Professional Documents
Culture Documents
bce203035 afm final
bce203035 afm final
bce203035 afm final
PROJECT 2
Given Data
Reg no 35
Penstock pipe dia 4 ft But d in inch is 48
f 0.025 unit weight (Y) lb/ft^3 62.4
L 2500 ft Density(H2O) (ρ)lb/ft^3 1.94
Gravitational
Reservoir elevation 2635 ft 32.2
accelaration m/s^-2
Lake depth 10 ft
Width 55 ft
Downstrem depth 5 ft
No of poles (N) 20
Cycles 60 cycle
Wheel diameter 116 inch
Bucket angle 165 degree
2
Head loss nozzle 0.04Vj /2g
A1 550 ft^2
A2 275 ft^2
Solution:( Part 1 )
V 1 2 /2g+z 1 =V 2 2 /2g+z 2
V 1 2 /2g+10=V 2 2 /2g+5 Eq (v )
Solution: ( Part 2 )
We get:
2635 = V 2 2 /2g (1.04+15.625D 4 /256)
Solution: PART ( 3 )
EFFICIENCY OF THE TURBINE
GIVEN:
OPTIMUM DIA OF JET (in) 20
Equation of continuity
A1V1=A2V2
V2 5.76V1 put in eq 1
V1 58.243 ft/s
V2 335.47968 ft/s
Finding discharge
Q = A 1 V 1 730.94965 ft^3/s
Solution: PART ( 4 )
EFFICIENCY OF THE TURBINE
WHEN RESERVOIR IS HALF THEN
OPTIMUM DIA OF JET (in) 20
initial head ft 2635
Using energy equation: Conditional head ft 1317.5
2 2 2
h 1 - fL/D x V 1 /2g - 0.04 V 2 /2g = V 2 /2g
Equation of continuity
A1V1=A2V2
V2 5.76V1 put in eq 1
V1 41.16 ft/s
V2 237.0816 ft/s
Finding discharge
Adjustment
Equation of continuity
A1V1=A2V2
V2 6.3V1 put in eq 1
V1 41.16 ft/s
V2 259.308 ft/s
Finding discharge
Graph 1 Power
max
at 20
10
20
1
2
3
4
5
6
7
8
9
11
12
13
14
15
16
17
18
19
22
23
24
25