SOIL EMBANKMENT

a) Materials
unit Description Qty Unit Cost Total
pcs. MINI DAMP TRUCK (MIXED GRAVEL) @ 18 1900 34200
34,200.00

b) LABOR
Qty. Description Qty Day Total
pr/cum spreading,compacting,grading @ 72.00 500 36000
36,000.00
TOTAL SOIL EMBANKMENT 70,200.00

FRONT FENCE PAINTING WORKS


a) Materials

Page 1 of 2 J.MAUEL ARCHITECTURAL SERVICES


LENGTH WIDTH DEPTH PCS
F1 1.2 1.2 1.5 22 47.52
F2 0
F3 0
F4 0
F5 0
F6 0
F7 0
TOTAL CUM. 47.52
BACK FILL 39.6

TIE BEAM EXCAVATION

LENGTH WIDTH DEPTH PCS


TIE BEAM 118 0.25 0.35 1 10.325 TIE BEAM
TOTAL CUM. 10.325

CEMENT 9 92.925
SAND 0.5 5.1625
GRAVEL 1

COLUMN
HIEGHT WIDTH LENGTH PCS
C1 6 0.25 0.4 4 2.4
C2 6 0.25 0.5 4 3
C3 6 0.25 0.5 2 1.5
C4 6 0.3 0.6 2 2.16
C5 6 0.3 0.6 1 1.08
PC1 6 0.25 0.4 0 0
PC2 6 0.25 0.5 0 0
PC3 6 0.25 0.5 0 0