Eng052-20erw-Ppfu001-n04-0003_02_a - Installation Procedure for Well Casing Cathodic Protection System
Eng052-20erw-Ppfu001-n04-0003_02_a - Installation Procedure for Well Casing Cathodic Protection System
16. Farheen
TR AC input and DC output Noted and updated C
Mevliwala
17
Add
17. Farheen
- conditions of silica gel verified Noted and updated
Mevliwala C
- cable lugs securely connected to terminal
Add:
- Anode to anode Spacing / Bottom anode spacing /
Total Number of Anodes/ Clearance above topmost
anode in active column
- Suspension rope secured to the support rod and
18. anode cables routed properly to the anode junction Farheen
13 Noted and updated C
box (AJB) without any damages and correctly Mevliwala
identified
- Coke breeze backfilled up to the specified level
of active column and individual / collective anode
resistances measured
- Native soil filled in inactiv column
PFML Representative Vendor Representative
Signature Signature
Purchaser’s review of this document does not relieve Seller of the responsibility for correctness under the purchase order
or contract. Permission to proceed does not constitute acceptance of design, detail and calculations, test methods or
materials developed or selected by the Seller and does not relieve the Seller from full compliance with the purchase order,
contract or any other obligations, nor detract from any of the Purchaser’s rights.
Issue Record
Holds List
Table of content
1. INTRODUCTION 4
2. SCOPE 4
3. REFERENCE DOCUMENTS 4
4. ABBREVIATION 5
5. RESPONSIBILITIES 6
6. EQUIPMENT 7
7. PROCEDURE 7
8. PRE-CAUTIONS 13
9. ATTACHMENT 13
9.1 QC FIELD RECORDS 13
NC-200 ERAWIN FIELD EPF PHASE- I
(PLAN B)
CONTRACT NO: ENG052-20ERW
1. INTRODUCTION
BSS Tech been retained by PETROFAC as CP vendor (P.O No: JI2047-PPFU001) to site survey,
detailed design, material supply, installation supervision and commissioning for various cathodic
protection systems for NC-200 ERAWIN FIELD EPF PHASE- I (PLAN B).
2. SCOPE
This procedure defines the methodology, requirements, responsibilities and equipment required
for the installation of the Impressed Current cathodic protection system for the following list (in
table#1) of well casing to ensure they conform to COMPANY specifications and other applicable
codes & standards.
Table#3
3.3 Project Documents
Document / Drawing No: Description
ENG052-20ERW PPFU001-
Installation Detail Drawing for Well Casing Cathodic Protection
B18-0004
ENG052-20ERW PPFU001- General Arrangement Drawing for Well Casing Cathodic
B18-0006 Protection System
ENG052-20ERW PPFU001- Schematic Diagram for Well Casing Cathodic Protection
B18-0005 System
ENG052-20ERW-PPFU001-
Test Facility And Cable Schedule for Well Casing Cathodic
E13-0002
Table#4
4. ABBREVIATION
Abbreviation Description
A : Ampere
AC : Alternate Current
AVO : Ampere-Voltage-Ohm.
cm : Centimetre
NC-200 ERAWIN FIELD EPF PHASE- I
(PLAN B)
CONTRACT NO: ENG052-20ERW
Abbreviation Description
CP : Cathodic Protection
DC : Direct Current
GI : Galvanized Iron
GPS : Global Positioning System
IP : Ingress Protection
JB : Junction Box
KM : Kilo Meter
kV : Kilovolt
M : Meter
mm : Millimeter
mV : MilliVolt
SP : Standard Practice
6. EQUIPMENT
1. Potentiometric multimeter having high input impedance.
2. Portable Cu/CuSo 4 reference electrode
3. Hand tools
4. Drilling rig and accessories
5. Crane for lowering scrap steel casing (if required)
6. Coke breeze mixture and water pump
7. PROCEDURE
7.1 INSTALLATION PROCEDURE OF DEEP WELL GROUND BED
The major steps involved in the installation of a deep anode system include drilling the hole, placing
the anodes in the hole, pumping the backfill into place and completing the installation to the surface.
The drilling and installation team shall make sure that all deep well borehole ground bed
components such as, MMO anode, coke breeze, vent pipe, anode centralizers etc. are available
at site prior to commencing drilling to avoid possible delays.
The first step of the installation process involves drilling the hole. The exact location of the deep
well borehole ground bed shall be marked on site as per the appropriate layout drawing and cable
routing of well casing. Prior to any drilling or other excavation works, the chosen site shall be
thoroughly surveyed to ensure that there are no underground facilities at the location of the ground
bed.
A suitable drilling rig shall be mobilized to site and positioned at the ground bed location. Depending
upon the specific geology, the drilling operator shall drill a hole with air or mud circulation. If the
drilling equipment is undersized for the diameter and depth of hole to be drilled, the probability of
having hole problems will increase significantly. Therefore, an investigation of the drilling
equipment shall be checked prior to construction activity. In order to minimize installation problems,
the hole needs to be straight, stable and free of obstructions or constrictions.
An 8” diameter hole shall be drilled using the drilling rig. The depth of the borehole shall be drilled
to a depth 3 to 5 m deeper than the proposed total depth of the borehole column. This will insure
that in the event of a partial collapse of the borehole the ground bed materials can be installed
smoothly to the required depth.
There are two primary types of tests performed during the drilling process to provide decision
making data. Both tests are used to estimate formation resistivity.
• The first test involves measurement of the resistivity of the cuttings screened from the fluid
circulation steam. The cuttings are accumulated and compacted tightly into a soil box. The
test procedure involves calculating the resistance of the sample taken at every 10 m depth
between the potential pins and determining the resistivity from the soil box using Wenner
4 pin method.
NC-200 ERAWIN FIELD EPF PHASE- I
(PLAN B)
CONTRACT NO: ENG052-20ERW
• The second test that may be performed during the drilling process to help determine the
water resistance is a drill stem-to-earth resistance. This test is usually conducted when
the top of the drill stem has reached the bottom of its travel distance just before adding
another length on the surface should be positioned for maximum test depth before the first
test measurement.
As sealed casing strings are installed, the placement of the backfill on the inside and outside of the
casing has to take place in two different operations. Care must be exercised to avoid significant
differential pressures across the casing walls capable of bursting the casing. One method of
reducing the differential pressures is to maintain heavy drilling mud on the opposite side of the
casing wall from the backfill pumping operation.
6. The above said process shall continue still the whole drilling complete.
7. Record the measured readings in field record#BSST-QAQC-CPJ212510-008FR-1.
All the anode tail cables shall be properly marked and tagged. A minimum waiting period of 24
hours after the final pumping is recommended to allow carbon backfill settling before final the
completion of hole.
Final completion of the deep anode system is accomplished by sealing the top portion of the hole
to prevent the entrance of surface groundwater. One easy method of sealing the upper portion of
a deep anode system involves pouring dry bentonite pellets or the drilled natural into the hole from
the surface.
The surface casing pipe shall be secured in concrete foundation and the anode tail cables shall be
brought to the anode junction box and terminate as shown in the installation drawing# ENG052-
20ERW PPFU001-B18-0004.
After the anodes are lowered into the bore hole and backfilling a resistance measurement should
be recorded between the anode tail cable and earth. Resistance shall be calculated by 3pin
method. Anode shall be considered as the first pin and fix the second and third pins at distances
from the anode and as recommended by the manufacturer of resistivity meter or as described
below.
1. Galvanized mounting frames for anode junction box shall be cast in to a concrete plinth
complete with cable duct. Once the concrete plinth shall be cured, the junction box shall
be secured to the frame.
2. Anode feeder cables shall be connected to the appropriate terminals inside the anode
junction box with supplied lugs, nuts and markers. # ENG052-20ERW PPFU001-B18-
0004.
3. The positive cable from the Transformer Rectifier shall be terminated to the bus bar inside
the AJB.
4. All cables shall be pulled through the conduit and terminated in the AJB. The conduits
shall have appropriate long radius to facilitate easy pulling of cables to JBs and entry shall
NC-200 ERAWIN FIELD EPF PHASE- I
(PLAN B)
CONTRACT NO: ENG052-20ERW
be at side of the concrete foundation. Cut the cable to a suitable length and terminated
using compression cable lugs.
5. Extra care should be given while pulling and laying the cable to save the cable from any
damage. A stress relief loop shall be provided in each cable and sufficient slack shall be
included near termination points.
6. No joint in cable shall be permitted.
For more details Please refer drawing # ENG052-20ERW PPFU001-B18-0004 and all the
reading/observation shall be recorded. # BSST-QAQC-CPJ212510-015FR-3.
12. Check the visual condition of Transformer Rectifier once the installation is completed.
13. Before energizing the system, fill oil in Transformer Rectifier. The oil level shall be at least
in between the maximum.
For more details refer drawing ENG052-20ERW-PPFU001-B18-0001 and G.A drawings of
Transformer Rectifier in the document (ENG052-20ERW-PPFU001-D06-0002).
All the reading/observation shall be recorded. # BSST-QAQC-CPJ212510-015FR-4.
8. PRE-CAUTIONS
1. Work permits are to be obtained from company before the start of any work.
2. The CP vendor site representative will supervise the installation activities.
3. Only CP qualified competent person shall carry the tests.
4. All the personnel present in the site should wear their Personal Protective Equipment’s.
5. Handle the anode carefully while installation.
6. Strictly follow the safety driving rules
7. Insists on a good housekeeping at all the time.
9. ATTACHMENT
Location #: Date:
JB ID : Co-ordinates :
TEST RESULTS: -
1. Area/Location
2. Type of anode
3. No. of anodes
Page 1 of 2
SL# Items to Check/ Inspection Observations Remarks
General Notes:
Page 2 of 2
DRILL STEM RESISTANCE RECORD
Location #: Date
Project: NC-200 ERAWIN FIELD EPF PHASE- I Reference Drawing : ENG052-20ERW -PPFU001-B18-
(PLAN B) 0004
Serial
Depth Pin Spacing Resistance Resistivity Remarks
#
Page 1 of 1
ANODE JUNCTION BOX INSTALLATION INSPECTION RECORD
TEST RESULTS: -
General Notes:
Page 1 of 1
TRANSFORMER RECTIFIER INSTALLATION INSPECTION RECORD FOR
WELL CASING
Client: ZALLAF LIBYA OIL GAS Doc No : BSST-QAQC-CPJ212510-015FR-4
Project: NC-200 ERAWIN FIELD EPF PHASE- I (PLAN
Rec.#
B)
Area/Location: Date:
Reference Drawing : ENG052-20ERW- PPFU001-B18-
Well ID:
0004
DC Input : DC Output
TR ID#:
SL# Items to check/ inspection Observations Remarks
1. Visual Inspection of the TR unit
2. Check the transformer rectifier has been installed as
per the installation drawing.
3. Check the cable sizes.
Page 1 of 1
SL# Items to check/ inspection Observations Remarks
18. checking visual the TR conditions for any dent,
damages, missing components, lose wiring and oil
leak.
Page 2 of 1
ANODE RESISTANCE MEASUREMENT
Location/JB ID #: Date
Project: NC-200 ERAWIN FIELD EPF PHASE- I Reference Drawing : ENG052-20ERW -PPFU001-
(PLAN B) B18-0004
Note: -
Page 1 of 1