One Za’abeel INSPECTION CHECKLIST

Installation of lighting fixtures Doc Ref. # OZ-QCL-MST-059

LEVEL BASEMENT 03 DATE 23/05/2022


AREA/SECTION BB 050 CONTRACTOR SPECON
GRIDLINES [47-48/BAC-BAE] DISCIPLINE ELECTRICAL

VERIFICATION
SL.# ACTIVITIES / ITEMS TO BE INSPECTED
YES NO N/A
1 Ensure approved method statement is available 
2
Ensure approved shop drawing is available for the service/area of
installation

3 Ensure the approved material submittal is available 
4 Check the support of lighting fixture is fixed properly and rigid 
5
Ensure that all circuit wires have been tested prior to termination at light
fixture.

6 Check of the alignment of the light fixture on ceiling tiles. 
7
Check for all openings in any kind of false ceiling made according to the
dimensions provided by the manufacturer.

8 Check for all the lighting fixtures are grounded. 
9
Check for all recessed lighting fixtures installed fully flush in the false
ceiling.

10 Check for all lighting fixtures equipped with correct type pf lamps. 
11
Check for the diffusers firmly installed on the lighting fixture (where
applicable)

12 Check for labelling and protection of all lighting fixtures 
Comments/Remarks If Any

Representative SPECON (Engineer) SPECON (QA/QC) ALEC (M/C) Consultant (WSP)


Signature
Name JAMEEL ISMAIL
Date 23/05/2022 23/05/2022

Page 1 of 1 Revision: 00
1. Identify all conduits with sprayed on colour at both
terminations immediately after installation as per
specification colour code
2. No objection subject to complete compliance of the
Project specification and design drawings

Naji Zerbe
08-07-2018
Response to Comments on Submittal

Project: ONE ZA’ABEEL Employer: ONE ZA’ABEEL LLC

Engineer: WSP Architect: NIKKEN SEKKEI

Cost Consultant: OMNIUM Contractor: ALEC

Discipline: ELECTRICAL Location : TOWER - B Date : 23/05/2022

SPE-IN-009842-01 Work Inspection Request for MEP ceiling closure for DRY SPE-IN-009842-01
Submittal Ref:
Subject: Areas in BOH CORRIDOR BB050 @ BASEMENT-03 [36-49/BQ-BY]. (As per 00

attached highlighted drawings)


Sl. highlighted drawings) zone – 05 Remarks
No Comment/Instruction/Observation Alec Reply
Missing Lid covers to be provided.
1 provided

2. Trunk covers to be provided. Noted missing at some area. provided

provided
3 Missing ACS junction box identification labels to be provided. .
23/05/2022, 15:29 https://mea.aconex.com/rsrc/20220502.1032/en_AU_DOC/mail/view/index.html#/1744830722/1792629408

MAIL TYPE MAIL NUMBER REFERENCE NUMBER


Response to Work Inspection Request WSP-RWIR-077524 SPE-IN-009842

Re: SPE-IN-009842-01 Work Inspection Request for MEP ceiling closure for DRY
Areas in BOH CORRIDOR BB050 @ BASEMENT-03 [36-49/BQ-BY]. (As per
attached highlighted drawings)

From Mr Markose Martin - WSP Middle East Ltd

To (2) Mr Ajith Nalluraya - ALEC Engineering & Contracting L.L.C (+1 more...)

Cc (13) Mr Ajith Nalluraya - ALEC Engineering & Contracting L.L.C (+12 more...)

Sent Tuesday, 1 March 2022

DETAILS

Space Number B3-BB021

Reference Shop Drawings OZ31317-ZL4050-IDC-SD-BB-B3-A-RCP-1001-R2-NS_B

Area Basement B

WIR - Document Attached

WIR - Grid 36-49/BQ-BY

WIR - Shift Normal Shift

WIR - Activity Type CCIR - Mechanical

Primary Discipline MEP (General MEP)

Description MEP ceiling closure Inspection for DRY Areas in BOH CORRIDOR BB050 @ BASEMENT-03 [36-49/BQ-BY].
(As per attached highlighted drawings)

WIR - Date of Inspection 25/02/2022

WIR - Time of Inspection 11.00 hour

WIR -Reviewer’s Comments Mechanical:


Refer attached compliance sheet.

Electrical
-Missing Lid covers to be provided.

https://mea.aconex.com/rsrc/20220502.1032/en_AU_DOC/mail/view/index.html#/1744830722/1792629408 1/3
23/05/2022, 15:29 https://mea.aconex.com/rsrc/20220502.1032/en_AU_DOC/mail/view/index.html#/1744830722/1792629408

-Trunk covers to be provided. Noted missing at some area.


-Missing ACS junction box identification labels to be provided.

WIR - Status A - Approved

MESSAGE

From: A Nalluraya
Sent: 24/02/2022 4:17:08 PM GST (GMT +04:00)
To: Raghid Gabrial, Sameer Rahim, Hanif Abdulrahman, Romell Alcantara, Sadiq Ali SK, Girish Gopinath, Ayas Hakeema, Syed Imtiyaz, Palani K, Jayesh
Kumar, Vimal Kumar, Vineeth Varisseril
Cc: Anil Alexander, Nihal Azeez, Chinmaya Kumar Jena, Anish kaippally, Prejwal Kandira Valappil, Mantu Kumar, Niranjan Kumar, Vinish Nair, Aswath
Pillai, Deepak Radhakrishna Panicker, Govintharasu Ramalingam, Zubair Siddiqui, Vinesh Thandamparambil, Vijin Wilson, Leni Estioko, Jasper Seva,
Jeanette Alvaran, Nikken pml, Reiko Yonekura, Charisma Brondo, Walid Al Sarady, Cyrile Pereña, Romell Alcantara, Katherine Froyalde, Roman
Geronimo, ME-ICD Supervision-DC
Mail Number: ALE-WIRQ-125836
Subject: SPE-IN-009842-01 Work Inspection Request for MEP ceiling closure for DRY Areas in BOH CORRIDOR BB050 @ BASEMENT-03 [36-49/BQ-BY].
(As per attached highlighted drawings)

Space Number: B3-BB021


Reference Shop
OZ31317-ZL4050-IDC-SD-BB-B3-A-RCP-1001-R2-NS_B
Drawings:
Area: Basement B
WIR - Document
Attached:
WIR - Grid: 36-49/BQ-BY
WIR - Shift: Normal Shift
Primary Discipline: MEP (General MEP)
WIR - Activity
CCIR - Mechanical
Type:
MEP ceiling closure Inspection for DRY Areas in BOH CORRIDOR BB050 @ BASEMENT-03 [36-49/BQ-BY]. (As per attached
Description:
highlighted drawings)
WIR - Date of
25/02/2022
Inspection:
WIR - Time of
11.00 hour
Inspection:
ALEC QA/QC
Ready For Inspection
Status:

From: N Cherian
Sent: 24/02/2022 4:13:50 PM GST (GMT +04:00)
To: Harshith Amin, Mohammad Javid, Chinmaya Kumar Jena, Moegammad Kaashif Bardien, Anish kaippally, Ajith Nalluraya, Zubair Siddiqui, Vinesh
Thandamparambil
https://mea.aconex.com/rsrc/20220502.1032/en_AU_DOC/mail/view/index.html#/1744830722/1792629408 2/3
23/05/2022, 15:29 https://mea.aconex.com/rsrc/20220502.1032/en_AU_DOC/mail/view/index.html#/1744830722/1792629408

Cc: Eleazar Dumaguing, Jitesh Kumar, Roven Liporada, Shaheem Palakkal, Philip Simon, Tom Townley, Jameel Ahmad, Asfak Al Ameen, Walid Al Sarady,
Mohammad Alkhateb, Abed Botmah, Nithin Cherian, Mohsen Yaser Hassoon, Syed Ismail, Nasser Khalaf, Faysal Nafaa, Ahmad Nofal, Ashraf Noman,
Riyas Rahiman, Abdel Rahman, Robert Sinampayan
Mail Number: SPE-IN-009842-01
Subject: SPE-IN-009842-01 Work Inspection Request for MEP ceiling closure for DRY Areas in BOH CORRIDOR BB050 @ BASEMENT-03 [36-49/BQ-BY].
(As per attached highlighted drawings)

Space Number: B3-BB021


Reference Shop
OZ31317-ZL4050-IDC-SD-BB-B3-A-RCP-1001-R2-NS_B
Drawings:
Area: Basement B
Previous WIR Ref: N/A
WIR - Document
Attached:
WIR - Grid: 36-49/BQ-BY
WIR - Shift: Normal Shift
Primary Discipline: MEP (General MEP)
WIR - Activity
CCIR - Mechanical
Type:
MEP ceiling closure Inspection for DRY Areas in BOH CORRIDOR BB050 @ BASEMENT-03 [36-49/BQ-BY]. (As per attached
Description:
highlighted drawings)
WIR - Date of
25/02/2022
Inspection:
WIR - Time of
11.00 hour
Inspection:

Dear All,

Please see attached WIR with reference SPE-IN-009842-01

Thank you.

Best Regards,
Nithin Cherian
QA/QC Engineer
SPECON

This mail was prepared by V Varisseril

https://mea.aconex.com/rsrc/20220502.1032/en_AU_DOC/mail/view/index.html#/1744830722/1792629408 3/3
AH-WSP(MEP):- Is it KEY PLAN
39 40 ceiling strobe; if so 41 42 44 45 46 47 36 50 57
please match the
legend (Typ.) PA GG-WSP(MEP)- Sprinkler is CEILING FIXTURES LEGENDS:
missing. Refer to approved Specon F+
S-
UP
UP
300 RC SLAB_RAMP

FIRE ALARM

R390
0
fire protection shop drawing and BAB
BAA
1 provide sprinklers accordingly
F+
S-

UP
UP
UP

UP
UP
F+
S-

RCP-5111 CENTRAL BATTERY UP


UP
UP
UP F+
S-

FM-02
F+
S-

FM-02
1 1:20

TOWER B
CLG H. 2400
F+
S-

CLG H. 2500
385 RCP-5111 385 BM

AH-WSP(MEP):-
BJ

335
Type of light fixtures F+

BU
S-

BU not matching with F+


S-

185 shop drawing; shall BF


F+
S-

UP
UP

BF
EXIT
F+
S- UP
UP
UP

be clarified.

310
R4000

BB 023
300 RC SLAB_RAMP

CHANNEL DRAIN
CHANNEL DRAIN
CHANNEL DRAIN
CHANNEL DRAIN
(REFER MEP DWG)
(REFER MEP DWG)
(REFER MEP DWG)

PS
(REFER MEP DWG)

BB 003 385
SOP

460
535

335
JANITOR 100MMØ DTA PULL CORD FOR 36 50 57

T14 ASSISTANCE
535 SP T15 SOP GG-WSP(MEP)- Sprinkler is missing. Refer to
BT R BT ES approved Specon fire protection shop drawing, LIGHTING
AH-WSP(MEP):- OZ31317-ZL6001-SPE-SD-BB-B3-FP-SP-100
BB 002 ENGINEER DOCUMENT REVIEW
Recheck the quantity1 FIRE EV 0 and provide sprinklers accordingly
of ceiling speaker RCP-5111 SP SP SP FM-02 LOBBY STAIR B01 CEILING LEGENDS:
BB 034 SUBMITTAL REVIEW STATUS
CLG H. 2400 1
RCP-5111 SOP - START OF POINT
A NO OBJECTION
1

335
B NO OBJECTION, SUBJECT TO COMMENTS
RCP-5111 RE-SUBMISSION REQUIRED

385 SE SA
RE-SUBMISSION NOT REQUIRED
310

460
45 435 BOH

335
C OBJECTION, REVISE & RESUBMIT
BB 005 BB 006 D REJECTED
CORRIDOR
BB 050 REFERENCE R FOR INFORMATION
335

Any review, check certificate, consent, examination, inspection, instruction, notice, proposal,
385
test request or similar act by the Engineer / Engineers Assistants (Including the absence of
BB 014 ALE-RFI-4492 disapproval) shall not relieve the Contractor from any responsibility he has under the

EXIT

EX5
Contract, Including for any errors, omission, discrepancies and non-compliance.
EV LOBBY should the Contractor consider the above response constitutes a variation, he shall notify
235 and get approval from the Engineer prior to incurring any additional cost or delay and/or
1 in compliance with the Contract Conditions
RCP-5111 SP SP SP SP
BS BS ENGINEER
335

Missing CCTV, GSM & TETRA antenna,WIFI, Exit lights, etc. ENGINEERS ASSISTANT
HVAC

265
OTHER (CONTRACT ROLE)

50
360

50
200

200
REVIEWER DATE
Can not relocate as per
BB 013 NS comments .MEP devise is BB 138 REVIEWED FOR COORDINATION SPRINKLERS AND LIGHTS DETAILS IN DROP
AREA SUBJECT TO RESPONSE ON ALE-RFI-008189
CMA already shown on empty tile PS
350

FM-02 0 OFF
CLG H. 2400
10 STRUCTURE
Structural Steel: ------------------------- MEP: ------------------------------
BB 036 SP
135 385

BB 030 BB 032
CSE
T14
02 SP
BB 135
RR (F)
420
SP
0
350 RR (M)
BB 137 1
RCP-5111 N/A
Architectural: ------------------------ Post Tension:---------------------------
BB 001 ER (NORM) ER (ESS) R 10
BR BB 139 BR 1
SP
TR 1 RCP-5111
RCP-5111 STG ALP-01 N/A

100
BB 020 Facade : ------------------------ VT: ---------------------------
Can not relocate as per SP Can not relocate as per CLG H. 2500
SP
NS comments .MEP devise is BB 018 NS comments .MEP devise is PS (HVAC/PH)
1 1

550

550
SOP SOP
RCP-5111 already shown on empty tile already shown on empty tile RCP-5111 PS (PH)
PS 1 BB 136 ABBREVIATIONS AND SYMBOLS LEGEND

335
350 120 RCP-5111 350
435 435 1 1 FIRE PROTECTION
RCP-5111 RCP-5111
SOP
500
385

385
ALP-01 MAIN CONTRACTOR:
SOP CLG H. 2500 C E R T I F I C A T I O N (Contract No.:CBC246 )
THE MAIN CONTRACTOR REVIEWED THE DRAWING BASED
ON CONTRACT DOCUMENTS
APPROVED SIGNATORY:
BOH EV BRIDGET KIRKMAN
EXIT 270
NAME:.....................................................................................................

LOBBY
BB 021 SP
FIRE EV LOBBY-BB 034, RR(F) -BB135, & RR(M) -BB137 (GRIDLINE 44 TO 47 & BR TO BU)
SIGNATURE:...........................................................................................
385

400
CEILING DETAILS:
6
SP SP SP # CEILING TYPE MATERIAL DESCRIPTION MATERIAL SUBMITAL NUMBER DRAWING NUMBER
SCALE 1:50 5
250 Camera & OS is shown in 1 FM-02 (CLG) SUSPENDED CEILING 4
BB 051 OZ31317-ZL4050-IDC-MAT-0008 OZ31317-ZL4050-IDC-SD-ZZ-A-RCP-5111 092116 MATERIAL SUBMITAL FOR GYPSUM CEILING
same tile SYSTEM-FIBER MINERAL BOARD 3

PS (EXPOSED GRID T-BAR) 2 095400 MATERIAL SUBMITAL FOR ALL-03 CLG ALUMINUM LOUVER CEILING
600

1 095123 MATERIAL SUBMITAL FOR FM-02 CLG SUSPENDED CEILING SYSTEM


P-05
GB-01 RE 3 ALL-03 ALUMINUM LOUVER CEILING OZ31317-ZL4050-IDC-MAT-0001 OZ31317-ZL4050-IDC-SD-ZZ-A-RCP-5115 ITEM SPECIFICATION No. DESCRIPTION
80
485

CLG H. 2500 HIGH REFLECTIVE COATING SPECIFICATIONS REFERENCE


IDC MAT 0004_02
AH-WSP(MEP):- 3
D 100
RCP-5111 CCTV camera and ALUMINUM METAL PAN 2
SP 4 ALP-01 OZ31317-ZL4050-IDC-MAT-0005 OZ31317-ZL4050-IDC-SD-ZZ-A-RCP-5112
BQ OS clashing. Provide detail for SUSPENDED CEILING, 1 REFLECTED CEILING BASEMENT PLAN 10 PLOT B B3F OZ31317-ZL0100-DWG-PB-B3-A-07617 C3
520
435

4350 the access panel. FLAT PANEL ITEM DRAWING TITLE DRAWING NO. REV

CONTRACT DRAWINGS REFERENCE


GB-01 DETAL REF TO
600 1
OZ31317-ZL4050-IDC-SD-ZZ-A-RCP-5111_01 P-07 RCP-5111 4
DETAIL-D 3 BASEMENT B - LEVEL B3 HVAC OVERALL LAYOUT OZ31317-ZL6001-SPE-SD-BB-B3-M-AC-1000 01
RE
BASEMENT B - LEVEL B3 FIRE PROTECTION OVERALL LAYOUT OZ31317-ZL6001-SPE-SD-BB-B3-FP-SP-1000 02
BP -B P-05 Wrong reference. 2
P-07
SP RE 1 BASEMENT B - LEVEL B3 OVERALL LIGHTING LAYOUT OZ31317-ZL6001-SPE-SD-BB-B3-E-EL-1000 02
RE
ITEM DRAWING TITLE DRAWING NO. REV
-B 1
INSULATION DETAILS:
02
RCP-5111
42 43 44 SHOP DRAWINGS REFERENCE

INSULATION PLAN (PLOT B B3F)

1
03 REVISED AS PER COMMENTS AND REISSUED FOR APPROVAL 10-03-2021 WA MM
BO
285

BO OZ31317-ZL0100-DWG-PB-B1-A-07117 02 REVISED AS PER COMMENTS AND REISSUED FOR APPROVAL 18-05-2020 SB MM

01 REVISED AS PER COMMENTS AND REISSUED FOR APPROVAL 06-02-2020 SB MM

00 ISSUED FOR APPROVAL 15-10-2019 AP MM

REV DESCRIPTION DATE DRAWN CHKD


BN
BN DRAWING REVISIONS
FM-02
CLG H. 2400
4000 02 CLIENT:

One Za’abeel LLC


DIFC Gate Village Bldg.7, 6th floor
BB 145 P.O.Box. 333888
Dubai, UAE
BOH CORRIDOR-BB 060,BOH EV LOBBY-BB 021, & JANITOR-BB 003 (GRIDLINE 39 TO 43 & GRIDLINE BN TO BU) ENTRANCE

SCALE 1:50
PROJECT MANAGER:

MACE International
Aspect Tower Business Bay,
Executive Towers Level 21,

50
Office No. 2104

SLAB EXPANSION PO Box 26518,Dubai

JOINT BY OTHERS
BM

BB 144
100
12471

12471
DROP-OFF

50
THE ENGINEER / ARCHITECT OF RECORD:
WSL-ED GALVANIZED STEEL M6
50
6mmØ THREADED ROD L1 to be located between 100
louver 50
@1200mm C/C 1200 revise and resubmit. Boulevard Plaza, 2502 Tower 1, Downtown Dubai,
Tel: +971 4 350 5000 Fax: +971 4 3505001
http://www.wspgroup.com
A
HANGER FOR U-PROFILE RCP-5115
MAIN CONTRACTOR:
U-PROFILE ALEC
ALEC Engineering and Contracting L.L.C.
P.O.Box 27639 Dubai-U.A.E
GG-WSP(MEP)- Refer to Tel: 04-429 0599 Fax: 04-429 0216
ALE-RFI-008189 response and
provide sprinkler locations for SC SUB CONTRACTOR:
approval.
A INTERNATIONAL DECOR CO L L C
RCP-5115 P.O.BOX : 2292 ABU DHABI
TEL : 02 - 6269860
35

FAX : 02 - 6269890

GG-WSP(MEP)- Coordinate the


02 Email : idecorco@eim.ae

PROJECT NAME:
100 50 location of FHC and pipe dropping
from the ceiling
SHOP DRAWINGS REFERENCE
One Za'abeel
BASEMENT B - LEVEL B3 OVERALL FIRE ALARM LAYOUT OZ31317-ZL6001-SPE-SD-BB-B3-ELV-FA-1000 01
ALUMINUM LOUVRE CEILING BL BASEMENT B – LEVEL B3 OVERALL LIGHTING CONTROL CIRCUIT LAYOUT OZ31317-ZL6001-SPE-SD-BB-B3-E-LC-1000 01
B
50 x 35 x 3000mm EXTRUDED ALUMINUM RCP-5115 10970 DRAWN: AP CHECKED: MM DATE: 15-10-2019
BASEMENT B - LEVEL B3 EMERGENCY LIGHTING OVERALL LAYOUT OZ31317-ZL6001-SPE-SD-BB-B3-ELV-EM-1000 02
WOOD EFFECT FINISH SCALE: NTS @ A0 APPROVED: AS
ALL-03 BASEMENT B - LEVEL B3 FIRE PROTECTION OVERALL LAYOUT OZ31317-ZL6001-SPE-SD-BB-B3-FP-SP-1000 02
DRAWING TITLE:
CLG H. 2600
BASEMENT B - LEVEL B3 HVAC OVERALL LAYOUT OZ31317-ZL6001-SPE-SD-BB-B3-M-AC-1000 01
REFLECTED CEILING PLAN
BASEMENT B - LEVEL B3 POWER OVERALL LAYOUT OZ31317-ZL6001-SPE-SD-BB-B3-E-EP-1000 01 BASEMENT B BASEMENT 3
SECTION 1 DROP OFF - BB 144, & ENTRANCE- BB 145 BASEMENT B - LEVEL B3 OVERALL LIGHTING LAYOUT OZ31317-ZL6001-SPE-SD-BB-B3-E-EL-1000 01 SHEET 1 OF 2
Color Changed to
SCALE 1:2 RAL 110M refer to SCALE 1:50
IDC MAT 0004_01 N OZ31317-ZL4050-IDC-SD-BB-B3-A-RCP-1001 03
and 02

PROJECT PACKAGE ORGANIZATION DOCUMENT LOCATION / DRAWING


LEVEL DISCIPLINE ACTIVITY REVISION
CODE TYPE ZONE
CODE NUMBER NUMBER
b1 b2 b3 b4 b5 b6 b7 b8 b9
KEY PLAN
36 50 57
34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 RB 56 57

01 F+
S-
UP
300 RC SLAB_RAMP

R3900
02
BAB
F+
S-

UP
UP
BAA
UP

F+
S-

UP F+
S-

UP

F+
S-

1:20

BAG
RAMP 6
BAG
BM 03 F+
S-

04
BB 107

BJ
F+
S-

F+
S-

BF BF
F+
S-

05
UP

F+
S- UPUP

cs

BAF BAF
R4000

300 RC SLAB_RAMP

02 CHANNEL DRAIN
CHANNEL DRAIN
(REFER MEP DWG)
(REFER MEP DWG)
CHANNEL DRAIN
CHANNEL DRAIN
(REFER MEP DWG)
(REFER MEP DWG)

FOR DETAIL OF STAIR CASE (B07) REFER DRAWING


NO: OZ31317-ZL6001-SPE-SD-BB-B7-MEP-ST-0070

RAMP 5
PEA BB 099
BB 094
cs 36 50 57

01 02
cs

UP RAMP 4 ENGINEER DOCUMENT REVIEW


GOA PA STAIR B07
MS
BB 075 BB 125 BB 045

BAE BAE
STG 1:17.1
P-14
R-V
DS
BB 080
TR
BB 086
BB 092
SUBMITTAL REVIEW STATUS
BAD EV PIT BAD
P3 (B3F-1800)
BB 074

MS A NO OBJECTION
ER (ESS)
BB 084 POA

BOH EV
B NO OBJECTION, SUBJECT TO COMMENTS

LOBBY
BB 077
BB 126
POA
STG EDB-BB3-02
BB 089 POA
BB 056 ELCP
ELCP-BB3-02
STG
ER (NORM)
BB 112 RE-SUBMISSION REQUIRED
BB 082
BB 083 TO
B5F RE-SUBMISSION NOT REQUIRED
LCP-BB3-02
BAC BAC
GOA
LCP DB-BB3-02
ELECTRICAL ZONE-02 C OBJECTION, REVISE & RESUBMIT
BB 049 MECH (FAN
GOA
NOTE 07 PEA
BB 093
ROOM)
BB 124
D REJECTED
BB 015
BAB TO B4F cs cs BAB R FOR INFORMATION
Any review, check certificate, consent, examination, inspection, instruction, notice, proposal,
cs

test request or similar act by the Engineer / Engineers Assistants (Including the absence of
disapproval) shall not relieve the Contractor from any responsibility he has under the
ELECTRICAL ZONE-04 Contract, Including for any errors, omission, discrepancies and non-compliance.
PEA
HD PEA
BB 043

BB 042 should the Contractor consider the above response constitutes a variation, he shall notify
and get approval from the Engineer prior to incurring any additional cost or delay and/or
cs

in compliance with the Contract Conditions


BAA FROM B1F TO B1F BAA
cs
ELECTRICAL ZONE-02 ENGINEER
FOR DETAIL OF STAIR CASE (B08) REFER DRAWING
NO: OZ31317-ZL6001-SPE-SD-BB-B7-MEP-ST-0080
ENGINEERS ASSISTANT
BZ BZ

cs
02 DS PA
MS
STAIR B06 OTHER (CONTRACT ROLE)
BB 120

cs
BB 143 BB 111
UP REVIEWER DATE
STAIR B08
BB 046 PA
BB 127

NOTE 07 ELECTRICAL ZONE-04 NOTE 07


ELECTRICAL ZONE-02
FOR DETAIL OF STAIR CASE (B06) REFER DRAWING
REVIEWED FOR COORDINATION
BY NO: OZ31317-ZL3000-SD-PB-B7-GF-ST-01-0060 BY

HKD M10x40

HKD M10x40

HKD M10x40

HKD M10x40

HKD M10x40

HKD M10x40

HKD M10x40

HKD M10x40

HKD M10x40

HKD M10x40

HKD M10x40

HKD M10x40
EXPJ STG

WF-091614
BB 123
bF BX STG BX bF
RB BB 024
UP
ER(ESS) BB 010

BB 063
Structural: --------------------------- Architectural: --------------------------

TR
bE BW PRIVATE BW bE

ER (ESS)
BB 067
GARAGE PRIVATE PRIVATE PRIVATE PRIVATE PRIVATE FOR DETAIL OF STAIR CASE (B09) REFER DRAWING
cs

MS
BB 048 GARAGE GARAGE GARAGE GARAGE GARAGE ELCP-BB3-03
DB-BB3-04 ER(NORM) TR BB 022 BB 061 BB 052 BB 058 ER (NORM)
NO: OZ31317-ZL6001-SPE-SD-BB-B7-MEP-ST-0090
BB 007 BB 012 BB 079
EDB-BB3-03
BV BB 073
DB-BB3-03 02 cs BV
EDB-BB3-04 02
LCP

cs
LCP-BB3-04 FOR DETAIL OF STAIR CASE (B01) REFER DRAWING

LCP
NO: OZ31317-ZL6001-SPE-SD-BB-B7-MEP-ST-0010 LCP-BB3-03
ELCP

ELCP-BB3-04

ELCP
VT: ----------------------------

EXPJ

cs
cs

cs

cs

BB 122
EXPJ

PA
UP
STAIR B09
bD BU BB 085
MS
BU bD
PS P3 T14 T14 T14
BB 023 PA
R R R BB 025
BOH P3 UP
CMA
HKD M10x40

CORRIDOR HKD M10x40

BB 050 BB 037 T15 FIRE EV


BT JANITOR
ES LOBBY MS
STAIR B01 BT
BB 034 BB 002
BB 003 MS PRIVATE
PRIVATE
GPS GARAGE
GARAGE MS
BB 027 BB 070
BB 008
SE SA
BB 005 BB 006

cs

SFC01
PEA HKD M10x40

MS MS HKD M10x40

PEA
UP UP RESI CORR UP
BB 040 EV LOBBY BB 121
04x01M DKH

BB 016 HKD M10x40

BB 014
BS BS ABBREVIATIONS AND SYMBOLS LEGEND
LCP-BB3-01 CMA PS
DB-BB3-01 BB 013 BB 138
ELCP-BB3-01
LCP

PS (HVAC/PH)
ELCP

MS MS
PRIVATE
ER(NORM)

CSE RR (M) PRIVATE


BB 030

GARAGE BB 020
BB 036

MET BB 026
ER(ESS) BB 032

NOTE 07 BB 137 GARAGE


BB 011
02 MS T14
T14
R
RR (F) BB 068
BR R T14 R BB 135 BR
DYNET CONTROL CABLE
04x01M DKH HKD M10x40

TR
02 BB BASEMENT-2
COMING FROM 001 PS STG P3
(LOOP FROM BMS ROOM) BB 018 BB 139 PS (PH)
DS BB 136
BB 009 DYNET CONTROL CABLE PEA
bC GOING TO BASEMENT-4 EDB-BB3-01 BB 119 bC

UP
NOTES:

cs
MS

EXPJ
MS BOH EV
LOBBY 1:20
1. DO NOT SCALE FROM THE DRAWINGS.
BB 051

BB 021
PS

P-05 ELECTRICAL ZONE-03 2. ALL DIMENSIONS ARE IN MILLIMETRES AND LEVELS IN METRES UNLESS NOTED OTHERWISE.
RE
P-05
RE
BQ MS
BQ MAIN CONTRACTOR:
UP

C E R T I F I C A T I O N (Contract No.:CBC246 )

04
P-07 PEA
bB BP RE - B P-05 ELECTRICAL ZONE-03 BB 118 BP bB THE MAIN CONTRACTOR REVIEWED THE DRAWING BASED

03
P-07 RE
RE - B P-05 P3
RE DS ON CONTRACT DOCUMENTS
bA BO BB 072 BO bA
APPROVED SIGNATORY:
BN SFC01
BN NORA BOU SALEH
NAME:.....................................................................................................
P3 P3

ENTRANCE
BB 145 SIGNATURE:...........................................................................................
cs

3
BM BM
2 OZ31317-ZL0100-SPF-E-260010 ELECTRICAL PARTICULAR SPECIFICATION 02 C16
1:20
1:20

1 OZ31317-ZL0100-SPF-E-260943 NETWORK LIGHTING CONTROL SPECIFICATIONS C1


cs

DROP-OFF
BB 144 ITEM SPECIFICATION No. DESCRIPTION REV

SPECIFICATIONS REFERENCE
cs

cs

PARKING (B3)
BB 095 3 ELECTRICAL SERVICES SYMBOLS,LEGEND & ABBREVIATIONS DETAILS OZ31317-ZL0100-DWG-SW-ZZ-E-00010 C10

2 PLOT B LEVEL B2(DM PLAN B2F) GENERAL ARRANGEMENT SHEET 1,2,4 & 5 OZ31317-ZL0100-DWG-PB-B2-S-01021,22,24 & 25 C2
cs

BL BL BASEMENT PLAN 12 PLOT B B3F OZ31317-ZL0100-DWG-PB-B3-A-01517 C7


1
LCP DETAILS 02
ELECTRICAL ZONE-06 ITEM DRAWING TITLE DRAWING NO. REV

FLOOR : BASEMENT-3
02 CONTRACT DRAWINGS REFERENCE
02

cs
ITEM LCP REF LCP SIZE INPUT POWER FED FROM
5 ELECTRICAL SERVICES STANDARD DETAIL SHEET 2 OZ31317-ZL6001-SPE-SD-TB-ZZ-E-DET-5002 01
cs 1 LCP-BB3-01 435(H)x445(W)x110(D) 13A SPUR Y2/EDB-BB3-01 4 ELECTRICAL SERVICES SYMBOLS,LEGEND & ABBREVIATIONS OZ31317-ZL6001-SPE-SD-TB-ZZ-E-GEN-0000 00

2 LCP-BB3-02 430(H)x375(W)x110(D) 13A SPUR Y2/EDB-BB3-02 3 BASEMENT B - LEVEL B3 OVERALL CONTAINMENT LAYOUT OZ31317-ZL6001-SPE-SD-BB-B3-E-CT-1000 01
BK BK
3 LCP-BB3-03 430(H)x375(W)x110(D) 13A SPUR Y4/EDB-BB3-03
2 PLOT B - BASEMENT 3 EMBEDDED CONDUITS LIGHTING LAYOUT SHEET 02 OF 02 OZ31317-ZL3000-SD-PB-B3-E-EL-01-0002 01
ELECTRICAL ZONE-06
02 1 PLOT B - BASEMENT 3 EMBEDDED CONDUITS LIGHTING LAYOUT SHEET 01 OF 02 OZ31317-ZL3000-SD-PB-B3-E-EL-01-0001 01
ELECTRICAL ZONE-01 4 LCP-BB3-04 430(H)x375(W)x110(D) 13A SPUR B4/EDB-BB3-04
ITEM DRAWING TITLE DRAWING NO. REV
5 LCP-BB3-05 430(H)x375(W)x110(D) 13A SPUR Y2/EDB-BB3-05
SHOP DRAWINGS REFERENCE
6 LCP-BB3-06 430(H)x375(W)x110(D) 13A SPUR Y4/EDB-BB3-06

7 ELCP-BB3-01 430(H)x375(W)x110(D) 13A SPUR R3/EDB-BB3-01


02 REVISED AS PER LATEST ARCHITECTURE (REV-C7), IFC (REV-C4) 07-06-2021
BJ BJ 8 ELCP-BB3-02 430(H)x375(W)x110(D) 13A SPUR B4/EDB-BB3-02 PT AP
& CONSULTANT COMMENTS
TR
BB 117
01 REVISED AS PER LATEST ARCHITECTURE (REV-C5), CONSULTANT 27-05-2019 PT MA
NOTE 07 9 ELCP-BB3-03 430(H)x375(W)x110(D) 13A SPUR R4/EDB-BB3-03 COMMENTS
00 ISSUED FOR APPROVAL 05-03-2019 PT MA
ER (ESS)
10 ELCP-BB3-04 430(H)x375(W)x110(D) 13A SPUR Y2/EDB-BB3-04
BB 115
cs

REV DESCRIPTION DATE DRAWN CHKD


cs

cs
11 ELCP-BB3-05 430(H)x375(W)x110(D) 13A SPUR B9/EDB-BB3-05
02
EDB-BB3-06
ELCP
ELCP-BB3-06 DRAWING REVISIONS
ER (NORM)
BB 116
12 ELCP-BB3-06 430(H)x375(W)x110(D) 13A SPUR B3/EDB-BB3-06

ELECTRICAL ZONE-06 cs

LCP
DB-BB3-06
CLIENT:
BI BI
EA LCP-BB3-06
BB 234
ELECTRICAL ZONE-01

P-06
RE
P3

One Za’abeel LLC


DIFC Gate Village Bldg.7, 6th floor
PEA
BB 114 P.O.Box. 333888
Dubai, UAE
P-06
RE

02 DS
BB 066
BH BH
cs

PROJECT MANAGER:

MACE International
cs

cs
Aspect Tower Business Bay,
Executive Towers Level 21,
Office No. 2104
cs
Not matching with approve LCS PO Box 26518,Dubai
BG
NOTE 07 TR
BG material submittal,clarify?
BB 104

P-08
THE ENGINEER / ARCHITECT OF RECORD:
BOH EV BB 064

RE - B
EDB-BB3-05 MS
MS
MS
MS ELCP-BB3-05 FIRE LOBBY
LOBBY

ER (ESS) BB 109 VESTIBULE


MECH CORRIDOR

ELCP BB 102
BB 110
VESTIBULE
BB 071

ELECTRICAL ZONE-05 DB-BB3-05A ER (NORM)


BB 142

BB 103
DB-BB3-05
POA P-08 LCP-BB3-05
BB 053 RE - B LCP
MECH PUMP
P3 ROOM 3
POA BB 113
BB 098 MS
DS SE SA
BB 134 BB 133 BB 132
MS
Boulevard Plaza, 2502 Tower 1, Downtown Dubai,
BF BF Tel: +971 4 350 5000 Fax: +971 4 3505001
STG
BB 055
MS
cs UP
SE
BB 129
SA
BB 128
http://www.wspgroup.com

02 MS

MS

PS
BOH EV
LOBBY
BB 105
MAIN CONTRACTOR:
FIRE LOBBY UP BB 097
BB 130

BB 091
STAIR B05
PA

STG
BB 057
MS

RAMP 7
BB 044

MS
MECH PUMP
ROOM 2
BB 140
FOR MECH PUMP ROOM LIGHTING LOCATION PLEASE
REFER BASEMENT B2 LIGHTING LAYOUT SHEET-05
(DWG.NO: OZ31317-ZL6001-SPE-SD-BB-B2-E-EL-1005)
ALEC
BB 081
P-10
ALEC Engineering and Contracting L.L.C.
BE S BE
STAIR B04
P.O.Box 27639 Dubai-U.A.E

05
FOR DETAIL OF STAIR CASE (B04) REFER DRAWING BB 069 POA P3
NO: OZ31317-ZL6001-SPE-SD-BB-B7-MEP-ST-0040
BD BB 090
BD Tel: 04-429 0599 Fax: 04-429 0216
PA BB 131
02
FOR DETAIL OF STAIR CASE (B05) REFER DRAWING
NO: OZ31317-ZL6001-SPE-SD-BB-B7-MEP-ST-0050
OTB
BB 087
02
CLOUD SCHEDULE 02 SUB CONTRACTOR:
MECH PUMP
DDNG485
02
ROOM 1
BB 141
RA
DS
BB 065
x
BC BC
FROM
DDNP1501
B4F
BB BB
CONTROL
ROOM

02 02 ETS
BB 108

TO FOR THIS AREA LIGHTING LOCATION PLEASE REFER x


B2F BASEMENT B2 LIGHTING LAYOUT SHEET-05 (DWG.NO:
OZ31317-ZL6001-SPE-SD-BB-B2-E-EL-1005) MS
GOA
LCS CONTRACTOR:
RA BB 078
cs

BA BA XX
UP
DS FOR THIS AREA LIGHTING LOCATION PLEASE REFER
BB 096 BASEMENT B2 LIGHTING LAYOUT SHEET-05 (DWG.NO:
PD REFERENCE TAG DETAIL:
FOR THIS AREA LIGHTING LOCATION PLEASE REFER
BASEMENT B2 LIGHTING LAYOUT SHEET-05 (DWG.NO:
OZ31317-ZL6001-SPE-SD-BB-B2-E-EL-1005)
OZ31317-ZL6001-SPE-SD-BB-B2-E-EL-1005)
02

cs
PROJECT NAME:

One Za'abeel
34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 HD 50 51 52 53 54 55 56 57
B3F FL ± 0 = -7.800 DMD
b1 b2 b3 b4 b5 b6 b7 b8 b9

PLOT B B3F
GENERAL NOTE : LIGHTING CONTROL SPECIFIC NOTE : LIGHTING CONTROL CONTRACT/ DESIGN DRAWING REFERENCE: SHOP DRAWING REFERENCE: DRAWN: PT CHECKED: MA DATE: 05-03-2019
ITEM DRAWING TITLE DRAWING NO. REV ITEM DRAWING TITLE DRAWING NO. REV
1. DO NOT SCALE THIS DRAWING. WORK TO SHOWN/ INDICATED 6. MAXIMUM LENGTH OF DYNET CABLE IS 800 METER MATERIAL TO BE AS PER APPROVED MATERIAL SUBMITTAL. SCALE: 1:250 @ A0 APPROVED: CCH
P1 4
PLOT B - LEVEL B3 (DM PLAN B3F) OZ31317-ZL0100-DWG-PB-B3-E-01224 C4 6
BASEMENT B - LEVEL B3 OVERALL LIGHTING
OZ31317-ZL6001-SPE-SD-BB-B3-E-EL-1000 02 02
DIMENSIONS ONLY. 7. ELEC.ROOM DETAILS WILL BE SHOWN ON SEPARATE DRAWING. LTG.OVERALL LAYOUT LAYOUT
WSP Comments: DRAWING TITLE:
PLOT B - LEVEL B3 (DM PLAN B3F) BASEMENT B - LEVEL B3 OVERALL POWER
8. LCS SCHEMATIC WILL BE SUBMITTED SEPARATELY. ALL FALSE CEILING AREAS SHOULD BE CONSIDERED LSF TYPE 5 OZ31317-ZL0100-DWG-PB-B3-E-01524 C4 7 OZ31317-ZL6001-SPE-SD-BB-B3-E-EP-1000 02
2. ALL DIMENSION ARE IN MILLIMETERS AND LEVELS IN METERS P2 CONT.OVERALL LAYOUT LAYOUT - Subject to successful demonstrate the light sensor coverage during T&C.
UNLESS NOTED OTHERWISE. 9. ALL TYPICAL INSTALLATION DETAILS WILL BE SUBMITTED CONDUIT. 6
REFLECTED CEILING BASEMENT PLAN 12
OZ31317-ZL0100-DWG-PB-B3-A-07617 C3 8
BASEMENT B - LEVEL B3 OVERALL LIGHTING
OZ31317-ZL6001-SPE-SD-BB-B3-E-LC-1000 02
- Refer to comments noted in OZ31317-ZL6001-SPE-SD-BB-B3-E-LC-1000 & BASEMENT B - LEVEL B3
PLOT B B3F CONTROL CIRCUIT LAYOUT OZ31317-ZL6001-SPE-SD-BB-B3-E-LC-1100 and comply
SEPARATELY. P - SP EC OVERALL LIGHTING CONTROL EQUIPMENT
3. ALL LEVELS ARE PROVIDED FROM FINISH FLOOR (-7.800). P3 ELEVATOR DRAWINGS WILL BE SUBMITTED SEPARATELY- 7 OU

ON
LAYOUT

ECON GR
10. FINAL SENSORS LOCATION WILL BE COORDINATE WITH FINAL BY OTHERS
4. ALL DIMENSIONS AND LEVELS ARE TO BE VERIFY ON SITE. ANY RCP DRAWING. BEEL

L LC
8
A'A
DISCREPANCY OR ERROR SHALL BE REPORTED TO THE ENGINEER ONE Z

SP
PRIOR TO COMMENCEMENT OF WORK. 9
9 OZ31317-ZL6001-SPE-SD-BB-B3-E-EL-1100 02
5. THIS DRAWING SHALL BE READ IN CONJUNCTION WITH OTHER SP - 15
RELEVANT ARCHITECTURAL, STRUCTURAL, BUILDERS WORK,
MECHANICAL AND ELECTRICAL SERVICES.
PROJECT PACKAGE ORGANIZATION DOCUMENT LOCATION / DRAWING
LEVEL DISCIPLINE ACTIVITY REVISION
CODE NUMBER CODE TYPE ZONE NUMBER

You might also like