Spec. No. 3.5.

1
Offshore Engineering ELECTRICAL DESIGN 9
CRITERIA Rev. No.
Services
ISO - 9001:2015 RATNA PROCESS Discipline Electrical
PLATFORM Page 6 of 22

Generator Controls, DC motors for


Emergency lube oil pumps, etc.

6 24 V DC, 2 wire Instrument supply,


Fire & Gas detection system,
CP monitoring panel etc.

7 24/12 V DC, 2 wire Navigational Aids system

8 110/230 V AC , UPS Distributed Control System

9 230 V AC, UPS Telephone Exchange,


CCTV system,
Radio system,
Paging & Intercom system,
Telemetry, telecom and computer
system

3.5.1.1.3.5 Power system Earthing


Power System earthing shall be as given below.
LV (AC) – Neutral solidly grounded.
HV (AC) – Neutral grounded through low resistance.

3.5.1.1.4 Allowances for future / sparing


A sparing allowance of 20% shall be provided for switchboards, terminals,
MCTs, distribution boards and DC supply & UPS system including battery
systems.

3.5.1.2 DESIGN METHODOLOGY

3.5.11.2.1 Electrical Equipment Sizing Methodology

3.5.1.2.1 Electrical Loads - Definitions


The following definitions are applicable for assessment of load.

Brake Power (KW) – Power transmitted along the shaft to the mechanical
equipment
Nominal power – Name plate rating of motors or load absorbed by non-
motor load.
Efficiency (%) – As per vendor data the ratio of output power to input
power complying with IEC Standard 60034-30.