Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

ETAP

Project: Page: 1
Location: 12.6.0H Date: 14-09-2017
Contract: SN:
Engineer: Revision: Base
Study Case: CD
Filename: PV Plant Lebanon Study: Uniform Ampacity

Analysis Results (RW2)


0.00
Conductor Energized Rdc @ Dielectric Conductor
per Conductor Final Temp. Losses Losses Current Temp.
No. Cable ID Conduit/Location ID Cable per Cable µOhm/m Watt/m Yc Ys Watt/m Amp °C

1 Cable300-1A Cond9 1 1 0.20 0.097 1.270 2.712 9.731 4600.11 84.59

2 Cable300-1B Cond7 1 1 0.20


2.00 0.097 1.270 2.705 9.759 4600.11 85.48

3 Cable300-1C Cond8 1 1 0.21


3.00 0.097 1.270 2.666 9.899 4600.11 89.99

4 Cable55-1C Cond4 1 1 0.20


4.00 0.097 1.270 2.699 9.779 4600.11 86.13

5 Cable55-1B Cond5 1 1 0.21


5.00 0.097 1.270 2.666 9.899 4600.11 89.99

6 Cable55-1A Cond6 1 1 0.20


6.00 0.097 1.270 2.703 9.766 4600.11 85.71

Yc = Increment of AC/DC resistance ratio due to AC current skin and proximity effect
Ys = Increment of AC/DC resistance ratio due to losses of circulation and eddy current effect in shield , sheath and armor

You might also like