Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

1.

THIS DRAWING IS THE COPYRIGHT OF P&T GROUP ARABIA


ENGINEERING CONSULTANCY COMPANY AND MUST NOT BE
ST.13 ST.14 ST.15 ST.16 ST.17 ST.18 ST.19 ST.20 ST.21 RETAINED, COPIED OR USED WITHOUT THE ABOVE CONSULTANT'S
AUTHORITY.
2. DO NOT SCALE FROM THE DRAWINGS.
3. ALL DIMENSIONS ARE IN MILLIMETERS & LEVELS IN METERS
UNLESS NOTED OTHERWISE. ALL DIMENSIONS TO BE VERIFIED ON
SITE & APPROVED BY THE ENGINEER.
4. THIS DRAWING SHOULD BE READ IN CONJUNCTION WITH OTHER
RELEVANT ARCHITECTURAL, STRUCTURAL, MECHANICAL,
ELECTRICAL & CIVIL DRAWINGS & ALL RELEVANT SECTIONS OF
THE SPECIFICATIONS.

NOTES
1. FOR LEGEND , SYMBOLS AND ABBREVIATIONS REFER TO
DWG NO (R05H00-D002-PTE-XX-XXX-DWG-FP-00002).
2. FOR GENERAL DETAILS REFER TO
DWG NO (R05H00-D002-PTE-XX-XXX-DWG-FP-00003),
(R05H00-D002-PTE-XX-XXX-DWG-FP-00004),
(R05H00-D002-PTE-XX-XXX-DWG-FP-00005),
(R05H00-D002-PTE-XX-XXX-DWG-FP-00006) &
(R05H00-D002-PTE-XX-XXX-DWG-FP-00007).

ST.Z1
ST.Z1 ST.Z1

ST.Z
ST.Z ST.Z

ST.Y
ST.Y ST.Y

ST.X
ST.X ST.X

T2 TENDER ADDENDUM MSM AMS 31-MAY-2024


T0 TENDER ADDENDUM MSM AMS 23-FEB-2024
REV REVISION DESCRIPTION DWN CHK DATE
KEY PLAN

23

∅50 VP T/A

ST.W
ST.W ST.W

∅50 VP H/L
DRAWING STATUS
Ø20 FOSP U/T
∅20 FOSP U/T ∅50 VP H/L
ISSUED FOR TENDER
CLIENT
∅50 VP H/L
ST.V
ST.V ∅20 FOSP F/A ∅20 FOSP ST.V

DESIGN MANAGER

FUEL TANK
CAPACITY =5000
ST.U
ST.U LITERS
CHKV ST.U
∅20 FOSP T/B Ø20 FORP T/B
LEAD CONSULTANT
P&T Group Arabia
Engineering Consultancy Company
7534 King Abdulaziz Road, Al Ghadeer District, Riyadh, KSA.
Tel +966 11 450 9942, Fax +966 11 454 6998, P O Box 54995
E-mail: info@ptsaudi.com,Website: www.p-t-group.com
Ø20 FOSP U/T
Ø20 FORP U/T MEP CONSULTANT

www. diyar.com
24 North Jeddah, Prince Sultan Street P.O Box 19413, Jeddah 21435, Kingdom of Saudi Arabia
Tel +966 (12) 6999 888, Fax +966 (12) 6999 777

PROJECT NUMBER
ST.T
ST.T ST.T R05Z00
PROJECT TITLE

RUA AL MADINAH SUPERBLOCK 5


IV SV
AL MADINAH, KSA
Ø20 FOSP F/B Ø20 FORP F/B

DRAWING TITLE
PLANS
DC-2 GENERATOR FUEL DAILY
SYSTEM BASMENT MEZZANINE
WEST FLOOR PLAN
NORTH SIGN DRAWN CHECKED
ST.S
ST.S ST.S
MSM AMS
N APPROVED APPROVED

Q
DATE DWG. SCALE DWG. SIZE

31-MAY-24 1 : 100 A0
OUT OF BC SCOPE DRAWING SCALE BAR
7.5m 37.5m
ST.13 ST.14 ST.15 ST.16 ST.17 ST.18 ST.19 ST.20 ST.21 30m
OUT OF BC SCOPE 0m 15m 22.5m

DRAWING NUMBER REV

DC-2 GENERATOR FUEL DAILY SYSTEM BASMENT MEZZANINE WEST FLOOR


ST.13 PLAN
ST.14 ST.15 ST.16 ST.17 ST.18 ST.19 ST.20 ST.21
01 SCALE 1 : 100
R05Z00-D002-PTE-23-BM2-DWG-PL-11603 T2

THIS IS A CAD DRAWING AND MUST NOT BE ALTERED MANUALLY


PRINTED AND/OR EXPORTED ON: 6/24/2024 2:32:57 PM

You might also like