Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

2 - 16mm Ø

Interaction Diagram
4 - 16mm Ø 1,400.00

h
FORCE TRANSFER GUIDE FROM STAAD RESULT OR EQUIVALENT SOFTWARE 1,200.00
Mz (Staad) = Mux = 25 < 118.57 Pass! , ex =125 mm
My (Staad) = Muy = 7 < 44.07 Pass! , ey =35 mm
1,000.00
ØPnx = 948.56 > 200 Pass! > 948.6
ØPny = 1259.14 > 200 Pass! < 1259.1
, ex = 125.0 mm 800.00 1
Col Height, H = 3 Floor to Beam Bottom , ey = 35.0 mm 1 1
Length factor, K = 0.5 Refer (Sheet 2) 44.1 600.00 0 FALSE 0
< 0 FALSE 1
Column Slenderness (Unbraced Column, KL/r ≤ 22), 406.2.5 0 #N/A 1
400.00
KL/rx = 10 < 22 Ok! 10.00 < 22 4
KL/ry = 20 < 22 Ok! 20.00 < 22
118.6 200.00 275.00
275.00 Actual Load -1.00 -110.58 275.00 Tension
Dimension Limits, 418.7.2.1 -8.70 -8.70 -1.00 3.50 -8.70 140Tension
250 mm 250 Ok! -8.70 -8.70 -1.00 0.00 -8.70 140Tension
-
Ratio Limit 0.4 0.50 Ok! r 257.61 257.61 1.00 103.59 257.61 280
Compression
0 50 100 150 200 250
10 275.00 523.91 1.00 110.58 275.00 420
Compression
Main reinforcement Ratio Ast = 1608.5 20 325.9
0.01Ag < Ast > 0.06Ag Ok! 123391.50 275.00 400.00 -1.00 -110.58 275.00 T
1233.915046 7403.49 -95.65 -95.65 -1.00 38.46 -95.65 140 T
Traverse Reinforcements, 418.7.5.4 1608.50 h 99.8 -95.65 -95.65 -1.00 0.00 -95.65 140 T
No of Leg Req, h = 3 Increase Leg! b 91.1 208.70 208.70 1.00 0.00 0.00 280 C
No of Leg Req, b = 2 Ok! 347.4738041 275.00 513.04 1.00 0.00 0.00 420 C
347.4738041 342.7
Main Bar Spacing, 25 < S > 150mm 250 347.4738041 203.26 203.26 -1.00 -81.74 203.26 Tension
h side spacing = 118.667 Okay! At Lo only Vc = 99.83 41.21 41.21 1.00 0.00 0.00 Compression
b side spacing = 138 Okay! At Lo only 99.83 460.0 157.1 460 41.21 41.21 1.00 0.00 0.00 Compression
91.15 210.0 157.1 157.1 275.00 285.68 1.00 0.00 0.00 Compression
Side = h m With Seismic Provision, NSCP 2015 Sec 418.7.5 275.00 530.15 1.00 0.00 0.00 Compression
H Col mark Vu Vs Smax Seismic req QTY DIST
0 - 0.05m 39 (47.83) 250.00 50 1 50 Pass!
Lo
0.05 - 0.5m 39 (47.83) 250.00 60 10 60 Pass! Sh, Satisfy the Length "Lo" with the Qty of Lat ties
Mid > 0.5m 39 (47.83) 250.00 100 Rest 100 Pass! Sx
Vs = (Vu/Ø) - Vc First lat ties Min of 50mm from Face of Support
S = Av fyt d / Vs

2
4 2 0
787.5 2-2 4-2 0.5 0.45 0.6
6 AA TR 0.5 0.05 62.5
Ach 96600 Kf 0.72 1 2-2 AA 2-2 RR 0.5 0.5 96
bch 410 Kn 1.5 2-3 AB 2-3 RS 0.45 150
bcb 160 2-4 AC 2-4 RT 216.7
131.25 2-5 AD 2-5 RU
1 0.008053 3-2 BA 3-2 SR
2 0.008217 3-3 BB 3-3 SS
3 0.002701 3-4 BC 3-4 ST
78.53982 0.008217 ####### 3-5 BD 3-5 SU
0.008217 4-2 CA 4-2 TR
Ash 202 2.573826 3 4-3 CB 4-3 TS
Asb 79 1.00442 2 4-4 CC 4-4 TT
4-5 CD 4-5 TU
5-2 DA 5-2 UR
5-3 DB 5-3 US
5-4 DC 5-4 UT
5-5 DD 5-5 UU
2-2h AAH
2-3h ABH
2-4h ACH
2-5h ADH

You might also like