ITEM/S DESCRIPTION OF WORKS QTY UNIT UNIT COST UNIT COST TOTAL
LABOR MATERIALS
A GENERAL REQUIREMENTS
1 MOBILIZATION AND DEMOBILIZATION 1.00 LOT 2,500.00 2,500.00
TEMFACIL - TEMPORARY FACILITY ( OWNERS APPROVAL IF STAY-IN
2) -
3 TEMPORARY POWER AND WATER CONSUMPTION ( BY OWNER) -
A. SITE PREPARATION -
1 DEMOLITION OF EXISTING WALL AT KITCHEN AREA 1.00 LOT 3,200.00 3,200.00
2 HAULING OF DEBRIS 1.00 LOT 5,000.00 5,000.00
3 EXCAVATION WORKS 1.00 LOT 3,000.00 3,000.00
4 BACKFILL WORKS 1.00 LOT 3,000.00 3,000.00
5 SOIL POISONING 1.00 LOT 500.00 1,100.00 1,600.00
B. _REBAR WORKS -
_ FOOTING 12.43 KGS 18.00 65.00 1,031.86
_FOOTING TIE BEAM
_COLUMN GF 31.97 KGS 18.00 65.00 2,653.34
_BEAM
_SLAB ON GRADE SERVICE AREA 30.80 KGS 18.00 65.00 2,556.40
C. FORMWORKS -
_ FOOTING 1.00 LOT 300.00 382.47 682.47
_FOOTING TIE BEAM
_COLUMN GF
_BEAM 1.00 LOT 1,575.00 1,613.55 3,188.55
_SLAB ON GRADE SERVICE AREA -
D. CONCRETING WORKS -
_ FOOTING 1.00 LOT 650.00 576.00 1,226.00
_FOOTING TIE BEAM
_COLUMN GF 1.00 LOT 350.00 1,080.00 1,430.00
_BEAM
_SLAB ON GRADE SERVICE AREA 1.00 LOT 350.00 2,478.60 2,828.60
E. MASONRY WORKS -
1 CHB LAYING 19.00 SQM 280.00 750.00 19,570.00
2 PLASTERING INTERIOR 23.00 SQM 250.00 300.00 12,650.00
F. ROOFING
TILE WORKS
ITEM/S DESCRIPTION OF WORKS QTY UNIT UNIT COST UNIT COST TOTAL
LABOR MATERIALS
1 GF FLOORING 28.48 SQM 375.00 1,350.00 49,126.28
2 2F FLOORING 18.37 SQM 375.00 1,350.00 31,688.25
3 STAIRS 1.00 LOT 5,900.00 1,350.00 7,250.00
TOTAL AMOUNT 88,064.53
PAINTING WORKS
ITEM/S DESCRIPTION OF WORKS QTY UNIT UNIT COST UNIT COST TOTAL
LABOR MATERIALS
12 INTERIOR WALL GF
LOT
13 INTERIOR WALL GF 1.00 10,000.00 15,000.00 25,000.00
18 CEILING SERVICE AREA 1.00 LOT 4,000.00 4,500.00 8,500.00
22 STAIRS 1.00 LOT 2,900.00 2,000.00 4,900.00
TOTAL AMOUNT 38,400.00
2 SUPPLY AND INSTALL KITCHEN ORGANIZER SPOON,PORK, ETC 1.00 SET/S 100.00 850.00 950.00
SUPPLY AND INSTALL KITCHEN ORGANIZER FOR PLATES WITH
3 HYDRO ROLLER 2.00 SET/S 350.00 2,300.00 5,300.00
SUPPLY AND INSTALL GRANITE COUNTER TOP FOR KITCHEN AND
4 BAR COUNTER 3.00 SQM 1,100.00 5,200.00 18,900.00
97,700.00 TOTAL AMOUNT
PROJECT: FELICIA UNIT FIT OUT WORKS OWNER: _________________
LOCATION: MICARA ESTATE SAHUD ULAN TANZA DATE: ____________________
PREPARED BY:
MODE OF PAYMENT
40% DOWN PAYMENT - ACCOUNT DETAILS:
1ST PAYMENT 20% - SECURITY BANK
2ND PAYMENT 20% - 00000 166 35768
3RD PAYMENT 20% - MARCO RABO
-