CKT / Branch From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop
ID MW Mvar MW Mvar kW kvar From To in Vmag
T1 BAHSAS 20.869 9.933 -20.848 -8.979 21.2 953.6 100.0 98.2 1.79
T2 BAHSAS 33.666 16.555 -33.610 -14.042 55.8 2512.8 100.0 97.1 2.91
Cable59 -4.471 0.232 4.510 -0.209 38.2 22.9 98.2 99.0 0.81
Cable1 -0.050 0.000 0.050 0.000 0.4 0.0 102.3 103.1 0.80
Cable6 -0.050 0.000 0.050 0.000 0.4 0.0 102.3 103.1 0.80
Cable7 -0.050 0.000 0.050 0.000 0.4 0.0 102.3 103.1 0.80
Cable8 -0.050 0.000 0.050 0.000 0.4 0.0 102.3 103.1 0.80
Cable9 -0.050 0.000 0.050 0.000 0.4 0.0 102.3 103.1 0.80
Cable17 0.248 0.000 -0.244 0.002 4.4 1.4 102.3 100.5 1.80
Cable18 0.050 0.000 -0.050 0.000 0.4 0.0 103.1 102.3 0.80
Cable19 0.050 0.000 -0.050 0.000 0.4 0.0 103.1 102.3 0.80
Cable20 0.050 0.000 -0.050 0.000 0.4 0.0 103.1 102.3 0.80
Cable21 0.050 0.000 -0.050 0.000 0.4 0.0 103.1 102.3 0.80
Cable16 0.248 0.000 -0.244 0.002 4.4 1.4 102.3 100.5 1.80
Cable22 -0.050 0.000 0.050 0.000 0.4 0.0 102.3 103.1 0.80
Cable23 0.050 0.000 -0.050 0.000 0.4 0.0 103.1 102.3 0.80
Cable24 0.050 0.000 -0.050 0.000 0.4 0.0 103.1 102.3 0.80
Cable25 0.050 0.000 -0.050 0.000 0.4 0.0 103.1 102.3 0.80
Cable26 0.050 0.000 -0.050 0.000 0.4 0.0 103.1 102.3 0.80
Cable14 0.248 0.000 -0.244 0.002 4.4 1.4 102.3 100.5 1.80
Cable27 -0.050 0.000 0.050 0.000 0.4 0.0 102.3 103.1 0.80
Cable28 0.050 0.000 -0.050 0.000 0.4 0.0 102.8 102.0 0.81
Cable29 0.050 0.000 -0.050 0.000 0.4 0.0 102.8 102.0 0.81
Cable30 0.050 0.000 -0.050 0.000 0.4 0.0 102.8 102.0 0.81
Cable31 0.050 0.000 -0.050 0.000 0.4 0.0 102.8 102.0 0.81
Cable45 0.198 0.000 -0.196 0.001 2.8 0.9 102.0 100.5 1.45
Cable51 -0.923 0.009 0.927 -0.006 3.7 2.9 100.1 100.5 0.40
Cable53 0.914 -0.041 -0.914 0.041 0.0 0.0 99.2 99.2 0.00
Cable85 0.050 0.000 -0.050 0.000 0.4 0.0 102.8 102.0 0.81
Cable86 0.050 0.000 -0.050 0.000 0.4 0.0 102.8 102.0 0.81
Cable87 0.050 0.000 -0.050 0.000 0.4 0.0 102.8 102.0 0.81
Cable88 0.050 0.000 -0.050 0.000 0.4 0.0 102.8 102.0 0.81
ETAP
Project: Rachid Karame 5MW PV Plant Page: 2
12.6.0H
Location: Tripoly/Lebanon Date: 21-09-2017
Contract: SN:
Engineer: PD&P Energy Revision: Base
Study Case: LF
Filename: PV Plant Lebanon Config.: Normal
Vd
CKT / Branch From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop
ID MW Mvar MW Mvar kW kvar From To in Vmag
Cable37 0.198 0.000 -0.196 0.001 2.8 0.9 102.0 100.6 1.45
Cable80 0.050 0.000 -0.050 0.000 0.4 0.0 103.2 102.4 0.80
Cable82 0.050 0.000 -0.050 0.000 0.4 0.0 103.2 102.4 0.80
Cable81 0.050 0.000 -0.050 0.000 0.4 0.0 103.2 102.4 0.80
Cable83 0.050 0.000 -0.050 0.000 0.4 0.0 103.2 102.4 0.80
Cable84 0.050 0.000 -0.050 0.000 0.4 0.0 103.2 102.4 0.80
Cable39 0.248 0.000 -0.244 0.002 4.4 1.4 102.4 100.6 1.80
Cable75 0.050 0.000 -0.050 0.000 0.4 0.0 103.2 102.4 0.80
Cable77 0.050 0.000 -0.050 0.000 0.4 0.0 103.2 102.4 0.80
Cable78 0.050 0.000 -0.050 0.000 0.4 0.0 103.2 102.4 0.80
Cable79 0.050 0.000 -0.050 0.000 0.4 0.0 103.2 102.4 0.80
Cable76 0.050 0.000 -0.050 0.000 0.4 0.0 103.2 102.4 0.80
Cable38 0.248 0.000 -0.244 0.002 4.4 1.4 102.4 100.6 1.80
Cable70 0.050 0.000 -0.050 0.000 0.4 0.0 103.2 102.4 0.80
Cable71 0.050 0.000 -0.050 0.000 0.4 0.0 103.2 102.4 0.80
Cable72 0.050 0.000 -0.050 0.000 0.4 0.0 103.2 102.4 0.80
Cable73 0.050 0.000 -0.050 0.000 0.4 0.0 103.2 102.4 0.80
Cable74 0.050 0.000 -0.050 0.000 0.4 0.0 103.2 102.4 0.80
Cable36 0.248 0.000 -0.244 0.002 4.4 1.4 102.4 100.6 1.80
Cable12 -0.923 0.009 0.927 -0.006 3.7 2.9 100.2 100.6 0.40
Cable195 0.914 -0.041 -0.914 0.041 0.0 0.0 99.2 99.2 0.00
Cable123 0.050 0.000 -0.050 0.000 0.4 0.0 102.8 102.0 0.81
Cable124 0.050 0.000 -0.050 0.000 0.4 0.0 102.8 102.0 0.81
Cable125 0.050 0.000 -0.050 0.000 0.4 0.0 102.8 102.0 0.81
Cable126 0.050 0.000 -0.050 0.000 0.4 0.0 102.8 102.0 0.81
Cable41 0.198 0.000 -0.196 0.001 2.8 0.9 102.0 100.6 1.45
Cable118 0.050 0.000 -0.050 0.000 0.4 0.0 103.2 102.4 0.80
Cable120 0.050 0.000 -0.050 0.000 0.4 0.0 103.2 102.4 0.80
Cable119 0.050 0.000 -0.050 0.000 0.4 0.0 103.2 102.4 0.80
Cable121 0.050 0.000 -0.050 0.000 0.4 0.0 103.2 102.4 0.80
Cable122 0.050 0.000 -0.050 0.000 0.4 0.0 103.2 102.4 0.80
Cable43 0.248 0.000 -0.244 0.002 4.4 1.4 102.4 100.6 1.80
Cable113 0.050 0.000 -0.050 0.000 0.4 0.0 103.2 102.4 0.80
Cable115 0.050 0.000 -0.050 0.000 0.4 0.0 103.2 102.4 0.80
Cable116 0.050 0.000 -0.050 0.000 0.4 0.0 103.2 102.4 0.80
Cable117 0.050 0.000 -0.050 0.000 0.4 0.0 103.2 102.4 0.80
ETAP
Project: Rachid Karame 5MW PV Plant Page: 3
12.6.0H
Location: Tripoly/Lebanon Date: 21-09-2017
Contract: SN:
Engineer: PD&P Energy Revision: Base
Study Case: LF
Filename: PV Plant Lebanon Config.: Normal
Vd
CKT / Branch From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop
ID MW Mvar MW Mvar kW kvar From To in Vmag
Cable114 0.050 0.000 -0.050 0.000 0.4 0.0 103.2 102.4 0.80
Cable42 0.248 0.000 -0.244 0.002 4.4 1.4 102.4 100.6 1.80
Cable108 0.050 0.000 -0.050 0.000 0.4 0.0 103.2 102.4 0.80
Cable109 0.050 0.000 -0.050 0.000 0.4 0.0 103.2 102.4 0.80
Cable110 0.050 0.000 -0.050 0.000 0.4 0.0 103.2 102.4 0.80
Cable111 0.050 0.000 -0.050 0.000 0.4 0.0 103.2 102.4 0.80
Cable112 0.050 0.000 -0.050 0.000 0.4 0.0 103.2 102.4 0.80
Cable40 0.248 0.000 -0.244 0.002 4.4 1.4 102.4 100.6 1.80
Cable13 -0.923 0.009 0.927 -0.006 3.7 2.9 100.2 100.6 0.40
Cable220 0.914 -0.041 -0.914 0.041 0.0 0.0 99.3 99.3 0.00
Cable104 0.050 0.000 -0.050 0.000 0.4 0.0 102.9 102.1 0.81
Cable105 0.050 0.000 -0.050 0.000 0.4 0.0 102.9 102.1 0.81
Cable106 0.050 0.000 -0.050 0.000 0.4 0.0 102.9 102.1 0.81
Cable107 0.050 0.000 -0.050 0.000 0.4 0.0 102.9 102.1 0.81
Cable46 0.198 0.000 -0.196 0.001 2.8 0.9 102.1 100.6 1.45
Cable99 0.050 0.000 -0.050 0.000 0.4 0.0 103.2 102.4 0.80
Cable101 0.050 0.000 -0.050 0.000 0.4 0.0 103.2 102.4 0.80
Cable100 0.050 0.000 -0.050 0.000 0.4 0.0 103.2 102.4 0.80
Cable102 0.050 0.000 -0.050 0.000 0.4 0.0 103.2 102.4 0.80
Cable103 0.050 0.000 -0.050 0.000 0.4 0.0 103.2 102.4 0.80
Cable48 0.248 0.000 -0.244 0.002 4.4 1.4 102.4 100.6 1.80
Cable94 0.050 0.000 -0.050 0.000 0.4 0.0 103.2 102.4 0.80
Cable96 0.050 0.000 -0.050 0.000 0.4 0.0 103.2 102.4 0.80
Cable97 0.050 0.000 -0.050 0.000 0.4 0.0 103.2 102.4 0.80
Cable98 0.050 0.000 -0.050 0.000 0.4 0.0 103.2 102.4 0.80
Cable95 0.050 0.000 -0.050 0.000 0.4 0.0 103.2 102.4 0.80
Cable47 0.248 0.000 -0.244 0.002 4.4 1.4 102.4 100.6 1.80
Cable89 0.050 0.000 -0.050 0.000 0.4 0.0 103.2 102.4 0.80
Cable90 0.050 0.000 -0.050 0.000 0.4 0.0 103.2 102.4 0.80
Cable91 0.050 0.000 -0.050 0.000 0.4 0.0 103.2 102.4 0.80
Cable92 0.050 0.000 -0.050 0.000 0.4 0.0 103.2 102.4 0.80
Cable93 0.050 0.000 -0.050 0.000 0.4 0.0 103.2 102.4 0.80
Cable44 0.248 0.000 -0.244 0.002 4.4 1.4 102.4 100.6 1.80
Cable15 -0.923 0.009 0.927 -0.006 3.7 2.9 100.2 100.6 0.40
Cable245 0.914 -0.041 -0.914 0.041 0.0 0.0 99.3 99.3 0.00
ETAP
Project: Rachid Karame 5MW PV Plant Page: 4
12.6.0H
Location: Tripoly/Lebanon Date: 21-09-2017
Contract: SN:
Engineer: PD&P Energy Revision: Base
Study Case: LF
Filename: PV Plant Lebanon Config.: Normal
Vd
CKT / Branch From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop
ID MW Mvar MW Mvar kW kvar From To in Vmag
Cable142 0.050 0.000 -0.050 0.000 0.4 0.0 102.5 101.7 0.81
Cable143 0.050 0.000 -0.050 0.000 0.4 0.0 102.5 101.7 0.81
Cable144 0.050 0.000 -0.050 0.000 0.4 0.0 102.5 101.7 0.81
Cable50 0.149 0.000 -0.147 0.001 1.6 0.5 101.7 100.6 1.09
Cable137 0.050 0.000 -0.050 0.000 0.4 0.0 103.2 102.4 0.80
Cable139 0.050 0.000 -0.050 0.000 0.4 0.0 103.2 102.4 0.80
Cable138 0.050 0.000 -0.050 0.000 0.4 0.0 103.2 102.4 0.80
Cable140 0.050 0.000 -0.050 0.000 0.4 0.0 103.2 102.4 0.80
Cable141 0.050 0.000 -0.050 0.000 0.4 0.0 103.2 102.4 0.80
Cable54 0.248 0.000 -0.244 0.002 4.4 1.4 102.4 100.6 1.80
Cable132 0.050 0.000 -0.050 0.000 0.4 0.0 103.2 102.4 0.80
Cable134 0.050 0.000 -0.050 0.000 0.4 0.0 103.2 102.4 0.80
Cable135 0.050 0.000 -0.050 0.000 0.4 0.0 103.2 102.4 0.80
Cable136 0.050 0.000 -0.050 0.000 0.4 0.0 103.2 102.4 0.80
Cable133 0.050 0.000 -0.050 0.000 0.4 0.0 103.2 102.4 0.80
Cable52 0.248 0.000 -0.244 0.002 4.4 1.4 102.4 100.6 1.80
Cable127 0.050 0.000 -0.050 0.000 0.4 0.0 103.2 102.4 0.80
Cable128 0.050 0.000 -0.050 0.000 0.4 0.0 103.2 102.4 0.80
Cable129 0.050 0.000 -0.050 0.000 0.4 0.0 103.2 102.4 0.80
Cable130 0.050 0.000 -0.050 0.000 0.4 0.0 103.2 102.4 0.80
Cable131 0.050 0.000 -0.050 0.000 0.4 0.0 103.2 102.4 0.80
Cable49 0.248 0.000 -0.244 0.002 4.4 1.4 102.4 100.6 1.80
Cable32 -0.875 0.008 0.878 -0.005 3.3 2.6 100.2 100.6 0.38
Cable270 0.867 -0.037 -0.867 0.037 0.0 0.0 99.3 99.3 0.00
Cable55 -4.510 0.209 4.518 -0.205 8.2 4.9 99.0 99.2 0.17
Cable296 -3.604 0.163 3.606 -0.162 1.7 1.0 99.2 99.2 0.05
Cable297 -2.692 0.121 2.693 -0.120 1.0 0.6 99.2 99.3 0.03
Cable298 -1.780 0.079 1.780 -0.079 0.4 0.3 99.3 99.3 0.02
Cable299 -0.866 0.037 0.867 -0.037 0.1 0.1 99.3 99.3 0.01
305.6 3698.8
ETAP
Project: Rachid Karame 5MW PV Plant Page: 5
12.6.0H
Location: Tripoly/Lebanon Date: 21-09-2017
Contract: SN:
Engineer: PD&P Energy Revision: Base
Study Case: LF
Filename: PV Plant Lebanon Config.: Normal