Power System and Battery Acceptance

Manual for ESM-B1

Site ID GKAT352

Site Name Bishankhu

PAT Date 28/04/2023

Power & Battery Model ESM-48100B1

NO. Item Result Remark


T01 Power and signal cable connection item acceptance checklist
Whetherall the signal cables are All the signal cables
connected according to 《 Quick should be connected
Installation Guide》, all the connection is according to 《Quick
firm.The signal cables includeApplicable Installation Guide》, the
for LIB in Power Cube connection should be firm.
1. Communication cable between Li
battery -Com In to Com Out SMU02C’s PowerPlants :-
2.Communication cable(LAN cable) ICC310,ICC210,ICC500,I
between and CAN port of SMU02S CC300,ICC702, ICC350
(only ECC500S controller(if connect Battery Cable to
T01-01 applicable); for all Power cube. Y N MUS01A’ s board COM2.
3.Communication cable between
SMU02C (Fe Port) to ATN/Fe port of SMU02S’s Power Plant
SMU03A to ATN/CX(if applicable). For
net Eco for all Power cube.
4. For ECC500 Controller, the in cable
from master battery to MUS01A’ board
COM2.
Please check Installation Guidelines
Images.

2024-7-17 Page1, Total Page7


Whether the communication between
The communication
ECC500S and the network management
server is normal (NETECO connection). between

T01-02 Note:- Without NetEco connection its Y N ECC500SS/ECC500 and


not recommended to install LIB battery
the network management

server should be normal.

Thecommunication
between ECC500SS and
Whether thecommunication between sub equipment should be
T01-03 ECC500SS and sub equipment (PSU, Li Y N normal.We can check the
battery) is normal. software version of all sub
equipment in the WEB or
LCD of ECC500SS
Whether all the parameters of Battery in
Power systemis accord with the actual
requirement
1. Float/FC voltage: 54.5 V
2. Boost/EC Voltage: 56.4 V
3. DG ON Voltage: N/A
4. DC undervoltage Threshold: 48.2
V
5. Charge limit Coefficient:0.40C10
Y N
6. Battery type: ESM-H
T01-04
7. Battery capacity: 300 AH All the parameters that set
in the Controller as per site
8. LLVD-1/Minor low voltage
scenario, Please check in
Disconnect:47.6 V Annex-1 for reference.
9. LLVD-2/Major Low Voltage
Disconnect:45.5 V
10. BLVD: 44.0 V
11. Temperature compensation
coefficient: 0.0
12. DG configuration Mode:N/A

2024-7-17 Page2, Total Page7


Signature Page for Acceptance

Signature Page for Acceptance Acknowledgement:

Perform the acceptance tests by strictly following the operation guidance of this manual. Sign
below to acknowledge the acceptance.

Conclusion: These acceptance tests cover items, including acceptable, unacceptable, and exempt.

Authorized FLM representative Authorized Ncell representative

Signature: Signature:

Name:Bipin Adhikari Name:


Date: 28/05/2023 Date:

Annex-1Battery cable connection in SMU02C controller(ICC330,ICC720)

2024-7-17 Page3, Total Page7


 For ECC500 controller (ICC200/210/310/500/702): Connection of battery COM_IN to
MUS01A board COM2 Port

Cha Bo Flo
Ba Te
Batte rgin Batt ost at DG
tter Low LL LL mp
Power ry g ery Vol Vol ON BL
y volt VD VD .
Plant categ Co- capa tag tag Volt VD
Typ age 1 2 Co
ory effic city e e age
e eff
ient (V) (V)
Auto
ICC33 ESM- ES
(N*1 56. 54. 47 45.
0-H1- 4810 0.4C M- 48 47.8 44 0.0
00A 4 5 .6 5
C6 0B1 A
H)
ICC31 Auto
ESM- ES
0/210 (N*1 56. 54. 47 45.
4810 0.4C M- 48 47.8 44 0.0
/500/ 00A 4 5 .6 5
0B1 H
702 H)
3rd ESM- (N*1
0.15 N/ 56. 54. 47 45.
party/ 4810 00A 48 47.8 44 0.0
C A 4 5 .6 5
TP 0B1 H)

2024-7-17 Page4, Total Page7


Battery Installation report with before/After Battery/PP Snaps and oth

PP settings for the new Battery bank

2024-7-17 Page5, Total Page7


2024-7-17 Page6, Total Page7
2024-7-17 Page7, Total Page7