022/10/IMG20221020144200.jpg
SPECIFIC REQUIERMENTS
Scaffolding, Sand(M.Sand), Jally 20mm, Cement, Solid Blocks, Concrete Block(6
inches), TMT, Water proofing, S.S Pipes, Pvc Pipes, HDPE Pipes, Pumps & fittings,
Sheets, Flooring Vitrified tiles, Skid Ceramic Tiles, PVC Pipes, Wooden/UPVC
Windows, Security System, Weighing Lift, Generator, Air Conditioner, Solar
systems, wooden Flooring, Cp& sanitary fittings, Lighting, Electrical Equipments,
Cable Wire, Modular Switches, Water tank, Modular Kitchen, Curtains, Plywood
Boards & Laminates, Glass Work, S.S. Railing, Blinds, wallpapers, Mattress,
Carpet, Upholstery, Pillow/ Blinds, UPS, Home Automation, CctvCamera, Led Lights,
Project plus services 15/11/2022
Painting, ETC.
Project 22
PROJECT OVERVIEW
This is a Residential Project: G+3, Construction Stage Plastering work Construction
Build up area 3000 sft, Completion Expected: 2 months.
Picher projet
https://btssoftware.techyzer.com/wp-content/uploads/gravity_forms/1-
88622f767d7504068c954512e31f3a0e/2022/10/IMG20221020150504.jpg
SPECIFIC REQUIERMENTS
Water proofing, S.S Pipes, Pvc Pipes, HDPE Pipes, Pumps & fittings, Sheets,
Flooring Vitrified tiles, Skid Ceramic Tiles, PVC Pipes, Wooden/UPVC Windows,
Security System, Weighing Lift, concrete mixer, Generator, Air Conditioner, Solar
systems, wooden Flooring, Cp& sanitary fittings, Lighting, Electrical Equipments,
Cable Wire, Modular Switches, Water tank, Modular Kitchen, Upvc Windows, Doors,
Curtains, Plywood Boards & Laminates, Glass Work, S.S. Railing, Blinds,
wallpapers, Mattress, Carpet, Upholstery, Pillow/ Blinds, UPS, Home Automation,
CctvCamera, Led Lights, Painting, ETC.
Project plus services 15/11/2022
Project 23
PROJECT OVERVIEW
This is a Residential Project: G+4, Construction Stage 4th Slab & Plastering work,
Construction Build up area 3600 Sft. Completion Expected: 3 months.
Picher projet
https://btssoftware.techyzer.com/wp-content/uploads/gravity_forms/1-
88622f767d7504068c954512e31f3a0e/2022/10/IMG202210201505041.jpg
SPECIFIC REQUIERMENTS
Water proofing, S.S Pipes, Pvc Pipes, HDPE Pipes, Pumps & fittings, Sheets,
Flooring Vitrified tiles, Skid Ceramic Tiles, PVC Pipes, Wooden/UPVC Windows,
Security System, Weighing Lift, concrete mixer, Generator, Air Conditioner, Solar
systems, wooden Flooring, Cp& sanitary fittings, Lighting, Electrical Equipments,
Cable Wire, Modular Switches, Water tank, Modular Kitchen, Upvc Windows, Doors,
Curtains, Plywood Boards & Laminates, Glass Work, S.S. Railing, Blinds,
wallpapers, Mattress, Carpet, Upholstery, Pillow/ Blinds, UPS, Home Automation,
CctvCamera, Led Lights, Painting, ETC.
Project plus services 15/11/2022
Project 24
Ph: 7090005600
PROJECT OVERVIEW
This is an Apartment Project: G+5, Construction Stage 4th Slab work, Construction
Build up area 5000 sft. Completion Expected: 4 months
Picher projet
https://btssoftware.techyzer.com/wp-content/uploads/gravity_forms/1-
88622f767d7504068c954512e31f3a0e/2022/10/IMG20221020152149.jpg
SPECIFIC REQUIERMENTS
Water proofing, S.S Pipes, Pvc Pipes, HDPE Pipes, Pumps & fittings, Sheets,
Flooring Vitrified tiles, Skid Ceramic Tiles, PVC Pipes, Wooden/UPVC Windows,
Security System, Weighing Lift, Generator, Air Conditioner, Solar systems, wooden
Flooring, Cp& sanitary fittings, Lighting, Electrical Equipments, Cable Wire, Modular
Switches, Water tank, Modular Kitchen, Curtains, Plywood Boards & Laminates,
Glass Work, S.S. Railing, Blinds, wallpapers, Mattress, Carpet, Upholstery, Pillow/
Blinds, UPS, Home Automation, CctvCamera, Led Lights, Painting, ETC.
Project plus services 15/11/2022
Project 25
Mob: 9886145770
Email: srinivasululaxmi@gmail.com
PROJECT OVERVIEW
This is a Residential Project: G+1, Construction Stage 1st Slab work, Construction
Build up area 1800 Sft. Completion Expected: 3 months.
Picher projet
https://btssoftware.techyzer.com/wp-content/uploads/gravity_forms/1-
88622f767d7504068c954512e31f3a0e/2022/10/IMG20221020154655.jpg
SPECIFIC REQUIERMENTS
Sand(M.Sand), Jally 20mm, Cement, Solid Blocks, Concrete Block(6 inches), TMT,
Water proofing, S.S Pipes, Pvc Pipes, HDPE Pipes, Pumps & fittings, Sheets,
Flooring Vitrified tiles, Skid Ceramic Tiles, PVC Pipes, Wooden/UPVC Windows,
Security System, Weighing Lift, Generator, Air Conditioner, Solar systems, wooden
Flooring, Cp& sanitary fittings, Lighting, Electrical Equipments, Cable Wire, Modular
Switches, Water tank, Modular Kitchen, Curtains, Plywood Boards & Laminates,
Glass Work, S.S. Railing, Blinds, wallpapers, Mattress, Carpet, Upholstery, Pillow/
Blinds, UPS, Home Automation, CctvCamera, Led Lights, Painting, ETC.