Zallaf Libya Exploration and Production of Oil & Gas Company

DOCUMENT TRANSMITTAL

TRANSMITTAL NO: PFML-ZLOG-TRE-02202

DOCUMENT NO DOCUMENT TITLE


ENG052-20ERW-PPFU001-B18-0006_02 INSTALLATION AND PIPING LAYOUT DRAWING
FOR CATHODIC PROTECTION SYSTEM

APPROVAL CODE STAMP

Lazhar Touati 28th Dec 2023


NC-200 ERAWIN FIELD EPF PHASE- I (PLAN B)

VENDOR COMMENTS RESPONSE SHEET

Document No. ENG052-20ERW-PPFU001-B18-0006 Rev No. ZLOG Transmittal No. Date

PFML Transmittal JI2047-PFML-PPFU001-T-045 02 12.06.2023

Page PETROFAC STATUS


SL No. VENDOR RESPONSE REMARKS
No. COMMENTS By (O\C)

BOQ shall be based on approved design document,


1. which not available. CP Vendor to ensure to submit the
4
design document prior to the next revision of this
Eric Catis Noted and Incorporated C
drawing.

2. Provide Cable & Test Facilities Schedule and indicate


4
the coordinates
Eric Catis Noted and Incorporated C
3. Add the missing soil access pot where. Include in the
4
legend & BOQ.
Eric Catis Noted and Incorporated C

4. Indicate the SS & CS Pipe


4 Eric Catis Noted and Incorporated C

5. Provide cable to pipe connection details.


4 Eric Catis Noted and Incorporated C

Name Noufal KP Name

Signature Signature

Date 19/10/23 Date

Legend (Status O\C) : O - Open / C – Closed Page 1 of 1


NC-200 ERAWIN FIELD EPF PHASE- I (PLAN B)
CONTRACT NO: ENG052-20ERW

SUPPLIER DOCUMENT COVER SHEET

Supplier Name: BIN SARI SPECILIAZED TECHNOLOGIES


Purchase Order Number: JI2047-PPFU001
Purchase Order Title: CATHODIC PROTECTION SYSTEM
Equipment/Tag Number: NA
SDRL Code: B18
Supplier’s Document number: BSST -DR-CPJ212510-009

Document total Pages : 15

Document Title: INSTALLATION AND PIPING LAYOUT DRAWING


FOR CATHODIC PROTECTION SYSTEM
Document No: ENG052-20ERW-PPFU001-B18-0006
SUPPLIER DOCUMENT REVIEW

Purchaser’s review of this document does not relieve Seller of the responsibility for correctness under the purchase order
or contract. Permission to proceed does not constitute acceptance of design, detail and calculations, test methods or
materials developed or selected by the Seller and does not relieve the Seller from full compliance with the purchase order,
contract or any other obligations, nor detract from any of the Purchaser’s rights.

Reviewer Signature Date

CODE A Final: No Comment, document accepted. Do not re‐submit, except modified.


Revise and Re-issue. Work may not Proceed
CODE B
Revise and Re‐issue: Returned with comment, incorporate comments and re‐issue for review.
Revise document to address comments and issue as final. Work may Proceed
CODE C No re-submittal for review required if SUPPLIER agrees with and makes indicated document
changes. CONTRACTOR to resolve with Project Team if disagreement on making changes to address
comments
Review not required. Work may Proceed
CODE D
Incorporate comments and proceed. Do not re-issue for review, issue for Final Submission.
Rejected. Work may not Proceed
CODE R
Incorporate comments and re-issue for review. Work may NOT proceed.

Issue Record

02 Issued for Approval 19-10-2023 KPN MGS YMS

01 Issued for Review 05-04-2023 KPN MGS YMS

Rev Purpose Date Prepared Checked Approved


NC-200 ERAWIN FIELD EPF PHASE- I
(PLAN B)
CONTRACT NO: ENG052-20ERW

Revision No. Date Author Scope / Remarks


01 05.04.2023 KPN Issued for Review
02 19.10.2023 KPN Issued for Approval

Holds List

S. No Reference Clause Remarks


NC-200 ERAWIN FIELD EPF PHASE- I
(PLAN B)
CONTRACT NO: ENG052-20ERW

Table of content
1. Layout & Installation Detail Drawing For Plant Piping Cathodic Protection System 4