A SPECIFICATION
2 MP Camera with installation at MSB Room,
Generator, Compressor Room and Walkway and
DVR Relocation
1 2 MP CCTV 5nos Installation Work Qty - 5 nos MMK 5,204,000 MMK 5,200,000 MMK 3,178,000 MMK 5,366,000
1.1 CCT V 5nos (Dahua Brand) MMK 315,000 MMK 300,000 MMK 335,000 MMK 406,000
Dahua Cat 6 cable ( 305 M ), ( 3 Drums ) & Power cable Dahua Cat 6 cable ( 305 M ), ( 5 Drums ) , pipe Network cable 2 coil, Flexible pipe 8 coils, Dahua Cat 6 cable ( 915 M ), Flexible coil,
( 100 M - 3 coils ) , 25 pair cable ( 100 M - 1 coil ), pipe and & other accessories pipe & other accessories power cable 200 M , pipe & other accessories
1.2 Network Cable, Power Cable, join box ,balum & other accessories
DC jack, PVC pipe & Accessories
MMK 2,679,000 MMK 3,225,000 MMK 1,008,000 MMK 3,330,000.00
1.4 System confriguration & Programming set MMK 100,000 MMK 100,000 Included Included
up,Testing & commisioning for new CCTV 5 nos
1.5 Point to Point installation for new CCTV 5 nos MMK 125,000 MMK 85,000 MMK 150,000
1.6 Rack installation and existing system tiding and MMK 500,000 Included Included MMK 100,000
proper cable modificaiton , T&C
1.7 32'' Monitor ( Brand - TCL ) MMK 485,000 MMK 450,000 MMK MMK 450,000
2 DVR relocation work from level 2 to CCTV Room MMK 1,710,000 MMK 1,225,000 MMK 400,000 MMK 1,466,000
2.1 DVR Relocation Work (6pcs) 1 Lot 200,000 Included MMK 400,000 MMK 180,000
Dahua Cat 6 Network Cable ( 305 M , 4 Drums ) Dahua Cat 6 Network Cable ( 405 M) Dahua Cat 6 Network Cable ( 405 M) Dahua Cat 6 Network Cable ( 305 M) & power
cable 100 M
2.2 Network Cable, Power Cable, join box , PVC pipe
& Accessories
MMK 1,260,000 MMK 775,000 Included MMK 1,256,000
Commercial Bid Analysis
Project No : Generator No.2 1500 Prepared By Thae Ei San
Date :11 June 2024
PR No : Revision : R-1
2.4 System confriguration & Programming set MMK 250,000 MMK 400,000 Included Included
up,Testing & commisioning
B Validity : Validity one week (Quotation sent 12.6.2024) Validity two week (Quotation sent 11.6.2024) Validity one week (Quotation sent 11.6.2024) Validity one week (Quotation sent 11.6.2024)
Delivery Time : 14 day from date of offer 14 day from date of offer Upon recepit of order Upon recepit of order
Delivery Term : Delivery and installation Delivery and installation Delivery and installation Delivery and installation
Payment Term : 50% on signing contract & 50 % after completion 50% on signing contract & 50 % after 20% down payment, 30% when installation 50% down payment and 50 % after
completion and 50 % after completion completion
Total (MMK) (MMK) 6,914,000 (MMK) 6,425,000 (MMK) 3,578,000 (MMK) 6,832,000
Less Dis % (MMK) (MMK) (MMK) (MMK) (MMK)
Final Negotiated Price (MMK) (MMK) 6,914,000 (MMK) 6,425,000 (MMK) 3,578,000 (MMK) 6,832,000
Commercial Tax 5% (MMK) (MMK) (MMK) (MMK) (MMK)
Grand-Total (MMK) (MMK) 6,914,000 (MMK) 6,425,000 (MMK) 3,578,000 (MMK) 6,832,000
C REMARKS:
D RECOMMENDATION: