QC 08 & 09 Mechanical Punch Point
cha
GROUP/
nic DEVICE/ CRANE- 8 CRANE- 9 MICT Remarks ZPMC Remarks ZPMC Site MICT Remarks Crane Shutdown
SR. ASSEMBL LOCATION Description of Finding Targat Date
al Y
COMPONENT Status Status 10-11-2023 (10-11-2023) Comments 22-12-2023 Hr/(Timeline)
Pu Aux Railing/ladder/step/
hoop/Safety guard
Machine Room Covering Grill near service brake : for manual release
operation, door locking is not proper and door is
nc4 deemed not strong enough. brake cover locking is not closed OPEN Open
(QC 08 completed
on 16-02-2024) 5Hr
proper.
h
Poi
5
Aux Railing/ladder/step/ Operator Cabin operator cabin emergency ladder hoop need to more
closed OPEN Open
(QC 08 completed on
2Hr
hoop/Safety guard strengthen. 16-02-2024)
nts Aux Railing/ladder/step/ Machine Room Hatch cover on left and right side need bigger size for The arrangement is
hoop/Safety guard trolley wheel maintance. approved as Per
6 OPEN OPEN Open
Design kindly close
this point
Aux Documentation All Documents : All Electrical / mechanical manuals, All Documents
drawings / test certificate , BOM , quality reports , to are Handed
be provided in soft / hard copy not yet handed over Partial (hard and soft EOT drawing hand
10 OPEN OPEN copies) Open Over. Pls share over pending
the name plate
of EOT crane
Aux Railing/ladder/step/ Portal beam HV Cable Safety guard not provided on GCR station. Brake
11 hoop/Safety guard reel assembly of HVD motor can not possible to open due OPEN OPEN Open As Per the
to railing obstraction. Design.

14 Boom Boom motor Encoder Machine Room Boom hoist encoder protection guard required OPEN OPEN Open Not Possible
EOT crane Roller Machine Room EOT sea side hoist drum roller not available. We'll purchase
17 OPEN OPEN Open new one. 12Hr
Spreader Railing/ladder/step/hoop All spreader spreader ladder need to be modified, difficult while
29 going into spreader while connected with head frame. OPEN OPEN Open As Per Design
spreader spreader cable plug Headframe spreader cable plug on head frame required on land Spreader cable
CABLE side instead of sea side. (QC 08 Completed plug mounted at
on 16-02-2024 the Land Side as
30 closed closed Open QC 09 completed required by Engg. CLOSED
on 07-03-2024) Team.