SCHEMATIC DRAWING FOR PIPELINE CATHODIC PROTECTION SYSTEM

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 8

NC-200 ERAWIN FIELD EPF PHASE- I (PLAN B

VENDOR COMMENTS RESPONSE SHEET

Document No. ENG052-20ERW-PPFU001-B18-0002 Rev No. ZLOG Transmittal No. Date

PFML Transmittal JI2047-PFML-PPFU001-T-033 02

Page PETROFAC STATUS


SL No. VENDOR RESPONSE REMARKS
No. COMMENTS By ( O\C)
1.
1 of 5 Label and include in below cable schedule Eric.catis Noted and incorporated C

2.
1 of 5 DPTP is missing in the schematic Eric.catis Noted and incorporated C

3.
1 of 5 Label and include in below cable schedule Eric.catis Noted and incorporated C

4.
1 of 5 add in legends Eric.catis Noted and incorporated C

Provide the tag nos. for each CP equipment,


5. components & cables consistent with the CP layout Noted. Final tag numbers incorporatd as per
1 of 5 Eric.catis
drawings, equipment/test facility schedule and cable the test facility and cable schedule C
schedule.
Add notes related to cable termination inside the box
6.
1 of 5 shall be referred to drawing no. xxxx and cable to pipe Eric.catis Noted and incorporated C
connection drawing no.xxxx
7.
1 of 5 Indicate DP tag no. as per layout Eric.catis Noted and incorporated C

8.
1 of 5 Indicate DP tag no. as per layout Eric.catis Noted and incorporated
C
9.
1 of 5 Add Column for scope of supply Eric.catis Noted and incorporated C

10.
1 of 5 Add all associated CP drawings & documents Eric.catis Noted and incorporated C

11. Incorporate all typical & applicable comments marked


2 of 5 Eric.catis Noted and incorporated
in drawing sheet 1 C

12. Total 4 Nos. 6" New EPF Plant NC200


2 of 5 Eric.catis Noted and changed C
(New EWT Facility)???

Legend (Status O\C) : O - Open / C – Closed Page 1 of 2


NC-200 ERAWIN FIELD EPF PHASE- I (PLAN B

Name Noufal KP Name Farheen Mevliwala

Signature Signature

Date 19/11/22 Date 30/11/2022

Legend (Status O\C) : O - Open / C – Closed Page 2 of 2


NC-200 ERAWIN FIELD EPF PHASE- I (PLAN B)
CONTRACT NO: ENG052-20ERW

SUPPLIER DOCUMENT COVER SHEET

Supplier Name: BIN SARI SPECILIAZED TECHNOLOGIES


Purchase Order Number: JI2047-PPFU001
Purchase Order Title: CATHODIC PROTECTION SYSTEM
Equipment/Tag Number: NA
SDRL Code: F23
Supplier’s Document number: BSST -DR-CPJ212510- 003

Document total Pages : 5

Document Title: SCHEMATIC DRAWING FOR PIPELINE


CATHODIC PROTECTION SYSTEM
Document No: ENG052-20ERW-PPFU001-B18-0002
SUPPLIER DOCUMENT REVIEW

Purchaser’s review of this document does not relieve Seller of the responsibility for correctness under the purchase order
or contract. Permission to proceed does not constitute acceptance of design, detail and calculations, test methods or
materials developed or selected by the Seller and does not relieve the Seller from full compliance with the purchase order,
contract or any other obligations, nor detract from any of the Purchaser’s rights.

Reviewer Signature Date


Farheen / Eric 30/11/2022

CODE A Final: No Comment, document accepted. Do not re‐submit, except modified.


Revise and Re-issue. Work may not Proceed
CODE B
Revise and Re‐issue: Returned with comment, incorporate comments and re‐issue for review.
Revise document to address comments and issue as final. Work may Proceed
CODE C No re-submittal for review required if SUPPLIER agrees with and makes indicated document
changes. CONTRACTOR to resolve with Project Team if disagreement on making changes to address
comments
Review not required. Work may Proceed
CODE D
Incorporate comments and proceed. Do not re-issue for review, issue for Final Submission.
Rejected. Work may not Proceed
CODE R
Incorporate comments and re-issue for review. Work may NOT proceed.

Issue Record

02 Issued for Approval 19-11-2022 KPN MGS YMS

01 Issued for Review 28-09-2022 KPN MGS YMS

Rev Purpose Date Prepared Checked Approved


NC-200 ERAWIN FIELD EPF PHASE- I
(PLAN B)
CONTRACT NO: ENG052-20ERW

Revision No. Date Author Scope / Remarks


01 28.09.2022 KPN Issued for Review
02 19-11-2022 KPN Issued for Approval

Holds List

S. No Reference Clause Remarks


NC-200 ERAWIN FIELD EPF PHASE- I
(PLAN B)
CONTRACT NO: ENG052-20ERW

Table of content
1. Schematic Drawing For Pipeline Cathodic Protection System 4

You might also like