General Please note that this sketch was only shared for the confirmation of revised alignment of dam

is sketch was only shared for the confirmation of revised alignment of dam w.r.t. changes in slopes and the
- Indicate the contour label and proposed excavation levels minimum clearance from the land boundary as discussed in VC dated 9th May 2024. Confirmation on the same is still awaited for
-Mention the bottom level of the reservoir after final excavation finalization of design and drawings of Upper Reservoir. Please also refer the complete discussion on the subject matter in the trailing
mail for further clarity.

Suggest providing a Is road modeled in 3d?Does toe line Road influence is


service road (4-5 m wide) includes with road. Please clarify? already modelled in
around the periphery of Also please see the drains (which Civil 3D and the
the dam toe
may occupy 1m).Please include all same can be
details mentioned and see the checked in the Civil
clearances. 3D file already
shared.

Provide GFRD general section with zoning and


size of rock fill in different zones. Refer reply above.

Make a tabular format which includes - source For Friction angle, please
of material for filling of rockfill with UCS and type also refer the complete
discussion on the subject
of rock and source. Also,basis of taking 40
matter in the trailing mail
degree friction angle. for further clarity. Also
Please give justification for location of bottom refer reply above.
outlet. Is any extra boundary is required for
keeping outlet arrangement?
Location of Bottom outlet is indicatively kept as per the suggestion by
Greenko at this location (same as given in DPR). However the same is
on hold till the time same is finalized by Greenko. Further for boundary
issue please refer our mail again, as the actual stripping required may
vary slightly based on site conditions, which could affect the available
space from the existing land boundary.
- It seems there is no value addition by constructing this part as the
opposite side ramp can be used to access dam top
- The junction which meets the opposite side ramp top and dam top road
shall be designed by facilitating U-turn.
Additional road was provided as per the suggestion of Greenko. UPPER RESERVOIR
However if suggested the same can be removed now, please confirm. LAYOUT PLAN
Further requirement of providing U-turn at dam top is not understood as
it is easier to construct a straight entry. Please review.