Time Line Cost Perusahaan Pelayaran revised
Time Line Cost Perusahaan Pelayaran revised
1st 2nd 3rd 4th 1st 2nd 3rd 4th 1st 2nd 3rd 4th 1st 2nd 3rd 4th 1st 2nd 3rd 4th 1st 2nd 3rd 4th 1st 2nd 3rd 4th 1st 2nd 3rd 4th 1st 2nd 3rd 4th 1st 2nd 3rd 4th 1st 2nd 3rd 4th 1st 2nd 3rd 4th
Pendirian Perusahaan
Pendaftaran SIUPAL
Negosiasi
Pembangunan Kapal 1 Harga & Pengadaan Material
Contract
Negosiasi
Pembangunan Kapal 2 Harga & Pengadaan Material
Contract
Pembangunan Kapal 3 / 2nd
Handvessel (tentative)
1st 2nd 3rd 4th 1st 2nd 3rd 4th 1st 2nd 3rd 4th 1st 2nd 3rd 4th 1st 2nd 3rd 4th 1st 2nd 3rd 4th 1st 2nd 3rd 4th 1st 2nd 3rd 4th 1st 2nd 3rd 4th 1st 2nd 3rd 4th 1st 2nd 3rd 4th 1st 2nd 3rd 4th 1st 2nd 3rd 4th 1st 2nd 3rd 4th 1st 2nd 3rd
ber November Desember
Month 28th Month 29th Month
Director
Crewing
Port Captain Port Engginer Finance
Crewing
Fleet Ops
Certificate
REFER
HTERA ADHIGUNA
ARPERNI / TERA LOGISTIC
FINANCE &
ACCOUNTING
Crewing / Hr Procurement
Crewing
Finance
Crewing
Ops
REFERENSI
PROFIT - LOSS
Tahun 2024 2025
Cargo Quantity 96,000 96,000
Freight Rate 132,000 132,000
Direct Cost
Docking
Bahan Bakar 2,856,000,000 0.00% 2,856,000,000 0.00%
Ship Management 534,000,000 2.00% 544,680,000.00 2.00%
Maintenance 380,000,000 5.00% 399,000,000.00 5.00%
Sertifikasi 144,500,000 5.00% 151,725,000.00 5.00%
Agency 192,000,000 5.00% 201,600,000.00 5.00%
Passing Muara Teweh 168,000,000 0.00% 168,000,000.00 0.00%
Insurance 114,888,000 5.00% 120,632,400.00 5.00%
Gaji Awak Kapal 830,740,000 3.00% 855,662,200.00 3.00%
Security 312,000,000 3.00% 321,360,000.00 3.00%
Bonus Awak Kapal 120,000,000 0.00% 120,000,000.00 0.00%
Total Direct Cost 5,652,128,000 5,738,659,600.00
7,019,872,000 6,933,340,400
Net Profit
55% 55%
Opex Kantor
Beban Kepegawaian
Gaji dan upah 900,000,000 0.04 936,000,000.00 4.00%
Pajak 225,000,000 4.00% 234,000,000.00 4.00%
Bonus & Tunjangan 90,000,000 4.00% 93,600,000.00 4.00%
Lain-Lain 27,000,000 4.00% 28,080,000.00 4.00%
Total Beban Kepegawaian 1,242,000,000 1,291,680,000
1,716,000,000 1,784,640,000
Total Opex
14% 14%
5,303,872,000 5,148,700,400
EBITDA
42% 41%
5,200,672,000 5,045,500,400
EBIT
41% 40%
5,200,672,000 5,045,500,400
EBT
41% 40%
4,056,524,160 3,935,490,312
EAT
32% 31%
1,745,757,310
2,856,000,000 0.00% 2,856,000,000 0.00% 2,856,000,000
555,573,600.00 2.00% 566,685,072.00 2.00% 578,018,773.00
418,950,000.00 5.00% 439,897,500.00 5.00% 461,892,375.00
159,311,250.00 5.00% 167,276,813.00 5.00% 175,640,654.00
211,680,000.00 5.00% 222,264,000.00 5.00% 233,377,200.00
168,000,000.00 0.00% 168,000,000.00 0.00% 168,000,000.00
126,664,020.00 5.00% 132,997,221.00 5.00% 139,647,082.00
881,332,066.00 3.00% 907,772,028.00 3.00% 935,005,189.00
331,000,800.00 3.00% 340,930,824.00 3.00% 351,158,749.00
120,000,000.00 0.00% 120,000,000.00 0.00% 120,000,000.00
5,828,511,736.00 5,921,823,458.00 7,764,497,331.60
103,200,000 103,200,000 -
DOCKING EXPENSES
1 Docking
TOTAL DOCKING
- -
3,000,000 - - -
-
-
2,000,000
- -
2,000,000 2,000,000
- 35,000,000
- 30,000,000 - -
3,500,000
- 6,000,000 - - -
1,500,000
2023 - 2028
1,745,757,310
1,745,757,310
Dec Total
55,100,000 661,200,000
10,000,000 120,000,000
2,500,000 30,000,000
2,500,000 40,000
1,000,000 1,000,000
500,000 500,000
1,500,000 18,000,000
73,100,000 830,740,000
Dec Total
10,000,000 120,000,000
10,000,000 120,000,000
Dec Total
3,500,000 73,500,000
3,500,000 110,500,000
500,000 15,000,000
1,050,000 19,650,000
2,250,000 91,750,000
15,900,000 69,600,000
26,700,000 380,000,000
Dec Total
8,000,000
4,500,000
4,500,000
-
4,500,000
3,000,000
4,500,000
4,500,000
6,000,000
4,000,000
- 6,000,000
6,000,000
- 35,000,000
-
-
-
30,000,000
-
-
3,500,000
- 12,000,000
1,500,000
7,000,000
- 144,500,000
Total
1,745,757,310 1,745,757,310
1,745,757,310 1,745,757,310
Dec Total
238,000,000 2,856,000,000
238,000,000 2,856,000,000
Dec Total
16,000,000 192,000,000
16,000,000 192,000,000
Dec Total
9,574,000 114,888,000
9,574,000 114,888,000
Dec Total
14,000,000 168,000,000
14,000,000 168,000,000
Dec Total
8,600,000 103,200,000
8,600,000 103,200,000
Dec Total
26,000,000 312,000,000
26,000,000 312,000,000
Dec Total
75,000,000 900,000,000
7,500,000 90,000,000
2,250,000 27,000,000
82,500,000 1,017,000,000
Dec Total
10,000,000 120,000,000
25,000,000 300,000,000
3,000,000 36,000,000
1,000,000 12,000,000
500,000 6,000,000
39,000,000 474,000,000
Report GPD
Detail per Category Project
AVERAGE 546,228,600.00
14,674.00
PT.Citra Shipyard
Loa (panjang)
Brearth Moulded (Lebar)
Dimention
Dept Moulded (Tinggi)
Max Draf
ME
Tugboat
AE
Gear Box
Machinery
Propulsion
Speed
Bollard Pull
Loa (panjang)
Brearth Moulded (Lebar)
Dimention
Dept Moulded (Tinggi)
Max Draf
Main deck
Bottom
Barge
Side Shell
Material Tranversal Bulk Head
Longitudinal Bulkhead
Side Board Uper
Side Board Lower
Paint / Anti Fouling Hemppel
TOTAL
240 FEET
PT.Citra Shipyard PT.Karya Tek
23 Meter Loa (panjang)
8 Meter Brearth Moulded (Lebar)
3,65 Meter Dept Moulded (Tinggi)
3 Meter Max Draf
Yanmar 6AYM-WST (2x 659 Hp = 1318 Hp) ME
USD 1,570,000
Weichai 40 Kw / 50kVA (2 Unit) AE
Yanmar YXH-240L (2Unit) Gear Box
2 Open Type Propulsion
9 Knot Speed
12 Ton Bollard Pull
73 Meter Loa (panjang)
18,2 Meter Brearth Moulded (Lebar)
4,8 Meter Dept Moulded (Tinggi)
4,2 Meter Max Draf
12 mm Main deck
12 mm Bottom
USD 1,310,000
12 mm Side Shell
8 mm Tranversal Bulk Head
8 mm Longitudinal Bulkhead
8 mm ; 8 Feet Side Board Uper
10 mm ; 2 Feet Side Board Lower
As per Shipyard standard
TOTAL USD 2,880,000
Rp 42,261,120,000
300
PT.Karya Teknik Utama PT.Karya Te
23.5 Meter Loa (panjang)
7,32 Meter Brearth Moulded (Lebar)
3,2 Meter Dept Moulded (Tinggi)
2,7 Meter Max Draf
Yanmar 6AYM-WST (2x 659 Hp = 1318 Hp) ME
USD 981,447
Yanmar YTG40TLOM 33 Kva (2 Unit) AE
Yanmar YXH-240L (2Unit) Gear Box
2 unit Propulsion
Speed
Bollard Pull
70 Meter Loa (panjang)
21 Meter Brearth Moulded (Lebar)
4,8 Meter Dept Moulded (Tinggi)
4,2 Meter Max Draf
12 mm Main deck
12 mm Bottom
USD 1,358,926
12 mm Side Shell
8 mm Tranversal Bulk Head
8 mm Longitudinal Bulkhead
8 mm ; 8 Feet Side Board Uper
10 mm ; 2 Feet Side Board Lower
As per Shipyard standard
USD 2,340,373
Rp 34,342,636,484
300 FEET
PT.Karya Teknik Utama
27 Meter
8,2 Meter
4 Meter
3 Meter
Mitshubisi S6R2-MTK3L (2 x 1030 Hp = 2060 Hp)
USD 1,430,836
Yanmar YTG75TLV 48 Kw/60Kva (2Unit)
NICO MGN 91 BL (2 Unit)
2 unit
91,4 Meter
25,6 Meter
5,7 Meter
5,2 Meter
14 mm
12 mm
USD 2,108,600
12 mm
9 mm
10 mm
9 mm ; 8 Feet
10 mm ; 2 Feet
USD 3,539,437
Rp 51,937,691,494
SECOND HAND TUG & BARGE
REMARKS