NC-200 ERAWIN FIELD EPF PHASE- I (PLAN B)

VENDOR COMMENTS RESPONSE SHEET

Document No. ENG052-20ERW-PPFU001-B18-0003 Rev No. ZLOG Transmittal No. Date

PFML Transmittal JI2047-PFML-PPFU001-T-033 03 30.12.2022

Page PETROFAC STATUS


SL No. VENDOR RESPONSE REMARKS
No. COMMENTS By (O\C)
1. Location of CP stations to be modified as per the plot
- Eric.catis Noted and incorporated Closed
plan

Name Noufal KP Name Digitally signed by Eric Catis

Eric Catis
DN: cn=Eric Catis, o=PETROFAC
INTERNATIONAL, ou=METALLURGY
Signature Signature DEPARTMENT,
email=eric.catis@petrofac.com, c=AE
Date: 2023.01.09 10:00:16 +04'00'
Date 30/12/22 Date

Legend (Status O\C) : O - Open / C – Closed Page 1 of 1


NC-200 ERAWIN FIELD EPF PHASE- I (PLAN B)
CONTRACT NO: ENG052-20ERW

SUPPLIER DOCUMENT COVER SHEET

Supplier Name: BIN SARI SPECILIAZED TECHNOLOGIES


Purchase Order Number: JI2047-PPFU001
Purchase Order Title: CATHODIC PROTECTION SYSTEM
Equipment/Tag Number: NA
SDRL Code: B18
Supplier’s Document number: BSST -DR-CPJ212510- 004

Document total Pages : 87

Document Title: OVERALL PIPELINE LAYOUT DRAWING FOR


CATHODIC PROTECTION SYSTEM
Document No: ENG052-20ERW-PPFU001-B18-0003
SUPPLIER DOCUMENT REVIEW

Purchaser’s review of this document does not relieve Seller of the responsibility for correctness under the purchase order
or contract. Permission to proceed does not constitute acceptance of design, detail and calculations, test methods or
materials developed or selected by the Seller and does not relieve the Seller from full compliance with the purchase order,
contract or any other obligations, nor detract from any of the Purchaser’s rights.

Reviewer Signature Date


Eric Catis
Digitally signed by Eric Catis
DN: cn=Eric Catis, o=PETROFAC INTERNATIONAL, ou=METALLURGY DEPARTMENT, email=eric.catis@petrofac.com, c=AE
Date: 2023.01.09 10:03:06 +04'00'

CODE A Final: No Comment, document accepted. Do not re‐submit, except modified.


Revise and Re-issue. Work may not Proceed
CODE B
Revise and Re‐issue: Returned with comment, incorporate comments and re‐issue for review.
Revise document to address comments and issue as final. Work may Proceed
CODE C No re-submittal for review required if SUPPLIER agrees with and makes indicated document
changes. CONTRACTOR to resolve with Project Team if disagreement on making changes to address
comments
Review not required. Work may Proceed
CODE D
Incorporate comments and proceed. Do not re-issue for review, issue for Final Submission.
Rejected. Work may not Proceed
CODE R
Incorporate comments and re-issue for review. Work may NOT proceed.

Issue Record

03 Issued for Approval 30-12-2022 KPN MGS YMS

02 Issued for Approval 15-11-2022 KPN MGS YMS

01 Issued for Review 17-10-2022 KPN MGS YMS

Rev Purpose Date Prepared Checked Approved


NC-200 ERAWIN FIELD EPF PHASE- I
(PLAN B)
CONTRACT NO: ENG052-20ERW

Revision No. Date Author Scope / Remarks


01 17.10.2022 KPN Issued for Review
02 15.11.2022 KPN Issued for Approval
03 30.12.2022 KPN Issued for Approval

Holds List

S. No Reference Clause Remarks


NC-200 ERAWIN FIELD EPF PHASE- I
(PLAN B)
CONTRACT NO: ENG052-20ERW

Table of content
1. Over All Layout Drawing For Pipeline Cathodic Protection System 4