OWNER CONSULTANT CONTRACTOR

PROJECT NAME: CEER NATIONAL AUTOMOTIVE COMPANY LOCATION: RIYADH

SHOP D R A W I N G SUBMITTAL
TYA- CEER-STL-EL-0031-
NEW SUBMITTAL ✓ RE-SUBMITTAL SUBMITTAL DATE: 11-Jul-23 SUBMITTAL NO.:
R1

PURPOSE OF SUBMITTAL: ✓ FOR APPROVAL FOR COMMENTS FOR INFORMATION

DRAWING
ARCHITECTURAL STRUCTURAL CIVIL ✓ ELECTRICAL

DISCIPLINE
H. V. A. C. PLUMBING OTHERS……. Specify:

TYPE OF DRAWING ✓ SHOP DRAWING AS-BUILT DRAWING VENDOR DRAWING OTHERS

DRAWINGS NOTE: PLEASE USE THE ATTACHMENT IN CASE ITEMS ARE MORE THAN THE PROVIDED SPACE
S. No. DRAWING NO. NO. OF COPIES ITEM DESCRIPTION REVISION NO. APPROVAL STATUS

1 CEER-EL-SD-B3-FA-01 00 BLOCK 3 LOW LEVEL FIRE ALARM LAYOUT LAYOUT 1/2 01


2 CEER-EL-SD-B3-FA-02 00 BLOCK 3 LOW LEVEL FIRE ALARM LAYOUT LAYOUT 2/2 01
3 CEER-EL-SD-B3-FA-03 00 BLOCK 3 HIGH LEVEL FIRE ALARM LAYOUT LAYOUT 1/2 01
4 CEER-EL-SD-B3-FA-04 00 BLOCK 3 HIGH LEVEL FIRE ALARM LAYOUT LAYOUT 2/2 01
5
6
7
8
9
10

SUBMITTED BY: Maher Abbas Project Manager


NAME SIGNATURE DESIGNATION DATE SUBMITTED

CONTRACTOR REMARKS: We clarify that the above submittal is strictly adhered with contractor drawing & specifications except otherwise as stated below.

EXCEPTIONS:

9. M in round shape indicate intelligent smoke detector as per BOQ.


CONSULTANTS RECOMMENDATION: Approval of the above does not relieve the contractor from his contractual obligations.

1. All Material used shall be as per approved Material submittal.


2. Addressable fire alarm system to be used as per project specs.
3. All Repeater panel and main panel for all block shall be interface with Main panel of Block 4B Office.
4. All flow switches, ZCV and necessary fire fighting system, Novec system etc shall interface with Main Fire Alarm panel located at office 4B
5. All access door shall interface with FAS.
6. PAS system shall be interface with MFACP.
7. Location of CM for smoke fane and HVAC equipment shall be as per approved mechanical layout
8. All detector installed at false ceiling area shall be as per approved reflected ceiling plan
CONTRACTOR CONSULTANT OWNER REPRESENTATIVE
NAME: NAME: Hasnat Safdar NAME:

POSITION: POSITION: Electrical Engineer POSITION:

SIGNATURE: SIGNATURE: SIGNATURE:

DATE: DATE: 14-07-2023 DATE:


APPROVED AS NOTED RESUBMITAL NOT APPROVED AS NOTED RESUBMITTAL
A APPROVED AS SUBMITTED B REQUIRED C IS REQUIRED
APPROVAL STATUS:
D DISAPPROVED E NO ACTION

RECEIVED BY: SIGNATURE: RECEIVED BY: SIGNATURE:

(CONSULTANT) DATE: (CONTRACTOR) DATE: