ETAP

Project: 6MW Newton PV Farm-2 12.6.0H Date: 06-28-2019


Location: Freetown/Sierra Leone SN:
Contract: Revision: Base
Engineer: PD&P Energy Study Case: HA Config.: Normal

Project File: D:\Pr\EV_\Tkl\Grid\SiaroLeoune Grid Impact and PV plant\Received Data\Freetown\ETAP 1260\Freetown\Freetown


Output Report: Untitled

HARMONIC LOAD FLOW ANALYSIS


Spectrum

Bus180 ( 0,80 kV ) Bus191 ( 0,80 kV )

2,5

2,0
Voltage Spectrum (%)

1,5

1,0

0,5

0
0 2 4 6 8 10 12 14 16
Harmonic Order