NC-200 ERAWIN FIELD EPF PHASE- I (PLAN B

VENDOR COMMENTS RESPONSE SHEET

Document No. ENG052-20ERW-PPFU001-B18-0001 Rev No. ZLOG Transmittal No. Date

PFML Transmittal JI2047-PFML-PPFU001-T-035 02 25/11/22

Page PETROFAC STATUS


SL No. VENDOR RESPONSE REMARKS
No. COMMENTS By ( O\C)
Delete the wire.
1. Label the Earth studs and add in the drawing notes: -
1 of 14 Eric.catis Noted and incorporated C
"Earth Studs are provided as manufacturer standard
provisions if and when required or as applicable"
2. Show the earth studs in support frame as indicated in
1 of 14 Eric.catis Noted and incorporated C
other drawing sheet for consistency.
3. Provide the cross-section details of the cable trench /
1 of 14 Eric.catis Noted and incorporated
routing (between Deepwell GB-JB-TR C
4.
1 of 14 Conduit Hubs mising Eric.catis Noted and incorporated C
5.
1 of 14 Earthimg Syud By BSS Eric.catis Noted and incorporated C
6.
1 of 14 (See note no. x) Eric.catis Noted and incorporated C
7.
1 of 14 Indicate cables are also secured with cable tie Eric.catis Noted and incorporated C
8. Incorporate all typical comments as marked in drawing
2 of 14 Eric.catis Noted and incorporated C
sheet 1 of 20
9. Indicative foundation details are not consistent with other
2 of 14 Eric.catis Noted and changed C
drawings
10. Incorporate all typical comments as marked in drawing
3 of 14 Eric.catis Noted and incorporated C
sheet 1 & 2 of 20.
11. This drawings and details are not consistent with
4 of 14 Eric.catis Noted and incorporated C
drawings sheet 1,2 & 3.
12.
4 of 14 add note as commented in drawing sheet 1 Eric.catis Noted and incorporated C

Legend (Status O\C) : O - Open / C – Closed Page 1 of 5


NC-200 ERAWIN FIELD EPF PHASE- I (PLAN B
13.
4 of 14 Conduit Hubs mising Eric.catis Noted and incorporated C
Noted, Sheetwise BOQ will be provided in the
14. layout drawings. Locations where junction C
4 of 14 add the missing materials Eric.catis
boxes are used are already mentioned in the
drawing
15. Incorporate all typical comments as marked in drawing
5 of 14 Eric.catis Noted and incorporated C
sheet 1 of 20, including earthing related comments
16.
5 of 14 add note as commented in drawing sheet 1 Eric.catis Noted and incorporated
C
17.
5 of 14 Conduit Hubs mising Eric.catis Noted and incorporated C

18.
5 of 14 add the missing materials Eric.catis Noted and incorporated C

Incorporate all typical comments as marked in drawing


19.
6 of 14 sheet 1, 4 & 5 of 20, including earthing related Eric.catis Noted and incorporated C
comments
Add note the foreign pipeline cable (B2) shall remain
20. disconnected inside the JB. Connection shall depend on
6 of 14 Eric.catis Noted and incorporated
the commissioning results and recommendation by a C
qualified CP engineer.
Add in note the allowed minimum wall thickness (mm)
21.
6 of 14 for pin brazing on to the existing/foreign pipeline, as Eric.catis Noted and incorporated C
per pin brazing manufacturer recommendation.
Incorporate all typical comments as marked in drawing
22.
7 of 14 sheet 1, 4 & 5 of 20, including earthing related Eric.catis Noted and incorporated C
comments
Add in note the allowed minimum wall thickness (mm)
23.
7 of 14 for pin brazing on to the existing/foreign pipeline, as Eric.catis Noted and incorporated C
per pin brazing manufacturer recommendation.
Add note the foreign pipeline cable (B2 & B3) shall
24. remain disconnected inside the JB. Connection shall
7 of 14 Eric.catis Noted and incorporated C
depend on the commissioning results and
recommendation by a qualified CP engineer.
25.
7 of 14 no. 3 series Eric.catis Noted and incorporated C
26. Incorporate all typical comments as marked in drawing
8 of 14 Eric.catis Noted and incorporated C
sheet 1, 4, 5, 6 & 7 of 20, including earthing related
Legend (Status O\C) : O - Open / C – Closed Page 2 of 5
NC-200 ERAWIN FIELD EPF PHASE- I (PLAN B
comments
Incorporate all typical comments as marked in drawing
27.
9 of 14 sheet 1, 4, 5, 6 & 7 of 20, including earthing related Eric.catis Noted and incorporated C
comments
10 mm-sq Test 10mm-sq cable is missing. As
28. Noted, monitoring cables are provided in the
9 of 14 commented earlier minimum 2 CP cable-to-pipe Eric.catis C
IJTP which is very close to EBB
connections are required.
Incorporate all typical comments as marked in drawing
29.
10 of 14 sheet 1, 4, 5, 6 & 7 of 20, including earthing related Eric.catis Noted and incorporated C
comments
10 mm-sq Test 10mm-sq cable is missing. As
30. Noted, monitoring cables are provided in the
10 of 14 commented earlier minimum 2 CP cable-to-pipe Eric.catis C
IJTP which is very close to EBB .
connections are required.
31.
11 of 14 provide the distances Eric.catis Noted, These are internal components of PCR C
32.
11 of 14 Add what is missing in the legends Eric.catis Noted and added C
33.
11 of 14 Add in the Material List Eric.catis Noted and incorporated C
34.
11 of 14 add tag plate by BSS Eric.catis Noted and incorporated C
Incorporate all typical comments as marked in drawing
35.
13 of 14 sheet 1, 4, 5, 6 & 7 of 20, including earthing related Eric.catis Noted and incorporated C
comments
36.
13 of 14 Marked the polarity as applicable Eric.catis Noted and incorporated C
37.
13 of 14 missing label Eric.catis Noted and incorporated
C
Add in note: The Spark gap shall be installed correctly
38. across the MIJ unprotected (Spark Gap Body) and
14 of 14 Eric.catis Noted and incorporated C
protected (Spark Gap Cable Tail) side of the pipeline
interface (AG/UG respectively)
If this IJ is located in a plant with concrete paving, PVC
39.
14 of 14 Soil Access Pot shall be provided. Indicate the "Soil Eric.catis Noted and incorporated C
Access Pot" (Note, Applicable for Unsaved location)
40.
14 of 14 (Applicable for UnPaved location Eric.catis Noted and incorporated C
41. Provide detail for Spark Gap Cleat if not the same
14 of 14 Eric.catis Noted and incorporated C
dimension and holes size of Detail D

Legend (Status O\C) : O - Open / C – Closed Page 3 of 5


NC-200 ERAWIN FIELD EPF PHASE- I (PLAN B
42.
14 of 14 Unprotected Pipeline (AG) Eric.catis Noted and incorporated C
43.
14 of 14 Protected Pipeline (UG) Eric.catis Noted and incorporated C
44.
17 of 20 Describe or label the material, supplied by BSS Eric.catis Noted and incorporated
C
45. 17 of 20 Please delete if single connection is not applicable in
Eric.catis Noted, single connection applicable for EBB
any of the installation drawing details. C
46. 17 of 20
add the note 5 Eric.catis Noted and incorporated C
47. 17 of 20
Note 5 is missing Eric.catis Noted and incorporated
C
48. 17 of 20
provide material list and scope of supply Eric.catis Noted and incorporated C
49. 17 of 20
Describe or label the material, supplied by BSS Eric.catis Noted and incorporated C
50. 17 of 20 Show consistency in cable installation secured with
Eric.catis Noted and incorporated C
cable tie.
51. 17 of 20
Indicate Apllication Eric.catis Noted and incorporated C
52. Incorporate typical comments marked in drawing sheet
18 of 20 Eric.catis Noted and incorporated C
17.
53. Please delete if single connection is not applicable in
18 of 20 Eric.catis Noted, single connection applicable for EBB C
any of the installation drawing details.
54.
18 of 20 Note 5 is missing Eric.catis Noted and incorporated C
Add in note the allowed minimum wall thickness (mm)
55.
18 of 20 for pin brazing on to the existing/foreign pipeline, as Eric.catis Noted and incorporated C
per pin brazing manufacturer recommendation.
56.
18 of 20 list of material missing Eric.catis Noted and incorporated C
57.
18 of 20 Indicate Apllication Eric.catis Noted and incorporated
C
58. Incorporate typical comments marked in drawing sheet
19 of 20 Eric.catis Noted and incorporated
17. C
59.
19 of 20 ??? Eric.catis Noted and incorporated C
Provide the typical connection details consistently as
60.
19 of 20 per drawing sheet 11 of 20, delete details that are not Eric.catis Noted and incorporated C
applicable.
Legend (Status O\C) : O - Open / C – Closed Page 4 of 5
NC-200 ERAWIN FIELD EPF PHASE- I (PLAN B
61.
19 of 20 Note 5 is missing Eric.catis Noted and incorporated C
62.
19 of 20 list of material missing Eric.catis Noted and incorporated C
63.
19 of 20 Indicate Apllication Eric.catis Noted and incorporated C
64. Indicate the TR alarm system which automatically Noted, Refer G.A drawings (doc. No. ENG052-
20 of 20 Eric.catis C
signals when there is current interruption or AC failure 20ERW-PPFU001-D06-0002) for detailed view
65.
20 of 20 provide cable details Eric.catis Noted and incorporated C
66.
20 of 20 Cable gland missing Eric.catis Noted and incorporated C
67.
20 of 20 From TR Eric.catis Noted and incorporated C
68. Mention in the note if TR oil is supplied separately
20 of 20 Eric.catis Noted and incorporated C
(specify quantity) or filled in.
69.
20 of 20 provide gland deatils Eric.catis Noted and incorporated C
70.
20 of 20 Oil Drain Valve as per specs, not plug Eric.catis Noted and incorporated C
71. indicate required clamp to secure conduit in place. add
20 of 20 Eric.catis Noted and incorporated C
in the material list by others
72. provide cable gland hole details (AC & DC bottom
20 of 20 Eric.catis Noted and incorporated C
cabinet respectively)
Noted, All units are located inside plant /
73. C
20 of 20 Provide fencing details as indicative. Eric.catis stations and fencing details shall be advised
by PIUL.
74. Include DC-DC Controller mounting details if applicable
20 of 20 Eric.catis Noted and incorporated C
to pipelines drawings.

Name Noufal KP Name Farheen / Eric

Signature Signature
Date 25/11/22 Date 20/12/2022

Legend (Status O\C) : O - Open / C – Closed Page 5 of 5


NC-200 ERAWIN FIELD EPF PHASE- I (PLAN B)
CONTRACT NO: ENG052-20ERW

SUPPLIER DOCUMENT COVER SHEET

Supplier Name: BIN SARI SPECILIAZED TECHNOLOGIES


Purchase Order Number: JI2047-PPFU001
Purchase Order Title: CATHODIC PROTECTION SYSTEM
Equipment/Tag Number: NA
SDRL Code: B18
Supplier’s Document number: BSST -DR-CPJ212510- 002

Document total Pages : 24

Document Title: INSTALLATION DETAIL DRAWING FOR PIPELINE


CATHODIC PROTECTION SYSTEM
Document No: ENG052-20ERW-PPFU001-B18-0001
SUPPLIER DOCUMENT REVIEW

Purchaser’s review of this document does not relieve Seller of the responsibility for correctness under the purchase order
or contract. Permission to proceed does not constitute acceptance of design, detail and calculations, test methods or
materials developed or selected by the Seller and does not relieve the Seller from full compliance with the purchase order,
contract or any other obligations, nor detract from any of the Purchaser’s rights.

Reviewer Signature Date


Farheen / Eric 20/12/2022
CODE A Final: No Comment, document accepted. Do not re‐submit, except modified.
Revise and Re-issue. Work may not Proceed
CODE B
Revise and Re‐issue: Returned with comment, incorporate comments and re‐issue for review.
Revise document to address comments and issue as final. Work may Proceed
CODE C No re-submittal for review required if SUPPLIER agrees with and makes indicated document
changes. CONTRACTOR to resolve with Project Team if disagreement on making changes to address
comments
Review not required. Work may Proceed
CODE D
Incorporate comments and proceed. Do not re-issue for review, issue for Final Submission.
Rejected. Work may not Proceed
CODE R
Incorporate comments and re-issue for review. Work may NOT proceed.

Issue Record

03 Issued for Approval 25-11-2022 KPN MGS YMS

02 Issued for Approval 26-10-2022 KPN MGS YMS

01 Issued for Review 04-09-2022 KPN MGS YMS

Rev Purpose Date Prepared Checked Approved


NC-200 ERAWIN FIELD EPF PHASE- I
(PLAN B)
CONTRACT NO: ENG052-20ERW

Revision No. Date Author Scope / Remarks


01 04.09.2022 KPN Issued for Review

02 26.10.2022 KPN Issued for Approval

03 25.11.2022 KPN Issued for Approval

Holds List

S. No Reference Clause Remarks


NC-200 ERAWIN FIELD EPF PHASE- I
(PLAN B)
CONTRACT NO: ENG052-20ERW

Table of content
1. Installation Detail Drawing For Pipeline Cathodic Protection System 4