PT. DELTA KENCANA KHARISMA Job No. Sheet No. Rev.

Engineering & Constructions 06-VIII-15 1 of 12 02


Part :
Project Title: Ref. :
WAREHOUSE B1 & B2 - 24x84 m By Chd Appd
CEPI CEMA CIP
Location : Muara Enim Palembang Contact Person : File :CIP-Warehouse-Analisa Struktur-R02 Date : 02/02/2016

STRUCTURE ANALYSIS REPORT

WAREHOUSE B1 & B2 - 24x84 m

02/02/2016
PT. DELTA KENCANA KHARISMA Job No. Sheet No. Rev.
Engineering & Constructions 06-VIII-15 2 of 12 02
Part :
Project Title: Ref. :
WAREHOUSE B1 & B2 - 24x84 m By Chd Appd
CEPI CEMA CIP
Location : Muara Enim Palembang Contact Person : File :CIP-Warehouse-Analisa Struktur-R02 Date : 02/02/2016

CONTENS

1. BASIC OF CALCULATION................................................................................................. 3
1.1 Codes and Standards ............................................................................................... 3
1.2 Materials and Standards........................................................................................... 3
1.3 Welding.................................................................................................................. 3

2. LOADING
2.1 Dead Load .............................................................................................................. 3
2.2 Live Load ............................................................................................................... 4
2.3 Wind Load .............................................................................................................. 4
2.4 Earthquake Load ..................................................................................................... 5
2.5 Combination Load.................................................................................................. ... 6

3. ALLOWABLE DEFORMATION ........................................................................................... 6

4. STEEL DESIGN CHECK..................................................................................................... 6


4.1 Stress Ratio ............................................................................................................ 6
4.2 Displacement Check ................................................................................................ 7
4.3 Anchor Design Check ............................................................................................... 7
4.4 Bolt Design Check ................................................................................................... 9

5. STEEL SECTION ............................................................................................................ 10

6. SUPPORT REACTION .................................................................................................... 11

02/02/2016
PT. DELTA KENCANA KHARISMA Job No. Sheet No. Rev.
Engineering & Constructions 06-VIII-15 3 of 12 02
Part :
Project Title: Ref. :
WAREHOUSE B1 & B2 - 24x84 m By Chd Appd
CEPI CEMA CIP
Location : Muara Enim Palembang Contact Person : File :CIP-Warehouse-Analisa Struktur-R02 Date : 02/02/2016

1. BASIC OF CALCULATION

1.1 Codes and Standards


1.1.1 Design Criteria
1.1.2 SNI 03-1729-2002, Tata Cara Perencanaan Struktur Baja Untuk Bangunan
Gedung
1.1.3 Peraturan Pembebanan Indonesia untuk Gedung [PPIUG ‘83]
1.1.4 AISC-ASD

1.2 Materials and standards


1.2.1 ASTM A36
Min. Yield Stress, Fy : 240 N/mm2
Min. Tensile Stress, Fu : 400 N/mm2
Eff. Yield Stress, Fye : 372 N/mm2
Eff. Tensile Stress, Fue : 440 N/mm2
Modulus of Elasticity, E : 200000 N/mm2
Poisson’s Ratio, U : 0,3

1.3 Welding
Welding electrode : AWS A5.1/D1.1 or JIS Z 3211
Quality of weld: AWS E7016, Fy=70 ksi

2. LOADING

2.1 DEAD LOAD


 Steel selfweight

02/02/2016
PT. DELTA KENCANA KHARISMA Job No. Sheet No. Rev.
Engineering & Constructions 06-VIII-15 4 of 12 02
Part :
Project Title: Ref. :
WAREHOUSE B1 & B2 - 24x84 m By Chd Appd
CEPI CEMA CIP
Location : Muara Enim Palembang Contact Person : File :CIP-Warehouse-Analisa Struktur-R02 Date : 02/02/2016

2.2 LIVE LOAD


 Unaccessable Roof Load = 10 kg/m2 [50% dari beban PPIUG’83]

2.3 WIND LOAD

 Lokasi jauh dari pantai = 12,5 kg/m2 [50% dari beban PPIUG’83]
 Bentuk bangunan tertutup
 Tekan tiup pd dinding = 0,9 × 12,5 = 11,25 kg/m2
 Tekan tiup pd atap = 0,9 × 12,5 = 11,25 kg/m2
 Tekan Hisap pd dinding = -0,4 × 12,5 = 5 kg/m2
 Tekan Hisap pd atap = -0,6 × 12,5 = 7,5 kg/m2

02/02/2016
PT. DELTA KENCANA KHARISMA Job No. Sheet No. Rev.
Engineering & Constructions 06-VIII-15 5 of 12 02
Part :
Project Title: Ref. :
WAREHOUSE B1 & B2 - 24x84 m By Chd Appd
CEPI CEMA CIP
Location : Muara Enim Palembang Contact Person : File :CIP-Warehouse-Analisa Struktur-R02 Date : 02/02/2016

2.4 EARTHQUAKE LOAD

 Auto Lateral Load UBC’97


 Lokasi Zona 2 SNI

02/02/2016
PT. DELTA KENCANA KHARISMA Job No. Sheet No. Rev.
Engineering & Constructions 06-VIII-15 6 of 12 02
Part :
Project Title: Ref. :
WAREHOUSE B1 & B2 - 24x84 m By Chd Appd
CEPI CEMA CIP
Location : Muara Enim Palembang Contact Person : File :CIP-Warehouse-Analisa Struktur-R02 Date : 02/02/2016

2.5 LOAD COMBINATION


M+H M : Dead Load
M+H+A H : Live Load
M+H+G A : Wind Load
G : Quake Load

3. ALLOWABLE DISPLACEMENT
Maximum allowable deflection of beam shall be as specified in the following :
Beam L/240
Truss L/360
Cantilever Beam L/150
Column H/300

4. STEEL DESIGN CHECK


4.1 Stress Ratio

Stress Ratio < 1  Passed

02/02/2016
PT. DELTA KENCANA KHARISMA Job No. Sheet No. Rev.
Engineering & Constructions 06-VIII-15 7 of 12 02
Part :
Project Title: Ref. :
WAREHOUSE B1 & B2 - 24x84 m By Chd Appd
CEPI CEMA CIP
Location : Muara Enim Palembang Contact Person : File :CIP-Warehouse-Analisa Struktur-R02 Date : 02/02/2016

4.2 Displacement Check

Max. Displacement = 45,7 mm


Allowable Displacement = 24.000/240 = 100 mm
45,7 < 100  Passed

4.3 Anchor Design Check

02/02/2016
PT. DELTA KENCANA KHARISMA Job No. Sheet No. Rev.
Engineering & Constructions 06-VIII-15 8 of 12 02
Part :
Project Title: Ref. :
WAREHOUSE B1 & B2 - 24x84 m By Chd Appd
CEPI CEMA CIP
Location : Muara Enim Palembang Contact Person : File :CIP-Warehouse-Analisa Struktur-R02 Date : 02/02/2016

Moment max. At baseplate 162.061 kg.cm

 Anchor Size = 4 x M20; Mat. ST37; Yield Stress 240 Mpa; σ = 1.600 kg/cm2;
 Moment = 162.061 kg.cm
 Lifting Force = 162.061 / 25 = 6.483 kg / 2 = 3.242 kg
 Actual Tensile Stress σ = 3.242 / (1/4 x 3.14 x 22) = 1.033 kg/cm2
 σ < σ  Anchor PASSED

Shear Force max. At baseplate = 772 kg

 Anchor Size = 6 x M20; Mat. ST37; Yield Stress 240 Mpa; σ = 1.600 kg/cm2; τ= 800 kg/cm2

 Shear Force = 772 kg / 6 = 129 kg


2 2
 Actual Shear Stress τ = 129 / (1/4 x 3.14 x 2 ) = 41 kg/cm

 τ < τ  Anchor PASSED

02/02/2016
PT. DELTA KENCANA KHARISMA Job No. Sheet No. Rev.
Engineering & Constructions 06-VIII-15 9 of 12 02
Part :
Project Title: Ref. :
WAREHOUSE B1 & B2 - 24x84 m By Chd Appd
CEPI CEMA CIP
Location : Muara Enim Palembang Contact Person : File :CIP-Warehouse-Analisa Struktur-R02 Date : 02/02/2016

4.4 Bolt Design Check

Moment max. At peak = 188.426 kg.cm


2
 Bolt Size = 10 x M20; Mat. ST37; Yield Stress 240 Mpa; σ = 1.600 kg/cm ;
 Moment = 188.426 kg.cm
 Tensile Strength = 188.426 / 100 = 1.885 kg / 2 = 943 kg
 Actual Tensile Stress σ = 943 / (1/4 x 3.14 x 22) = 300.2 kg/cm2
 σ < σ  Bolt PASSED

02/02/2016
PT. DELTA KENCANA KHARISMA Job No. Sheet No. Rev.
Engineering & Constructions 06-VIII-15 10 of 12 02
Part :
Project Title: Ref. :
WAREHOUSE B1 & B2 - 24x84 m By Chd Appd
CEPI CEMA CIP
Location : Muara Enim Palembang Contact Person : File :CIP-Warehouse-Analisa Struktur-R02 Date : 02/02/2016

Shear Force max. At peak = 332 kg


 Bolt Size = 10 x M20; Mat. ST37; Yield Stress 240 Mpa; σ = 1.600 kg/cm2; τ= 800 kg/cm2

 Shear Force = 332 kg / 10 = 33.2 kg


 Actual Shear Stress τ = 33.2 / (1/4 x 3.14 x 22) = 10,6 kg/cm2

 τ < τ  Bolt PASSED

5. STEEL SECTION

TABLE: Frame Section Properties 01 - General


SectionName Material Shape t3 t2 tf tw t2b tfb dis Area
Text Text Text cm cm cm cm cm cm cm cm2

L80 A36 L80X80X8 8 8 0,8 0,8 12,16


WF200 A36 WF200*100*5,5*8 20 10 0,8 0,55 10 0,8 26,12
WF250 A36 WF250*125*6*8 25 12,5 0,8 0,6 12,5 0,8 34,04
WF300 A36 WF300*150*6,5*9 30 15 0,9 0,65 15 0,9 45,33

02/02/2016
PT. DELTA KENCANA KHARISMA Job No. Sheet No. Rev.
Engineering & Constructions 06-VIII-15 11 of 12 02
Part :
Project Title: Ref. :
WAREHOUSE B1 & B2 - 24x84 m By Chd Appd
CEPI CEMA CIP
Location : Muara Enim Palembang Contact Person : File :CIP-Warehouse-Analisa Struktur-R02 Date : 02/02/2016

6. SUPPORT REACTION

TABLE: Joint Reactions


Joint OutputCase CaseType F1 F2 F3 M1 M2 M3
Text Text Text Kgf Kgf Kgf Kgf-cm Kgf-cm Kgf-cm
1 COMB2 Combination -83,88 -151,31 756,2 185,46 2139,7 -78,08
5 COMB2 Combination -239,1 -176,64 827,74 387,09 -4864,82 174,66
6 COMB2 Combination 211,7 -161,78 1950,04 -686,91 86933,76 213,48
10 COMB2 Combination -1146,7 -157,56 1490,13 -571,2 -351426,54 -1237,55
11 COMB2 Combination 495,04 172,82 2092,24 956,92 171898,18 -635,73
15 COMB2 Combination -1411,19 101,22 1541,36 815,59 -429817,56 1691,38
16 COMB2 Combination 789,22 -228,15 2330,71 -824,07 304096,43 1168,71
20 COMB2 Combination -876,06 -189,02 1546,55 -951,63 -218715,54 -736,94
21 COMB2 Combination 762,14 175,63 2210,43 855,76 295765,24 -1164,44
25 COMB2 Combination -858,95 126,37 1421,02 972,95 -214053,95 780,13
26 COMB2 Combination 463,37 -215,01 2156,28 -953,16 162902,84 548,93
30 COMB2 Combination -1384,44 -155,43 1639,01 -844,14 -421684,85 -1562,65
31 COMB2 Combination 480,1 182,84 2156,43 940,98 159429,34 -623,84
35 COMB2 Combination -1468,17 126,01 1608,75 902,74 -455383,83 1766,25
36 COMB2 Combination 481,75 -10,25 2263,24 -29,2 160011,57 5,2
40 COMB2 Combination -1470,53 -39,83 1726,34 8,4 -456265,57 95,7
41 COMB2 Combination 464,63 -188,84 2115,22 -870,15 162530,23 550,62
45 COMB2 Combination -1383,29 -161,39 1650,67 -1007,58 -422451,48 -1627,02
46 COMB2 Combination 759,93 351,26 2314,96 1856,16 296154,52 -5009,04
50 COMB2 Combination -858,9 0,56 1363,44 -103,46 -213294,94 -0,34

02/02/2016
PT. DELTA KENCANA KHARISMA Job No. Sheet No. Rev.
Engineering & Constructions 06-VIII-15 12 of 12 02
Part :
Project Title: Ref. :
WAREHOUSE B1 & B2 - 24x84 m By Chd Appd
CEPI CEMA CIP
Location : Muara Enim Palembang Contact Person : File :CIP-Warehouse-Analisa Struktur-R02 Date : 02/02/2016

TABLE: Joint Reactions


Joint OutputCase CaseType F1 F2 F3 M1 M2 M3
Text Text Text Kgf Kgf Kgf Kgf-cm Kgf-cm Kgf-cm
51 COMB2 Combination 765,04 -370,49 2355,91 -1864,68 297861,28 4915,65
55 COMB2 Combination -861,38 -0,5 1364,24 105,34 -213919,43 0,73
56 COMB2 Combination 491,48 185,07 2125,79 824,19 170228,72 -615,78
60 COMB2 Combination -1409,8 134,47 1615,7 947,51 -430368,54 1732,53
61 COMB2 Combination 500,81 -199,05 2205,46 -866,78 165305,33 585,86
65 COMB2 Combination -1486,51 -156,68 1678,84 -878,61 -460985,17 -1749,66
66 COMB2 Combination 163,44 73,57 1754,38 738,33 72840,8 -188,79
70 COMB2 Combination -1100,45 56,16 1274,71 632,45 -337760,26 1243,48
71 COMB2 Combination -57,02 -171,67 925,41 -113,3 2186,4 -1,37
75 COMB2 Combination -252,62 -140,38 1024,22 -296,16 -5014,9 26,95
77 COMB2 Combination -685,22 5,32 1445,39 -705,34 -162060,46 -0,72
78 COMB2 Combination -0,38 -153,06 1299,7 -21832,66 -113,47 -1,85
79 COMB2 Combination -56,68 -233,2 642,4 10425,95 -1039,77 -157,28
81 COMB2 Combination -171,72 -169,24 1106,41 -13674,13 828,73 -6,5
82 COMB2 Combination -671,81 -5,41 1432,95 723,89 -158845,69 0,33
85 COMB2 Combination -0,48 -17,45 1736,17 21013,87 -138,84 -0,15
86 COMB2 Combination -60,66 -132,76 658,53 51035,75 -1051,82 -157,3
88 COMB2 Combination -183,62 -30,3 1564,06 17451,02 821,08 84,55
91 COMB2 Combination -673,01 5,48 1434,91 -737,1 -159083,32 -0,56
93 COMB2 Combination -674,53 -5,26 1436 691,75 -159457,65 0,6
98 COMB2 Combination 20,28 -16,06 803,92 2879,21 2608,99 -0,38
102 COMB2 Combination -19,66 -23,86 844,59 4262,43 -2434,12 -0,75