FOR HAJIYA AT JANBULO 3RD GATE

SUBSTRUCTURE WORKS

S/NO DESCRIPTION (materials) QTY UNIT RATE AMOUNT

A Demolition of Structure - - 250000 250,000.00

B Cement 70 Bag 7500 525,000.00

C Sharp Sand HOWO 2 Trips 1100000 220,000.00

D Plaster Sand HOWO 1 Trips 70000 70,000.00

E Stones 10 Trips 30000 300,000.00

F Plank 25x300x3300mm long 40 Nos 3750 140,000.00

G Iron bar of size 16mm for 25 Nos 16200 405,000.00


basket…10Y12@200c/c

H Iron bar for links (stirrups) of size 8mm 30 Nos 5800 174,000.00

Y8@500c/c

I 225x225xx450mm (9”) Blocks 1500. Nos 370 555,000.00

J Nails 3 inches - - 15000 15,000.00

K Water - - 10000 25,000.00

M Bending Way 35,0000.00

N 2 by 2 55,000.00

LABOUR 450,000.00

SUBSTRUCTURE WORKS CARRIED TO


SUMMARY N3,219,000.00

Paid: N5,000,000.00

N5,000,000 – N3,219,000.00

Balance: N1,781,000.00