ETAP

Project: Rachid Karame 5MW PV Plant Page: 1


12.6.0H
Location: Tripoly/Lebanon Date: 21-09-2017
Contract: SN:
Engineer: PD&P Energy Revision: Base
Study Case: LF
Filename: PV Plant Lebanon Config.: Normal

Branch Losses Summary Report

Vd
CKT / Branch From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop
ID MW Mvar MW Mvar kW kvar From To in Vmag

T1 BAHSAS 20.869 9.933 -20.848 -8.979 21.2 953.6 100.0 98.2 1.79

T2 BAHSAS 33.666 16.555 -33.610 -14.042 55.8 2512.8 100.0 97.1 2.91

Cable59 -4.471 0.232 4.510 -0.209 38.2 22.9 98.2 99.0 0.81

T10 0.000 0.000 0.000 0.000 98.2 98.2 0.00

T12 0.000 0.000 0.000 0.000 97.1 97.1 0.00

Cable1 -0.050 0.000 0.050 0.000 0.4 0.0 102.3 103.1 0.80

Cable6 -0.050 0.000 0.050 0.000 0.4 0.0 102.3 103.1 0.80

Cable7 -0.050 0.000 0.050 0.000 0.4 0.0 102.3 103.1 0.80

Cable8 -0.050 0.000 0.050 0.000 0.4 0.0 102.3 103.1 0.80

Cable9 -0.050 0.000 0.050 0.000 0.4 0.0 102.3 103.1 0.80

Cable17 0.248 0.000 -0.244 0.002 4.4 1.4 102.3 100.5 1.80

Cable18 0.050 0.000 -0.050 0.000 0.4 0.0 103.1 102.3 0.80

Cable19 0.050 0.000 -0.050 0.000 0.4 0.0 103.1 102.3 0.80

Cable20 0.050 0.000 -0.050 0.000 0.4 0.0 103.1 102.3 0.80

Cable21 0.050 0.000 -0.050 0.000 0.4 0.0 103.1 102.3 0.80

Cable16 0.248 0.000 -0.244 0.002 4.4 1.4 102.3 100.5 1.80

Cable22 -0.050 0.000 0.050 0.000 0.4 0.0 102.3 103.1 0.80

Cable23 0.050 0.000 -0.050 0.000 0.4 0.0 103.1 102.3 0.80

Cable24 0.050 0.000 -0.050 0.000 0.4 0.0 103.1 102.3 0.80

Cable25 0.050 0.000 -0.050 0.000 0.4 0.0 103.1 102.3 0.80

Cable26 0.050 0.000 -0.050 0.000 0.4 0.0 103.1 102.3 0.80

Cable14 0.248 0.000 -0.244 0.002 4.4 1.4 102.3 100.5 1.80

Cable27 -0.050 0.000 0.050 0.000 0.4 0.0 102.3 103.1 0.80

Cable28 0.050 0.000 -0.050 0.000 0.4 0.0 102.8 102.0 0.81

Cable29 0.050 0.000 -0.050 0.000 0.4 0.0 102.8 102.0 0.81

Cable30 0.050 0.000 -0.050 0.000 0.4 0.0 102.8 102.0 0.81

Cable31 0.050 0.000 -0.050 0.000 0.4 0.0 102.8 102.0 0.81

Cable45 0.198 0.000 -0.196 0.001 2.8 0.9 102.0 100.5 1.45

Cable51 -0.923 0.009 0.927 -0.006 3.7 2.9 100.1 100.5 0.40

T1 0.923 -0.009 -0.914 0.041 9.3 32.7 100.1 99.2 0.92

Cable53 0.914 -0.041 -0.914 0.041 0.0 0.0 99.2 99.2 0.00

Cable85 0.050 0.000 -0.050 0.000 0.4 0.0 102.8 102.0 0.81

Cable86 0.050 0.000 -0.050 0.000 0.4 0.0 102.8 102.0 0.81

Cable87 0.050 0.000 -0.050 0.000 0.4 0.0 102.8 102.0 0.81

Cable88 0.050 0.000 -0.050 0.000 0.4 0.0 102.8 102.0 0.81
ETAP
Project: Rachid Karame 5MW PV Plant Page: 2
12.6.0H
Location: Tripoly/Lebanon Date: 21-09-2017
Contract: SN:
Engineer: PD&P Energy Revision: Base
Study Case: LF
Filename: PV Plant Lebanon Config.: Normal

Vd
CKT / Branch From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop
ID MW Mvar MW Mvar kW kvar From To in Vmag

Cable37 0.198 0.000 -0.196 0.001 2.8 0.9 102.0 100.6 1.45

Cable80 0.050 0.000 -0.050 0.000 0.4 0.0 103.2 102.4 0.80

Cable82 0.050 0.000 -0.050 0.000 0.4 0.0 103.2 102.4 0.80

Cable81 0.050 0.000 -0.050 0.000 0.4 0.0 103.2 102.4 0.80

Cable83 0.050 0.000 -0.050 0.000 0.4 0.0 103.2 102.4 0.80

Cable84 0.050 0.000 -0.050 0.000 0.4 0.0 103.2 102.4 0.80

Cable39 0.248 0.000 -0.244 0.002 4.4 1.4 102.4 100.6 1.80

Cable75 0.050 0.000 -0.050 0.000 0.4 0.0 103.2 102.4 0.80

Cable77 0.050 0.000 -0.050 0.000 0.4 0.0 103.2 102.4 0.80

Cable78 0.050 0.000 -0.050 0.000 0.4 0.0 103.2 102.4 0.80

Cable79 0.050 0.000 -0.050 0.000 0.4 0.0 103.2 102.4 0.80

Cable76 0.050 0.000 -0.050 0.000 0.4 0.0 103.2 102.4 0.80

Cable38 0.248 0.000 -0.244 0.002 4.4 1.4 102.4 100.6 1.80

Cable70 0.050 0.000 -0.050 0.000 0.4 0.0 103.2 102.4 0.80

Cable71 0.050 0.000 -0.050 0.000 0.4 0.0 103.2 102.4 0.80

Cable72 0.050 0.000 -0.050 0.000 0.4 0.0 103.2 102.4 0.80

Cable73 0.050 0.000 -0.050 0.000 0.4 0.0 103.2 102.4 0.80

Cable74 0.050 0.000 -0.050 0.000 0.4 0.0 103.2 102.4 0.80

Cable36 0.248 0.000 -0.244 0.002 4.4 1.4 102.4 100.6 1.80

Cable12 -0.923 0.009 0.927 -0.006 3.7 2.9 100.2 100.6 0.40

T2 0.923 -0.009 -0.914 0.041 9.3 32.7 100.2 99.2 0.92

Cable195 0.914 -0.041 -0.914 0.041 0.0 0.0 99.2 99.2 0.00

Cable123 0.050 0.000 -0.050 0.000 0.4 0.0 102.8 102.0 0.81

Cable124 0.050 0.000 -0.050 0.000 0.4 0.0 102.8 102.0 0.81

Cable125 0.050 0.000 -0.050 0.000 0.4 0.0 102.8 102.0 0.81

Cable126 0.050 0.000 -0.050 0.000 0.4 0.0 102.8 102.0 0.81

Cable41 0.198 0.000 -0.196 0.001 2.8 0.9 102.0 100.6 1.45

Cable118 0.050 0.000 -0.050 0.000 0.4 0.0 103.2 102.4 0.80

Cable120 0.050 0.000 -0.050 0.000 0.4 0.0 103.2 102.4 0.80

Cable119 0.050 0.000 -0.050 0.000 0.4 0.0 103.2 102.4 0.80

Cable121 0.050 0.000 -0.050 0.000 0.4 0.0 103.2 102.4 0.80

Cable122 0.050 0.000 -0.050 0.000 0.4 0.0 103.2 102.4 0.80

Cable43 0.248 0.000 -0.244 0.002 4.4 1.4 102.4 100.6 1.80

Cable113 0.050 0.000 -0.050 0.000 0.4 0.0 103.2 102.4 0.80

Cable115 0.050 0.000 -0.050 0.000 0.4 0.0 103.2 102.4 0.80

Cable116 0.050 0.000 -0.050 0.000 0.4 0.0 103.2 102.4 0.80

Cable117 0.050 0.000 -0.050 0.000 0.4 0.0 103.2 102.4 0.80
ETAP
Project: Rachid Karame 5MW PV Plant Page: 3
12.6.0H
Location: Tripoly/Lebanon Date: 21-09-2017
Contract: SN:
Engineer: PD&P Energy Revision: Base
Study Case: LF
Filename: PV Plant Lebanon Config.: Normal

Vd
CKT / Branch From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop
ID MW Mvar MW Mvar kW kvar From To in Vmag

Cable114 0.050 0.000 -0.050 0.000 0.4 0.0 103.2 102.4 0.80

Cable42 0.248 0.000 -0.244 0.002 4.4 1.4 102.4 100.6 1.80

Cable108 0.050 0.000 -0.050 0.000 0.4 0.0 103.2 102.4 0.80

Cable109 0.050 0.000 -0.050 0.000 0.4 0.0 103.2 102.4 0.80

Cable110 0.050 0.000 -0.050 0.000 0.4 0.0 103.2 102.4 0.80

Cable111 0.050 0.000 -0.050 0.000 0.4 0.0 103.2 102.4 0.80

Cable112 0.050 0.000 -0.050 0.000 0.4 0.0 103.2 102.4 0.80

Cable40 0.248 0.000 -0.244 0.002 4.4 1.4 102.4 100.6 1.80

Cable13 -0.923 0.009 0.927 -0.006 3.7 2.9 100.2 100.6 0.40

T3 0.923 -0.009 -0.914 0.041 9.3 32.6 100.2 99.3 0.92

Cable220 0.914 -0.041 -0.914 0.041 0.0 0.0 99.3 99.3 0.00

Cable104 0.050 0.000 -0.050 0.000 0.4 0.0 102.9 102.1 0.81

Cable105 0.050 0.000 -0.050 0.000 0.4 0.0 102.9 102.1 0.81

Cable106 0.050 0.000 -0.050 0.000 0.4 0.0 102.9 102.1 0.81

Cable107 0.050 0.000 -0.050 0.000 0.4 0.0 102.9 102.1 0.81

Cable46 0.198 0.000 -0.196 0.001 2.8 0.9 102.1 100.6 1.45

Cable99 0.050 0.000 -0.050 0.000 0.4 0.0 103.2 102.4 0.80

Cable101 0.050 0.000 -0.050 0.000 0.4 0.0 103.2 102.4 0.80

Cable100 0.050 0.000 -0.050 0.000 0.4 0.0 103.2 102.4 0.80

Cable102 0.050 0.000 -0.050 0.000 0.4 0.0 103.2 102.4 0.80

Cable103 0.050 0.000 -0.050 0.000 0.4 0.0 103.2 102.4 0.80

Cable48 0.248 0.000 -0.244 0.002 4.4 1.4 102.4 100.6 1.80

Cable94 0.050 0.000 -0.050 0.000 0.4 0.0 103.2 102.4 0.80

Cable96 0.050 0.000 -0.050 0.000 0.4 0.0 103.2 102.4 0.80

Cable97 0.050 0.000 -0.050 0.000 0.4 0.0 103.2 102.4 0.80

Cable98 0.050 0.000 -0.050 0.000 0.4 0.0 103.2 102.4 0.80

Cable95 0.050 0.000 -0.050 0.000 0.4 0.0 103.2 102.4 0.80

Cable47 0.248 0.000 -0.244 0.002 4.4 1.4 102.4 100.6 1.80

Cable89 0.050 0.000 -0.050 0.000 0.4 0.0 103.2 102.4 0.80

Cable90 0.050 0.000 -0.050 0.000 0.4 0.0 103.2 102.4 0.80

Cable91 0.050 0.000 -0.050 0.000 0.4 0.0 103.2 102.4 0.80

Cable92 0.050 0.000 -0.050 0.000 0.4 0.0 103.2 102.4 0.80

Cable93 0.050 0.000 -0.050 0.000 0.4 0.0 103.2 102.4 0.80

Cable44 0.248 0.000 -0.244 0.002 4.4 1.4 102.4 100.6 1.80

Cable15 -0.923 0.009 0.927 -0.006 3.7 2.9 100.2 100.6 0.40

T4 0.923 -0.009 -0.914 0.041 9.3 32.6 100.2 99.3 0.92

Cable245 0.914 -0.041 -0.914 0.041 0.0 0.0 99.3 99.3 0.00
ETAP
Project: Rachid Karame 5MW PV Plant Page: 4
12.6.0H
Location: Tripoly/Lebanon Date: 21-09-2017
Contract: SN:
Engineer: PD&P Energy Revision: Base
Study Case: LF
Filename: PV Plant Lebanon Config.: Normal

Vd
CKT / Branch From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop
ID MW Mvar MW Mvar kW kvar From To in Vmag

Cable142 0.050 0.000 -0.050 0.000 0.4 0.0 102.5 101.7 0.81

Cable143 0.050 0.000 -0.050 0.000 0.4 0.0 102.5 101.7 0.81

Cable144 0.050 0.000 -0.050 0.000 0.4 0.0 102.5 101.7 0.81

Cable50 0.149 0.000 -0.147 0.001 1.6 0.5 101.7 100.6 1.09

Cable137 0.050 0.000 -0.050 0.000 0.4 0.0 103.2 102.4 0.80

Cable139 0.050 0.000 -0.050 0.000 0.4 0.0 103.2 102.4 0.80

Cable138 0.050 0.000 -0.050 0.000 0.4 0.0 103.2 102.4 0.80

Cable140 0.050 0.000 -0.050 0.000 0.4 0.0 103.2 102.4 0.80

Cable141 0.050 0.000 -0.050 0.000 0.4 0.0 103.2 102.4 0.80

Cable54 0.248 0.000 -0.244 0.002 4.4 1.4 102.4 100.6 1.80

Cable132 0.050 0.000 -0.050 0.000 0.4 0.0 103.2 102.4 0.80

Cable134 0.050 0.000 -0.050 0.000 0.4 0.0 103.2 102.4 0.80

Cable135 0.050 0.000 -0.050 0.000 0.4 0.0 103.2 102.4 0.80

Cable136 0.050 0.000 -0.050 0.000 0.4 0.0 103.2 102.4 0.80

Cable133 0.050 0.000 -0.050 0.000 0.4 0.0 103.2 102.4 0.80

Cable52 0.248 0.000 -0.244 0.002 4.4 1.4 102.4 100.6 1.80

Cable127 0.050 0.000 -0.050 0.000 0.4 0.0 103.2 102.4 0.80

Cable128 0.050 0.000 -0.050 0.000 0.4 0.0 103.2 102.4 0.80

Cable129 0.050 0.000 -0.050 0.000 0.4 0.0 103.2 102.4 0.80

Cable130 0.050 0.000 -0.050 0.000 0.4 0.0 103.2 102.4 0.80

Cable131 0.050 0.000 -0.050 0.000 0.4 0.0 103.2 102.4 0.80

Cable49 0.248 0.000 -0.244 0.002 4.4 1.4 102.4 100.6 1.80

Cable32 -0.875 0.008 0.878 -0.005 3.3 2.6 100.2 100.6 0.38

T5 0.875 -0.008 -0.867 0.037 8.4 29.3 100.2 99.3 0.87

Cable270 0.867 -0.037 -0.867 0.037 0.0 0.0 99.3 99.3 0.00

Cable55 -4.510 0.209 4.518 -0.205 8.2 4.9 99.0 99.2 0.17

Cable296 -3.604 0.163 3.606 -0.162 1.7 1.0 99.2 99.2 0.05

Cable297 -2.692 0.121 2.693 -0.120 1.0 0.6 99.2 99.3 0.03

Cable298 -1.780 0.079 1.780 -0.079 0.4 0.3 99.3 99.3 0.02

Cable299 -0.866 0.037 0.867 -0.037 0.1 0.1 99.3 99.3 0.01

305.6 3698.8
ETAP
Project: Rachid Karame 5MW PV Plant Page: 5
12.6.0H
Location: Tripoly/Lebanon Date: 21-09-2017
Contract: SN:
Engineer: PD&P Energy Revision: Base
Study Case: LF
Filename: PV Plant Lebanon Config.: Normal