Professional Documents
Culture Documents
FOR HAJIYA AT JANBULO 3RD GATE
FOR HAJIYA AT JANBULO 3RD GATE
FOR HAJIYA AT JANBULO 3RD GATE
SUBSTRUCTURE WORKS
H Iron bar for links (stirrups) of size 8mm 30 Nos 5800 174,000.00
Y8@500c/c
N 2 by 2 55,000.00
LABOUR 450,000.00
Paid: N5,000,000.00
N5,000,000 – N3,219,000.00
Balance: N1,781,000.00