OWNER CONSULTANT CONTRACTOR

PROJECT NAME: CEER NATIONAL AUTOMOTIVE COMPANY LOCATION: RIYADH

SHOP D R A W I N G SUBMITTAL
TYA- CEER-STL-EL-0012-
NEW SUBMITTAL ü RE-SUBMITTAL SUBMITTAL DATE: B101-Jun-23 SUBMITTAL NO.:
R1

PURPOSE OF SUBMITTAL: ü FOR APPROVAL FOR COMMENTS FOR INFORMATION

DRAWING
ARCHITECTURAL STRUCTURAL CIVIL ü ELECTRICAL
DISCIPLINE
H. V. A. C. PLUMBING OTHERS……. Specify:

TYPE OF DRAWING ü SHOP DRAWING AS-BUILT DRAWING VENDOR DRAWING OTHERS

DRAWINGS NOTE: PLEASE USE THE ATTACHMENT IN CASE ITEMS ARE MORE THAN THE PROVIDED SPACE
S. No. DRAWING NO. NO. OF COPIES ITEM DESCRIPTION REVISION NO. APPROVAL STATUS
BLOCK4
1 CEER-SD-EL-B4-CCTV-01 00 CLOSED CIRCUIT TELEVISION SYSTEM 01
BLOCK4
(CCTV) LAYOUT 1/2
2 CEER-SD-EL-B4-CCTV-02 00 CLOSED CIRCUIT TELEVISION SYSTEM 01
(CCTV) LAYOUT 2/2
3
4
5
6
7
8
9
10

SUBMITTED BY: Mohammed Ellaimony MEP Project Manager 1-Jun-2023


NAME SIGNATURE DESIGNATION DATE SUBMITTED

CONTRACTOR REMARKS: We clarify that the above submittal is strictly adhered with contractor drawing & specifications except otherwise as stated below.

EXCEPTIONS:

CONSULTANTS RECOMMENDATION: Approval of the above does not relieve the contractor from his contractual obligations.

CONTRACTOR CONSULTANT OWNER REPRESENTATIVE


NAME: Maher Abbas NAME: NAME:
POSITION: Project Manager POSITION: POSITION:
SIGNATURE: SIGNATURE: SIGNATURE:
NAME: Mohammed Ellaimony
POSITION: MEP Project Manager
SIGNATURE:
DATE: 1-Jun-23 DATE: DATE:
APPROVED AS NOTED
A APPROVED AS SUBMITTED B APPROVED AS NOTED RESUBMITAL NOT REQUIRED C RESUBMITTAL IS REQUIRED
APPROVAL STATUS:
D DISAPPROVED E NO ACTION

RECEIVED BY: SIGNATURE: RECEIVED BY: SIGNATURE:


(CONSULTANT) DATE: (CONTRACTOR) DATE: